International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:915 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 115 ]  
 
Comments on Annex 11 to Working Party 4A Chairman's Report - Working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz     Iran (Islamic Republic of)   AI1.15   2016-09-19
[ 114 ]  
 
Comments to Annex 10 to Working Party 4A Chairman's Report - Working document on WRC-19 agenda item 1.4 ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev. WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions     Iran (Islamic Republic of)     2016-09-18
[ 113 ]  
 
Comments on Annex 9 to Working Party 4A Chairman's Report - Working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9     Iran (Islamic Republic of)   AI9.1   2016-09-18
[ 112 ]  
 
Comments on Annex 8 Working Party 4A Chairman's Report - Working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on spectrum needs - WRC-19 agenda item 9.1, issue 9.1.9     Iran (Islamic Republic of)   AI9.1   2016-09-18
[ 111 ]  
 
Comments on Annex 7 to Working Party 4A Chairman's Report - Working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on the protection of EESS (passive) and RAS systems from non-GSO satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands under WRC-19 agenda item 1.6     Iran (Islamic Republic of)   AI1.6   2016-09-18
[ 110 ]  
 
Comments on Annex 5 to Working Party 4A Chairman's Report - Woking document [TOWARDS A PRELIMINARY DRAFT NEW RECOMMENDATION/REPORT] ITU-R.S[NGSO_6/4-GHZ] on technical and regulatory studies for 6/4 GHz GSO/Non-GSO FSS sharing - WRC-19 agenda item 9.1, issue 9.1.3     Iran (Islamic Republic of)   AI9.1   2016-09-18
[ 109 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-19     Chairman, CPM-19     2016-09-19
[ 108 ]  
 
Excessive notified characteristics of recorded frequency assignments of GSO satellite networks and treatment of frequency assignments with a bandwidth less than the stated averaging bandwidth     Director, BR     2016-09-14
[ 107 ]  
 
List of affected frequency assignments for satellite networks identified under No. 9.36.2 of the Radio Regulations (WRC-19 agenda item 7)     Korea (Republic of)   AI7   2016-09-13
[ 106 ]  
 
Liaison statement to Working Party 5B (copied to Working Party 4A for information) - Update on ICAO UAS/RPAS SARPS activities     International Civil Aviation Organization     2016-09-09
[ 105 ]  
 
Liaison statement to Working Party 4A (copied to Working Party 5B for information) - Update on ICAO UAS/RPAS SARPS activities     International Civil Aviation Organization     2016-09-09
[ 104 ]  
 
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (Issue 9.1.2)     Japan   AI9.1   2016-09-08
[ 103 ]  
 
Report of the Twelfth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters     International Maritime Organization     2016-08-25
[ 102 ]  
 
Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.11A, 9.12, 9.12A and 9.13 or 9.21     United Kingdom of Great Britain and Northern Ireland     2016-07-20
[ 101 ]  
 
Reply liaison statement to Working Parties 1A, 5A and 5C (copied for information to Working Parties 4A, 5D, 6A, 7C and 7D) - Propagation characteristics in the frequency range 275-450 GHz in preparation for WRC-19 agenda item 1.15     WPs 3K and 3M   AI1.15   2016-07-06
[ 100 ]  
(Rev.1) 
Reply liaison statement to Working Party 7D (copied for information to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and Task Group 5/1) - Propagation data and predictions for coexistence and compatibility studies above 50 GHz     WPs 3K and 3M     2016-07-04
[ 99 ]  
 
Reply liaison statement to Working Party 5C (copied for information to Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and TG 5/1) - Propagation data and prediction methods required for coexistence and compatibility studies for High-Altitude Platform Stations (HAPS)     WP 3M     2016-07-04
[ 98 ]  
 
Reply liaison statement to Working Parties 5B and 7B (copied to Working Parties 4A, 4C, 5A, 5C, 5D and 7D for information) - ITU-R propagation models for use in aeronautical propagation scenarios     WPs 3K and 3M     2016-07-01
[ 97 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz     WP 3J     2016-07-01
[ 96 ]  
 
Liaison statement to Working Parties 4A & 4C - Coordination of work on anticipated draft CPM text deadlines for WRC-19 agenda items / issues where Working Party 5D is a jointly responsible group     WP 5D     2016-06-29
[ 95 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B, 5C & 7B - Request for information on anticipated draft CPM text deadlines by responsible groups for WRC-19 agenda items / issues where Working Party 5D is a contributing group     WP 5D     2016-06-29
[ 94 ]  
 
Liaison statement concerning the publication of an ETSI Technical Report - ETSI TR 103 233: "Antenna performance characterization for GSO mobile applications"     European Telecommunications Standards Institute     2016-06-29
[ 93 ]  
 
Liaison statement to Working Parties 4A, 4C, 6A and 7B (copied to Working Parties 3J, 3K, 3M and Task Group 5/1 for information) - Modelling and simulation of IMT networks for use in sharing and compatibility studies     WP 5D     2016-06-28
[ 92 ]  
 
Reply liaison statement to Working Party 4A - WRC-19 agenda item 9.1, issue 9.1.2     WP 5D   AI9.1   2016-06-28
[ 91 ]  
 
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7     WP 5D   AI1.7   2016-06-24
[ 90 ]  
 
Liaison statement to Working Party 4A - Assessment of potential interference from IMT small cell deployment to FSS earth stations within the band 3 400-3 600 MHz     WP 5D     2016-06-23
[ 89 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5B and 5C) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA] - A guiding methodology for providing compatibility between ubiquitously deployed earth stations of the fixed-satellite service and stations of the fixed and/or mobile services in adjacent areas for the cases ...     WP 5D     2016-06-23
[ 88 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7D and 3M for information) - WRC-19 agenda item 9.1, issue 9.1.9     WP 5D   AI9.1   2016-06-23
[ 87 ]  
 
Liaison response to Working Party 5A (copy to Working Parties 4A, 4B, 4C and ITU-T Study Group 17) - Network security requirements for Public Protection and Disaster Relief and Emergency Communication     WP 5D     2016-06-23
[ 86 ]  
 
Liaison statement to Working Party 4A - Clarification of terms used in Recommendation ITU-R S.1503-2     WP 1B     2016-06-22
[ 85 ]  
 
Liaison statement to Working Parties 1C and 4A (WRC-19 agenda item 9.1, issue 9.1.7) - Studies on managing uplink transmissions of terminals to be limited to authorized terminals     WP 1B   AI9.1   2016-06-20
[ 84 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz     WP 1A     2016-06-13
[ 83 ]  
 
Liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 4A, 5A, 5C, 5D, 6A, 7C and 7D) - Propagation characteristics in the range 275-450 GHz in preparation for WRC-19 agenda item 1.15     WP 1A   AI1.15   2016-06-13
[ 82 ]  
 
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 3J, 3K, 3M, 4A, 5A, 5C, 5D and 6A) - Request for characteristics of passive systems operating in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15     WP 1A   AI1.15   2016-06-13
[ 81 ]  
 
Liaison statement to ITU-T Study Group 5 and ITU-D Study Group 2 (copy for information to ITU-R Working Parties 4A, 5A, 5B, 5C, 5D and 6A) - WHO:fundamental safety principles for protection against non-ionizing radiation     SG 1     2016-06-13
[ 80 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing...     WP 1B     2016-06-13
[ 79 ]  
 
Preparations for WRC-19 agenda item 1.13     Chairmen, WPs 4A and 4B   AI1.13   2016-06-10
[ 78 ]  
 
Liaison statement to ITU-R Working Parties 5A and 5C (copy to ITU-R Working Parties 3J, 3K, 3M, 4A, 5D, 6A, 7C and 7D) - Preparations for WRC-19 agenda item 1.15 - Request for characteristics of land-mobile and fixed service applications in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15     WP 1A   AI1.15   2016-06-08
[ 77 ]  
 
Liaison statement to Working Party 5D (copied for information to Task Group 5/1) - Propagation advice in support of agenda item 1.13: input requested from Working Party 5D     Chairmen, SG 3, WP 3J, WP 3K and WP 3M   AI1.13   2016-06-01
[ 76 ]  
 
Liaison statement to Working Parties 4A, 4C, 5B and 5C (copied for information to Working parties 1B, 3J, 3K, 3M and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16     WP 5A   AI1.16   2016-05-25
[ 75 ]  
 
Reply liaison statement to Working Party 6B on Global Platform for the Broadcasting Service (copy for information to ITU-R WPs 4A, 4B and 5B, 5C, 5D, ITU-T SGs 9 and 16)     WP 5A     2016-05-25
[ 74 ]  
 
Liaison response to ITU-T SG 17 (copy to Working Parties 4A, 4B, 4C and 5D) - Network security requirements for Public Protection and Disaster Relief and Emergency Communication     WP 5A     2016-05-25
[ 73 ]  
 
Liaison statement to Working Party 4A (copied to Working Parties 5B, 5C and 5D for information) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]     WP 5A     2016-05-25
[ 72 ]  
 
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7     WP 5A   AI1.7   2016-05-25
[ 71 ]  
 
Liaison statement to Working Parties 1A, 1B, 4A, 5B, 5C and 5D - Study of sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications     WP 5A     2016-05-25
[ 70 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Preparation for WRC-19 agenda item 1.13     TG 5/1   AI1.13   2016-05-25
[ 69 ]  
 
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5B and 6A) - WRC-19 agenda item 1.7     WP 5C   1.7   2016-05-24
[ 68 ]  
 
Liaison statement to Working Parties 3K & 3M (copy for information to Working Parties 5A, 5C, 5D, 4A, 4C, 7B and 7D) - Questions for Working Parties 3K and 3M on ITU-R propagation Recommendations used by Working Party 5B     WP 5B     2016-05-23
[ 67 ]  
 
Liaison statement to Working Party 4A - Technical characteristics of aeronautical mobile service systems including aeronautical mobile telemetry in the frequency bands 4 500-4 800 MHz and 5 925-6 425 MHz     WP 5B     2016-05-23
[ 66 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5B and 5D) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]     WP 5C     2016-05-20
Results:915 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-10-18