International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP3M : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP3M  C 

ITU-R WP3M

Point-to-point and Earth-space propagation

Results:257 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 182 ]  
 
Final list of participants - Working Party 3M (Geneva, 2-10 September 2014)     Director, BR     2014-10-09
[ 181 ]  
 
List of documents issued (Documents 3M/123 - 3M/181)     BR Study Groups Department     2014-08-29
[ 180 ]  
 
Report on the activities of the CG-3J-6: map of atmospheric refractivity     Correspondence Group 3J-6     2014-08-26
[ 179 ]  
 
Information document on KA and Q band Alphasat Aldo TDP5 slant path measurements in Austria     France , European Space Agency     2014-08-26
[ 178 ]  
 
Information document about Earth-space land mobile model satellite navigation requirements not fully addressed by ITU-R P.681     France , European Space Agency     2014-08-26
[ 177 ]  
 
Proposed revision of Recommendation ITU-R P.1621-1     France     2014-08-26
[ 176 ]  
 
Working document towards a revision of Recommendation ITU-R P.681     France , European Space Agency , European Union     2014-08-26
[ 175 ]  
 
Measurement of Ka-band propagation data for geostationary satellite services to the high north for information     Telenor ASA     2014-08-26
[ 174 ]  
 
Proposed revision to Recommendation ITU-R P.530-15: combined method for rain and wet snow     United Kingdom of Great Britain and Northern Ireland     2014-08-26
[ 173 ]  
 
Contribution to ITU-R Study Group 3 databanks     Korea (Republic of)     2014-08-26
[ 172 ]  
 
Proposal to develop propagation data and models in the higher frequency bands (including millimetre-wave) and proposed changes to propagation model for over the roof-top sub-urban environment     Korea (Republic of)     2014-08-26
[ 171 ]  
 
Information document - Modelling of the probability of rain attenuation on Earth -space links     France     2014-08-25
[ 170 ]  
 
Information document - Improvement of the model of sky brightness temperature from ERA Interim profile data     France     2014-08-25
[ 169 ]  
 
Proposed additions to ITU-R Study Group 3 databanks in in Part II Earth space path data     France     2014-08-25
[ 168 ]  
 
Proposed additions to ITU-R Study Group 3 databanks in Part II Earth space path data     France     2014-08-25
[ 167 ]  
 
Further enhancement of the method for prediction of outage intensity due to multipath propagation     Russian Federation     2014-08-25
[ 166 ]  
 
Proposed modifications to Recommendation ITU-R P.452-15 - Hydrometeor-scatter interference prediciton methodology - correction and clarification     LS telcom AG     2014-08-25
[ 165 ]  
 
Proposed modifications to Recommendation ITU-R P.452-15 - Hydrometeor-scatter interference prediction methodology-correction and clarification     LS telcom AG     2014-08-25
[ 164 ]  
 
Editorial revision of Recommendation ITU-R P.679-3, P.1238-7, P.1406-1, P.1411-7, P.1812-3 - Addition of text in related Recommendations due to new Recommendation ITU-R P.2040     Japan     2014-08-25
[ 163 ]  
 
Proposal to evaluate the building entry penetration loss for different building materials at 3.5 GHz     Huawei Technologies Co. Ltd. , China Mobile Communications Corporation , DaTang Telecommunication Technology & Industry Holding Co. Ltd     2014-08-22
[ 162 ]  
 
Discussion document towards a proposed revision to ITU-R Recommendation P.618-11 (Propagation data and prediction method required for the design of Earth-space telecommunication systems)     United Kingdom of Great Britain and Northern Ireland     2014-08-22
[ 161 ]  
 
Proposed revision to Recommendation ITU-R P.2001-1     United Kingdom of Great Britain and Northern Ireland     2014-08-22
[ 160 ]  
 
Information document on ITU-R Recommendation P.530 rain attenuation calculations     United Kingdom of Great Britain and Northern Ireland     2014-08-22
[ 159 ]  
 
Validation examples for the delta Bullington diffraction prediction method     Australia     2014-08-21
[ 158 ]  
 
Testing the new era-interim surface refractivity gradient distribution maps, proposed for Recommendation ITU-R P.453     Australia     2014-08-21
[ 157 ]  
 
Information document on Recommendation ITU-R P.2041     United States of America     2014-08-22
[ 156 ]  
 
Information document concerning the processing of data for the ITU data banks     United States of America     2014-08-22
[ 155 ]  
 
Contribution to the propagation databanks - Rain rate and slant-path attenuation measurements in Guam     United States of America     2014-08-22
[ 154 ]  
 
Introduction of a path length turbulence table for insertion to Study Group 3 ITU-R P.311 databanks     United States of America     2014-08-22
[ 153 ]  
 
Microsoft Excel implementation of the clear-air portion of Recommendation ITU-R P.452-15     United States of America     2014-08-22
[ 152 ]  
 
A modified angular model smoothing parameter - Proposed revision of Recommendation ITU-R P.452-15 Section 4.6     United States of America     2014-08-22
[ 151 ]  
 
Working document toward a preliminary draft revision of Recommendation ITU-R P.619-1 - Propagation data required for the evaluation of interference between stations in space and those on the surface of the Earth     United States of America     2014-08-22
[ 150 ]  
 
Rain rate data for medina township, Ohio (United States)     United States of America     2014-08-22
[ 149 ]  
 
Draft revision of Recommendation ITU-R P.2001-1 Equation (3.8.8D)     United States of America     2014-08-22
[ 148 ]  
 
The correction of the editorial errors about Y(90) in Recommendation ITU-R P.617-3     China (People's Republic of)     2014-08-22
[ 147 ]  
 
The correction of two equations in Recommendation ITU-R P.618-11 - Propagation data and prediction methods required for the design of Earth-space telecommunication systems     China (People's Republic of)     2014-08-22
[ 146 ]  
 
Proposed modification to Recommendation ITU-R P.311-14 - Acquisition, presentation and analysis of data in studies of tropospheric propagation     China (People's Republic of)     2014-08-22
[ 145 ]  
 
Information document concerning propagation related matters regarding the technical feasibility of IMT in the bands above 6 GHz     Canada     2014-08-21
[ 144 ]  
 
Results of the measurements of the field strength     ORANGE POLSKA S.A.     2014-08-19
[ 143 ]  
 
Contribution to the propagation databanks - Seven-year rain rate and slant-path rain attenuation measurements in Madrid. Yearly and monthly distributions     Spain     2014-08-01
[ 142 ]  
 
Comparison of predictions provided by a recent rainfall rate model with experimental distributions     Spain     2014-08-01
[ 141 ]  
 
Contribution to the propagation data banks - Rainfall rate measurements in Spain     Spain     2014-08-01
[ 140 ]  
 
Liaison statement: Clarification of calculations to be used for NLOS links planning     European Telecommunications Standards Institute     2014-07-22
[ 139 ]  
 
Liaison statement to Working Parties 3K and 3M - Technical feasibility of IMT in the bands above 6 GHz     WP 5D     2014-07-02
[ 138 ]  
 
Reply liaison statement to Working Party 5D - Propagation models to be used in sharing studies between the fixed satellite service and small cell deployment of IMT systems in the frequency band 3 400-3 600 MHz     Chairmen, WPs 3K and 3M     2014-06-13
[ 137 ]  
 
Liaison statement to Working Party 4C (copied for information to Working Parties 3M, 4A, 4B, 5C, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10     WP 5A     2014-06-03
[ 136 ]  
 
Liaison statement to Working Parties 3J, 3K and 3M - Propagation models for planning and interference assessment involving fixed service links in bands above 50 GHz     WP 5C     2014-05-28
[ 135 ]  
 
Liaison statement to Working Parties 4C and 5B (copy for information to Working Parties 3M, 4A, 4B, 5A, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10     WP 5C     2014-05-28
[ 134 ]  
 
Liaison statement to Working Party 4C (copy to Working Parties 3M, 4A, 4B, 5A, 5B and 7B for information) - WRC-15 agenda item 1.9.2     WP 5C     2014-05-28
[ 133 ]  
 
Liaison statement to Working Parties 3M, 4A, 4B 5A, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10     WP 4C     2014-03-24
Results:257 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-11-16