Contributions
Numéro
Titre
Source
AI/Question
Filtre...
A1.17
A1.8
AI1.1
AI1.10
AI1.11
AI1.12
AI1.13
AI1.14
AI1.15
AI1.16
AI1.17
AI1.18
AI1.19
AI1.2
AI1.3
AI1.4
AI1.5
AI1.6
AI1.7
AI1.8
AI1.9
AI1.9.2
AI110
AI9.1
AI9.1 A)
AI9.1A)
Q260/5
Effacer filtre
Date
[ 122 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 5C, and 7C for information) - WRC-23 agenda item 1.16
WP 7B
AI1.16
2020-09-28
[ 121 ]
Reply liaison statement to Working Party 1A (copy for information to ITU-R Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7C) - Liaison between ITU-R and CISPR on the protection of radio services in the 6-40 GHz frequency range
WP 7D
2020-09-21
[ 120 ]
Reply liaison statement to Working Party 5B - WRC-23 agenda item 1.10 - Characteristics and protection criteria of the radio astronomy service operating in the frequency bands 15.35-15.4 GHz and 22.21-22.5 GHz
WP 7D
AI1.10
2020-09-18
[ 119 ]
Reply liaison statement to Working Party 5B - WRC-23 agenda item 1.8 - Preparation for WRC-23 agenda item 1.8 - Resolution 155 (Rev.WRC-19)
WP 7D
AI1.8
2020-09-18
[ 118 ]
Information on the preparation of texts for the draft CPM Report to WRC-23
Chairman, CPM-23
2020-09-18
[ 117 ]
Initial reply liaison statement to Working Party 5B (copied to Working Parties 4A and 4B for information) - WRC-23 agenda item 1.8
WP 3M
AI1.8
2020-08-31
[ 116 ]
Initial reply liaison statement to Working Party 4C (copied to Working Parties 4A, 4B, 5A, 5B, 5C, 5D and 7B for information) - WRC-23 agenda item 1.18
WP 3M
AI1.18
2020-08-31
[ 115 ]
Initial reply liaison statement to Working Party 5A (copied to Working Parties 4A, 5B, 5C and 5D for information) - WRC-23 agenda item 1.3
WPs 3K and 3M
AI1.3
2020-08-28
[ 114 ]
Initial reply liaison statement to Working Party 5D (copied for information to Working Parties 1B, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D) - WRC-23 agenda items 1.1 and 1.2
WPs 3K and 3M
AI1.2 , AI1.1
2020-08-28
[ 113 ]
Initial reply liaison statement to Working Party 5D (copied to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D for information) - WRC-23 agenda item 1.4
WPs 3J, 3K and 3M
AI1.4
2020-08-27
[ 112 ]
Reply liaison statement to Working Party 5B (copied to Working Parties 3M, 4C and 7B for information) - WRC-23 agenda item 1.7 - Propagation considerations of a new aeronautical mobile-satellite (R) service allocation in the frequency band 117.975-137 MHz
WP 3L
AI1.7
2020-08-27
[ 111 ]
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A - Recommendation ITU-R P.368-9 - Software implementations of ground-wave propagation predictions - GRWAVE and LFMF-SmoothEarth
WP 3L
2020-08-27
[ 110 ]
Reply liaison statement to Working Party 5B (copied to Working Parties 5A, 5C, 6A and ICAO for information) - WRC-23 agenda item 1.9 - Review of Appendix 27 of the Radio Regulations to accommodate digital aeronautical HF technologies
WP 3L
AI1.9
2020-08-27
[ 109 ]
Reply liaison statement to the International Civil Aviation Organization (copy to Working Party 5B for information)
WP 3K
2020-08-26
[ 108 ]
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 5A, 5C, 7C and 7D for information) - WRC-23 agenda item 1.10
WPs 3K and 3M
AI1.10
2020-08-25
[ 107 ]
Liaison statement to Task Group 6/1 (copied to Working Parties 5A, 5B, 5C, 5D and 6A for information) - WRC-23 agenda item 1.5 - Organisation of work of Working Parties 3K and 3M to support Task Group 6/1
WPs 3K and 3M
AI1.5
2020-08-25
[ 106 ]
Liaison response to ITU-T Study Group 11 (copy to ITU-D SG2 Q5/2, Intersector Coordination Group, ITU-R Working Parties 1B, 5B and 5D, and the RAG) - Disaster Relief Use Cases
WP 5A
2020-08-10
[ 105 ]
Reply liaison statement to Working Party 7C (copied for information to Working Parties 3J, 3M, 4A, 4C, 5A, 5B) - WRC-23 agenda item 1.14 - System technical and operational characteristic in the frequency band 231.5-252 GHz
WP 5C
AI1.14
2020-08-07
[ 104 ]
Reply liaison statement to Working Party 5D (copied for information to Working Parties 4A, 4C, 5A, 5B, 6A, 7B, 7C and 7D) - WRC-23 agenda item 1.4
WP 5C
AI1.4
2020-08-07
[ 103 ]
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.2
WP 5C
AI1.2
2020-08-07
[ 102 ]
Reply liaison statement to Working Party 7C (copied for information to Working Parties 4A, 4C, 5B and 5C) - Technical and operational characteristics in the frequency band 231.5-252 GHz
WP 5A
AI1.14
2020-08-07
[ 101 ]
Liaison statement to Working Parties 4A, 5B, 5C and 5D - WRC-23 agenda item 1.3
WP 5A
AI1.3
2020-09-08
[ 100 ]
Reply liaison statement to Working Party 4C (copied for information to Working Parties 4A, 4B, 5A, 5B, 5D, 7B, 7C and 3M) - WRC-23 agenda item 1.18
WP 5C
AI1.18
2020-08-06
[ 99 ]
Reply liaison statement to Working Party 4A (copy for information to Working Parties 3M, 5A and 5B) - WRC-23 agenda item 1.15
WP 5C
AI1.15
2020-09-08
[ 98 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 7B and 7C) - WRC-23 agenda item 1.17
WP 5C
AI1.17
2020-08-06
[ 97 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.16
WP 5C
AI1.16
2020-08-06
[ 96 ]
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5B, and 7B for information) - WRC-23 agenda item 1.19
WP 5C
AI1.19
2020-08-06
[ 95 ]
Reply liaison statement to Working Party 4A (copy for information to Working Parties 5B and 3M)
WP 5A
AI1.15
2020-08-06
[ 94 ]
Liaison statement to Working Party 7B (copied to Working Parties 3M, 5B, 5C, 7C and 7D for information) - Preparations for studies under WRC-23 agenda item 1.13
WP 5A
AI1.13
2020-08-05
[ 93 ]
+Ann.1-17
Report on the twenty-fourth meeting of Working Party 5B (e-Meeting, 20-30 July 2020)
Chairman, WP 5B
2020-07-30
[ 92 ]
Final List of Participants - Working Party 5B (E-meeting, 20-30 July 2020)
Director, BR
2020-07-30
[ 91 ]
Results of the Questionnaire on the use of frequency bands 457.5125-457.5875 MHz and 467.5125-467.5875 MHz by on-board communication stations in the maritime mobile service
Director, BR
2020-07-20
[ 90 ]
(Rev.1)
List of documents issued (Documents 5B/1 - 5B/91)
BR Study Groups Department
2020-07-17
[ 89 ]
Liaison statement to Working Parties 5A, 5B, 5C and 6A - Preparations for studies under WRC-23 agenda item 1.12
WP 7C
AI1.12
2020-07-17
[ 88 ]
Organisation of the work of Working Party 5B
Chairman, WP 5B
2020-07-14
[ 87 ]
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
Chairman, CCV
2020-07-14
[ 86 ]
Working document towards a draft revision of Recommendation ITU-R M.1371-5
Denmark
,
Netherlands (Kingdom of the)
2020-07-13
[ 85 ]
Reply liaison statement on work being carried out in ITU-T SG5 on human exposure to EMF from ICTS (reply to ITU-D Q7/2 -SG2RGQ/200)
ITU-T SG 5
2020-07-13
[ 84 ]
System characteristics of incumbent services and proposed work plan for WRC-23 agenda item 1.10
China (People's Republic of)
AI1.10
2020-07-13
[ 83 ]
Proposal on the liaison statement to Working Party 4C - Introduction of additional satellite systems into the Global Maritime Distress Safety System (GMDSS)
China (People's Republic of)
AI1.11
2020-07-13
[ 82 ]
Proposed revision to working document towards a preliminary draft new Report ITU-R M.[FOD_EESS_SHARED] - Sharing and compatibility studies between earth exploration satellite service sensors and foreign object debris detection system in the frequency range
92-100 GHz
Japan
2020-07-13
[ 81 ]
Proposed revision to working document towards a preliminary draft new Recommendation ITU-R M.[RAD 92-100 GHZ] - Technical and operational characteristics of radiolocation systems operating in the frequency range 92-100 GHz and radionavigation systems operating in the frequency range 95-100 GHz
Japan
2020-07-13
[ 80 ]
Preliminary draft revision of Recommendation ITU-R M.2092-0 - Technical characteristics for a VHF data exchange system in the VHF maritime mobile band
China (People's Republic of)
AI1.9.2
2020-07-13
[ 79 ]
Proposed revision to working document towards a preliminary draft new Report ITU-R M.[FOD 92-100 GHZ] - Technical and operational characteristics of the foreign object debris
detection system operating in the frequency band 92-100 GHz
Japan
2020-07-13
[ 78 ]
Update on studies related to WRC-23 agenda item 1.7 on space based VHF communications
Singapore (Republic of)
AI1.7
2020-07-13
[ 77 ]
Working document towards a preliminary draft new Recommendation ITU-R M.[TER_AG_CNPC_CHAR] - Characteristics and Protection Criteria of Terrestrial Air-Ground, Unmanned Aircraft System Control and Non-Payload Communications Links operating in the AM(R)S allocation under RR No. 5.443C
United States of America
2020-07-10
[ 76 ]
Working document towards a preliminary draft new Recommendation ITU-R M.[15.4-15,7 GHZ_ARNS] - Characteristics of and protection criteria for radars operating in the aeronautical radionavigation service in the frequency band 15.4-15.7 GHz
United States of America
2020-07-10
[ 75 ]
Working document towards a preliminary draft new Report ITU-R M.[UA_GROUND_DAA] - Guidance on suitable frequency bands and services to be used by unmanned aircraft ground based detect-and-avoid non-cooperative systems
United States of America
2020-07-10
[ 74 ]
Working document towards a preliminary draft new Report ITU-R M.[UA-AIRBORNE-DAA] - Guidance on suitable frequency bands and services to be used by airborne unmanned aircraft detect-and-avoid non-cooperative systems
United States of America
2020-07-10
[ 73 ]
Proposed updates to WD-PDN Report ITU-R M.[RADAR SIMULATIONS] - Simulations of performance for specific primary surveillance radars
United States of America
2020-07-13
Resultats:822 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17
- Suivant
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):