International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP5B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5B  C 

ITU-R WP5B

Maritime mobile service including Global Maritime Distress and Safety System (GMDSS); aeronautical mobile service and radiodetermination service

Results:822 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 22 ]  
 
Working document towards preliminary draft revision of Resolution 155 (Rev.WRC-19) - WRC-23 agenda item 1.8     Iran (Islamic Republic of)   AI1.8   2020-06-07
[ 21 ]  
 
Liaison statement to Working Parties 5A and 5B (copy for information to Working Parties 3M and 5C) - WRC-23 agenda item 1.15     WP 4A   AI1.15   2020-06-08
[ 20 ]  
 
Preliminary position on WRC-23 agenda     World Meteorological Organization     2020-05-13
[ 19 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C (copy to Working Parties 3J and 3M for information) - Request system characteristics of primary services to be used for sharing and compatibility studies in the frequency range 231.5-252 GHz and adjacent bands     WP 7C     2020-04-30
[ 18 ]  
 
Liaison statement to Working Parties 3M, 5A, 5C, 7C and 7D requesting characteristics for use in sharing studies under WRC-23 agenda item 1.13 (Working Party 5B for information and action if appropriate)     WP 7B   AI1.13   2020-04-28
[ 17 ]  
 
Liaison statement to Working Parties 1B, 5B, 5C and 7D - ITU-R Preparations for WRC-23 agenda item 1.1     WP 5D   AI1.1   2020-03-06
[ 16 ]  
 
Liaison statement to Working Parties 3K and 3M (for information to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D) - Preparations for WRC-23 agenda items 1.1 and 1.2     WP 5D   AI1.2, AI1.1   2020-03-06
[ 15 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 7B and 7C - Preparations for WRC-23 agenda item 1.2     WP 5D   AI1.2   2020-03-06
[ 14 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, and 7D - Information for studies on WRC-23 agenda item 1.4     N/A   AI1.4   2020-03-06
[ 13 ]  
 
Liaison statement to ITU-R Working Party 3K (copy for information to Working Party 5B) - Valid frequency range and polarization applicability of Recommendation ITU-R P.528-4     International Civil Aviation Organization     2020-03-02
[ 12 ]  
 
Reply liaison statement to ITU-R Working Party 5B (copy for information to Working Party 7C) - Deployment of Foreign Object Debris detection radars in the 92-100 GHz frequency range at airports globally     International Civil Aviation Organization     2020-03-02
[ 11 ]  
 
The revision of Recommendation ITU-R M.1371-5 - Technical characteristics for an automatic identification system using time division multiple access in the VHF maritime mobile frequency band     Comité International Radio-Maritime (CIRM)     2020-03-02
[ 10 ]  
 
The revision of Recommendation ITU-R M.585-7 - Assignment and use of identities in the maritime mobile service     Comité International Radio Maritime (CIRM)     2020-03-03
[ 9 ]  
 
Problem related to freeform numbering of survivor location AID devices (AIS-SART, MOB, EPIRB-AIS, PLB-AIS)     Comité International Radio-Maritime (CIRM)     2020-03-02
[ 8 ]  
 
Report of the fifteenth meeting of the joint IMO/ITU Experts Group on maritime radiocommunication matters     International Maritime Organisation     2020-02-27
[ 7 ]  
 
Liaison statement to CEPT ECC (copy for information to ITU-R Working Parties 4C, 5B and 5D, ICS and IMSO) - Protection of L-band maritime satellite communications     International Maritime Organisation     2020-02-27
[ 6 ]  
 
Liaison statement to Working Party 5B - Protection requirements for the HF Broadcasting Service relative to WRC-23 agenda item 1.9     WP 6A   AI1.9   2020-02-13
[ 5 ]  
 
Liaison statement to ITU-R Working Party 5B on assignment and use of identities in the Maritime Mobile Service     International Maritime Organization     2020-02-13
[ 4 ]  
 
Liaison statement to Task Group 6/1 (copy to Working Parties 3K, 3M, 5A, 5B, 5C and 5D) - WRC-23 agenda item 1.5     WP 6A     2020-02-12
[ 3 ]  
 
Liaison statement to Working Parties 5A and 5C and for information to Working Parties 4C, 5B and 5D - Resolution ITU-R 59-2 and related work within Working Party 6A     WP 6A     2020-02-12
[ 2 ]  
 
Working Party 5A Preparatory work for WRC-23 (copy for information to Working Parties 5B, 5C and 5D)     Chairman, WP 5A     2020-01-09
[ 1 ]  
 
Documents to be carried over from the 2015-2019 study period     WP 5B     2019-10-31
Results:822 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2023-11-01