International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4/9S : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4/9S  C 

ITU-R WP4/9S

Frequency sharing between the fixed-satellite service and the fixed service

Results:192 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 117 ]  
 
Working document towards draft CPM text - Implications of further restricting the Table 21-4 power flux density mask applicable to non-GSO systems using highly inclined orbits operating in the fixed-satellite service in the frequency band 17.7-19.7 GHz     United States of America     2006-03-06
[ 116 ]  
 
Working document towards a draft CPM text for Agenda item 1.18     Finland, France, United Kingdom     2006-03-07
[ 115 ]  
 
Sharing studies between FS and FSS in the band 17.7-19.7 GHz - WRC-07 Agenda item 1.18     France     2006-03-07
[ 114 ]  
 
Requested course of action when revising existing Recommendations, developing new Recommendations or new Reports     SG 4 & SG 9 Rapporteurs on vocabulary     2006-03-07
[ 113 ]  
 
Proposed revisions to the working document towards a draft CPM text for Agenda item 1.18     Japan     2006-03-07
[ 112 ]  
 
Further considerations on pfd masks applicable to satellite systems for protection of terrestrial services in the band 17.7-19.7 GHz in connection with WRC-07 Agenda item 1.18     Japan     2006-03-07
[ 111 ]  
 
Impact of a proposed pfd mask on the design and operation of HIO FSS systems     Japan     2006-03-07
[ 110 ]  
 
Proposed elements for preliminary draft CPM text on Agenda item 1.8 in Chapter 4     Japan     2006-03-07
[ 109 ]  
 
WRC 07 - CPM Preliminary Report Chapter 4 Agenda item 1.8 - High altitude platform stations 47-48 GHz band     Australia     2006-03-03
[ 108 ]  
 
ABU views on WRC-07 Agenda items 1.8 and 1.18     Asia-Pacific Broadcasting Union (ABU)     2006-02-28
[ 107 ]  
 
Liaison statement to 4A, 4B, 4-9S, 6S, 7B, 7C, 7D - NGN and satellite work; and intersector coordination group on satellite (ICG-SAT) matters     ITU-T Study Group 13   10/13, ITU-T   2006-02-07
[ 106 ]  
 
Liaison statement to Working Parties 4A and 4-9S     SC-WP     2006-01-24
[ 105 ]  
 
Liaison statement to Working Party 4-9S - Analysis of the FS protection criteria contained in limits on the interference to the FS stations recommended by Recommendation ITU-R F.1495     WP 9A     2005-12-08
[ 104 ]  
+Ann.1-10 
Chairman's report - Meeting 14-21 November 2005     Chairman, WP 4-9S     2005-11-21
[ 103 ]  
 
Final List of Participants - Working Party 4-9S     Director, BR     2005-11-18
[ 102 ]  
 
Liaison statement to WPs 4-9S, 6S, 7B and 8D - Draft letter to Director, BR on definition of HEO (AI 7.1 (H))     WP 4A     2005-11-17
[ 101 ]  
 
Liaison statement to Working Parties 4-9S, 6S, 7B, 8D, 9D and the Coordination Committee for Vocabulary - Development of DNR S.[HEO_Sys_Char] - Characterization of HEO-type FSS systems     WP 4A     2005-11-17
[ 100 ]  
 
Liaison statement to Working Party 4-9S - HEO-type FSS system characteristics to be used for analyzing interference to FS systems     WP 4A     2005-11-17
[ 99 ]  
(Rev.1) 
List of documents issued     BR Study Group Department     2005-11-11
[ 98 ]  
 
Defining the power flux-density limits applicable to HIO FSS systems for protection of terrestrial services in the band 17.7-19.7 GHz     Finland     2005-11-09
[ 97 ]  
 
Study on the power flux-density limits applicable to sharing between HIO FSS systems and the terrestrial service in the band 17.7-19.7 GHz     Finland     2005-11-09
[ 96 ]  
 
Analysis of PFD limits applicable to HIO FSS systems in the 17.7-19.7 GHz band     Korea (Republic of)     2005-11-09
[ 95 ]  
 
Working document towards a draft CPM text for Agenda item 1.8 in Chapter 4     Japan     2005-11-08
[ 94 ]  
 
Working document towards a draft CPM Text for Agenda item 1.18     United Kingdom of Great Britain and Northern Ireland     2005-11-08
[ 93 ]  
 
Proposed draft elements for Annex 4 to Working Party 4-9S Chairman's Report - Working document towards a draft CPM text for Agenda item 1.18 (4/1.18/1.3, 4/1.18/3)     Japan     2005-11-08
[ 92 ]  
 
Considerations on the power flux-density limits applicable to HIO FSS systems for protection of terrestrial services in the band 17.7-19.7 GHz     United Kingdom of Great Britain and Northern Ireland     2005-11-08
[ 91 ]  
 
Draft CPM text for Chapter 4/1.18/2 - (Issue (B) invites ITU-R 2) - Measures to be implemented in the fixed service to mitigate interference from HIO FSS space stations in the band 17.7-19.7 GHz     Japan     2005-11-08
[ 90 ]  
 
Considerations on PFD masks including applicability of Table 21-4 in Article 21 of the radio regulations in the frequency Band 17.7-19.7 GHz in connection with WRC-07 Agenda item 1.18     Japan     2005-11-08
[ 89 ]  
 
Study of potential interference into fixed service receivers in the 17.7-19.7 GHz band from highly elliptical inclined orbit satellite systems     Canada     2005-11-08
[ 88 ]  
 
Fixed service mitigation techniques related to Agenda item 1.18     France     2005-11-07
[ 87 ]  
 
WRC-07 Agenda item 1.12 - Footnote 5.538     France     2005-11-07
[ 86 ]  
 
Simulation results of interference from HEO FSS systems to FS systems in the 17.7-19.7 GHz band     Russian Federation     2005-11-03
[ 85 ]  
 
Working document towards a draft CPM text for Agenda item 1.18     United States of America     2005-11-03
[ 84 ]  
 
Working document toward draft CPM text on Resolution 141 (WRC-03) under Agenda item 1.18 for WRC-07 - Operational system parameters of Resolution 141 (WRC-03) highly-inclined orbit non-GSO fixed satellite service systems to be taken into account when computing the potential interference to fixed service receivers     United States of America     2005-11-03
[ 83 ]  
 
Draft liaison statement to WP 4A - Possible methodology for frequency sharing between bi-directional FSS networks comprising ubiquitously deployed earth stations     United States of America     2005-11-03
[ 82 ]  
 
Working document toward draft CPM text for Agenda item 1.8 (Resolution 122 (Rev.WRC-03)) - Chapter 4 - Fixed service including HAPS and fixed-satellite service above 3 GHz     United States of America     2005-11-03
[ 81 ]  
 
Working document toward draft CPM text on Resolution 141 (WRC-03) under Agenda item 1.18 for WRC-07     United States of America     2005-11-03
[ 80 ]  
 
Proposed modifications to Annex 3 to WP 4-9S Chairman's Report - PDRR ITU-R SF.1649 - Guidance for determination of interference from earth stations on vessels (ESVs) to stations in the fixed service when the ESV is within the minimum distance     United States of America     2005-11-03
[ 79 ]  
 
Report on the second meeting of CCV     SG 4 Rapporteur on Vocabulary     2005-11-02
[ 78 ]  
 
The principles of analyzing interference from FSS-HEO systems to FS systems     Russian Federation     2005-10-26
[ 77 ]  
 
Working document towards WRC-07 Agenda item 1.18 - Analysis of the limits on the interference to the FS stations recommended by Recommendation ITU-R F.1495     Russian Federation     2005-10-26
[ 76 ]  
 
Liaison statement to WP 4A and to WP 4-9S for information - Possible methodology for frequency sharing between bidirectional FSS networks comprising ubiquitously deployed earth stations     WP 6S     2005-10-19
[ 75 ]  
 
Liaison statement to Working Party 4-9S - Rain scatter interference     WP 3M     2005-10-10
[ 74 ]  
 
Liaison statement to Study Groups 6 and 7 and Working Parties 4-9S, 4A, 6E, 6S, 8A, 8B, 8D, 8F and 9B - Improving the international spectrum regulatory framework     WP 1B     2005-10-04
[ 73 ]  
 
Liaison statement to Working Party 4-9s and to Working Party of the Special Committee for information     WP 4A     2005-06-21
[ 72 ]  
 
Liaison statement to WP 4-9S and WP 6S - Possible methodology for frequency sharing between bi-directional FSS networks comprising ubiquitously deployed earth stations     WP 4A     2005-06-21
[ 71 ]  
+Ann.1-8 
Report on the meeting of Working Party 4-9S, 2-10 May 2005     Chairman, WP 4-9S     2005-05-10
[ 70 ]  
 
Final list of Participants Geneva, 2-10 May 2005     Director, BR     2005-05-09
[ 69 ]  
 
LS to WP's 1A, 1B, 4A, 4-9S, 6E, 6M, 6S, 7B, 7C, 8A, 8B and 8F and Task Groups 1/8 and 1/9, and to JTG 6-8-9     WP 9D     2005-05-02
[ 68 ]  
 
Liaison statement to Working Party 4-9S - Deployment characteristics of the fixed service in the band 17.7-29.7 GHz to be used for the sharing study with FSS systems using highly inclined orbits     WP 9D     2005-05-02
Results:192 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2006-03-23