Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP5B : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP5B  C 

UIT-R WP5B

Servicio móvil marítimo, incluido el sistema mundial de socorro y seguridad marítimos (SMSSM); servicio móvil aeronáutico, y servicio de radiodeterminación

Resultados :731 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 31 ]  
 
Liaison Note to ITU-R Study Group 5 and Working Party 5B - Regarding the Recommendation ITU-R M.2092-0     International Association of Marine Aids to Navigation and Lighthouse Authorities     2016-04-28
[ 30 ]  
 
Compatibility studies between a new VHF data exchange system (VDES) satellite component and radars operating in the frequency band 1 54-1 56 MHz     Russian Federation     2016-04-27
[ 29 ]  
 
The approximate composition of the radio electronic complex of the sub-orbital vehicles     Russian Federation     2016-04-27
[ 28 ]  
 
Proposals on the studies under WRC-19 agenda item 1.9.1     Germany (Federal Republic of)   AI1.9.1   2016-04-27
[ 27 ]  
 
Liaison statement - Introduction of additional mobile-satellite service systems into the GMDSS     WP 4C     2016-04-25
[ 26 ]  
 
Focus Group on Aviation Applications of Cloud Computing for Flight Data Monitoring     WP 4C     2016-04-20
[ 25 ]  
 
Liaison statement to Working Party 1A (Copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 7D   210-3/1   2016-04-13
[ 24 ]  
 
Liaison statement to Working Parties 3J, 3K and 3M concerning propagation models for aeronautical mobile (copy to Working Party 5B For information)     WP 7B     2016-04-12
[ 23 ]  
 
Liaison statement to Working Party 5A (Working Parties 4A, 4C, 5B, and 5C copied for information) - Information pertaining to EESS (active) in the 5 GHz range to be considered under WRC-19 agenda item 1.16     WP 7C   AI1.16   2016-04-11
[ 22 ]  
 
Liaison statement to Working Party 5B - Revision of ITU-R Recommendation RS.1260     WP 7C     2016-04-11
[ 21 ]  
 
Liaison statement to Working Party 4A (Copy to Working Parties 4B, 5A, 5B, 5C, 5D, 6A, 7D and 3M) - WRC-19 agenda items 1.5 and 1.6     WP 7C   AI1.6, AI1.5   2016-04-11
[ 20 ]  
 
Liaison statement to Working Parties 5A, 5B and 6A - Technical and operational characteristics for systems operating within the 40-50 MHz frequency band     WP 7C     2016-04-11
[ 19 ]  
 
Liaison statement to Working Parties 3K and 3M (for action) and Study Group 5 and Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7C (for information)     WP 7D     2016-04-11
[ 18 ]  
 
Liaison statement to Working Parties 4C and 5B (copy to the Joint IMO/ITU Experts Group) - Compatibility of the radio astronomy service with satellite-provided global maritime distress and safety systems (WRC-19 AI 1.8)     WP 7D   AI1.8   2016-04-08
[ 17 ]  
 
Liaison statement requesting technical characteristics for WRC-19 agenda item 1.3 from Working Parties 4C, 5A, 5B, 5C, 5D and 6A (copy to Working Party 3M for information)     WP 7B     2016-04-07
[ 16 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C and 6A concerning WRC-19 agenda item 1.7 (copy for information to Working Party 1A, Working Party 3M and Working Party 4B) - WRC-19 agenda item 1.7     WP 7B     2016-04-07
[ 15 ]  
 
Liaison statement to Working Party 5B - Terminology and associated definitions produced by on-going work in Working Party 5B     CCV and SCV     2016-04-01
[ 14 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties     Chairman, CCV     2016-04-01
[ 13 ]  
 
Liaison statement to ITU-R Working Party 5B - Automatic identification system (AIS) - Uncontrolled novel applications     International Maritime Organization     2016-03-29
[ 12 ]  
 
Report of the eleventh meeting of the joint IMO/ITU Experts Group on Maritime Radiocommunication matters     International Maritime Organization     2016-03-29
[ 11 ]  
 
Application of recognition of iridium mobile satellite system as a GMDSS service provider     International Maritime Organization     2016-03-29
[ 10 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]     WP 5D     2016-03-09
[ 9 ]  
 
Reply liaison statement to ITU-T Study Group 5, ITU-D Study Group 2, ITU-R Working Party 6A (copy for information to Working Parties 3L, 1B, 1C, 5A, 5B, 5C) on information about work that is being carried out within work under study in ITU-T Q7/5 (Human exposure to electromagnetic fields (EMFS) due to radio systems and mobile equipment)     WP 5D     2016-03-08
[ 8 ]  
 
Follow-up actions on the incorporation of voluntary information into the ITU maritime services database of maritime identities assigned to VHF handheld radios with Digital Selective Calling (DSC) and Global Navigation Satellite System (GNSS)     Director, BR     2016-02-25
[ 7 ]  
 
Liaison statement on deliverables of ITU-T Focus Group AC (Focus Group on Aviation applications of cloud computing for flight data monitoring)     Telecommunication Standardization Advisory Group     2016-02-12
[ 6 ]  
 
Liaison statement to ITU-R Study Groups 4 and 5 and ITU-T Study Groups 9 and 16 on Global Platform for the Broadcasting Service - Global Platform for the Broadcasting Service     WP 6B   140/6   2016-02-04
[ 5 ]  
 
Liaison statement to Working Party 5A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda item 1.1     WP 6A   AI1.1   2016-02-03
[ 4 ]  
 
Liaison statement evaluating the leakage and impact of radio frequency noise from telecommunication systems using metallic conductors     ITU-T SG 9     2016-02-03
[ 3 ]  
 
Liaison statement evaluating the leakage and impact of radio frequency noise from telecommunication systems using metallic conductors     ITU-T SG 5     2015-12-08
[ 2 ]  
 
Liaison statement on information about work that is being carried out within work under study in ITU-T Question 7/5     ITU-T SG 5     2015-12-08
[ 1 ]  
 
Documents to be carried over from the 2012-2015 study period     WP 5B     2015-12-08
Resultados :731 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15  
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2019-10-18