Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 19 ]
|
Preliminary draft new Recommendation ITU-R M.[LMS.FA] - General guidelines for the planning of frequency block arrangements in large contiguous bandwidths for broadband applications in the mobile service
|
Canada
|
|
2012-05-07 |
|
[ 18 ]
|
Proposal for a working document towards a preliminary draft new Report ITU-R M.[5MHZ-SO] - Spectral occupancy of fixed and mobile allocations within the band 5 250-5 450 kHz
|
Canada
|
|
2012-05-07 |
|
[ 17 ]
|
Proposed elements of draft CPM text for WRC-15, Agenda item 1.4
|
Canada
|
|
2012-05-07 |
|
[ 16 ]
|
Summary of results of the RA-12 and CPM15-1
|
Chairman, SG 5
|
|
2012-05-08 |
|
[ 15 ]
|
Attribution of the Study Group 5 texts to the Working Parties
|
Chairman, SG 5
|
|
2012-05-08 |
|
[ 14 ]
|
Future updating of the Recommendations and other ITU-R texts under joint responsibility of Study Groups 4 and 5
|
Chairmen, SGs 4 and 5
|
|
2012-05-08 |
|
[ 13 ]
|
Liaison statement - Consent on new Recommendation ITU-T K.91 (K.guide)
|
ITU-T SG 5
|
|
2012-05-02 |
|
[ 12 ]
(Rev.1) |
Proposed revision of Recommendation ITU-R M.1801 and Report ITU-R M.2116
|
Alliance for Telecommunications Industry Solutions
|
|
2012-04-26 |
|
[ 11 ]
|
Progress report on Joint Correspondence Group activity
|
Chairman, JCG 5A/5C
|
|
2012-04-27 |
|
[ 10 ]
|
Response to liaison statement to external organizations - Invitation to review the working document towards the revision of Report ITU-R M.2014-1 - "Digital land mobile system for dispatch traffic"
|
Director, BR
|
|
2012-04-23 |
|
[ 9 ]
|
Response to liaison statement to external organizations on the working document towards a preliminary draft new Report ITU-R M.[LMS.PPDR.UHF CHANNELS] - "Cannelization scenarios for public protection and disaster relief operations in some parts of the UHF band in accordance with Resolution 646 (WRC-03)"
|
Director, BR
|
|
2012-04-23 |
|
[ 8 ]
|
Reply liaison statement to Working Party 5A - Wide-area sensor and/or actuator network (WASN) systems
|
ISO
|
|
2012-04-12 |
|
[ 7 ]
|
WRC Resolutions and Recommendations related to the work of Study Group 5
|
Chairman, SG 5
|
|
2012-04-03 |
|
[ 6 ]
|
Liaison statement to Study Groups 4, 5, 6 and 7, and Working Parties 4A, 4B, 4C, 5A, 5B, 5C 5D, 6A, 7B, 7C and 7D - Preparations for WRC-15 Agenda items 1.1 and 1.2 in response to decisions of CPM15-1
|
Chairman, JTG 4-5-6-7
|
|
2012-03-26 |
|
[ 5 ]
|
Question 45-4/6 to be brought to the attention of Study Group 5
|
SG 6
|
|
2012-03-22 |
|
[ 4 ]
|
Question 289/4 to be brought to the attention of Study Groups 5 and 6
|
SG 4
|
|
2012-03-22 |
|
[ 3 ]
|
Question 136/6 to be brought to the attention of Study Groups 4 and 5
|
SG 6
|
|
2012-03-22 |
|
[ 2 ]
|
Liaison statement to ETSI ERM (ERM Radio Microphones, Cordless Audio and Audio Links) TG17 on Technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHF frequency range
|
ITU-T FG AVA
|
|
2012-02-14 |
|
[ 1 ]
(Rev.1) |
Documents to be carried over from the 2007-2011 study period
|
WP 5A
|
|
2012-01-26 |
Results:744 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
-

|
Multiple Document Download: Formats and Languages to be included (when available):