Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 145 ]
|
Proposal on study of energy efficiency metrics of mobile station cell site and best practice for energy saving
|
Huawei Technologies Co. Ltd.
|
Q17/5
|
2013-11-18 |
|
[ 144 ]
(Rev.1) |
K.lit: Surge parameters of isolating transformers used in Information and Communications Technology devices and equipment
|
Bourns Limited
,
Institute of Electrical and Electronics Engineers, Inc.
|
Q4/5, Q2/5
|
2013-11-18 |
|
[ 143 ]
(Rev.1) |
Questionnaire on EMC requirement for ac mains port below 150kHz
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/5
|
2013-11-18 |
|
[ 142 ]
(Rev.1) |
The importance of keeping a strict requirement approach in the joint ETSI/ITU-T LCA standard"
|
Alcatel-Lucent France
,
Huawei Technologies Co. Ltd.
,
Nokia Solutions and Networks Gmbh & Co. KG
,
Telefon AB - LM Ericsson
|
Q18/5
|
2013-11-18 |
|
[ 141 ]
(Rev.1-2) |
Example of disturbance to radio services caused by broadband transmission and proposal for the study of K.mhn
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q8/5
|
2013-11-18 |
|
[ 140 ]
(Rev.1-2) |
Proposal for revision of K.27 regarding earthing and bonding for 400VDC systems
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/5
|
2013-11-18 |
|
[ 139 ]
(Rev.1) |
Questionnaire on induction problems of optical cables
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q3/5
|
2013-11-18 |
|
[ 138 ]
|
Proposal for radiation immunity test method in which usage of wireless devices near telecommunication equipment is assumed
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/5, Q11/5
|
2013-11-18 |
|
[ 137 ]
(Rev.1) |
Proposal for revision of K.21
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q4/5
|
2013-11-18 |
|
[ 136 ]
(Rev.1-2) |
Proposal for draft recommendation of K.appl4
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q2/5
|
2013-11-18 |
|
[ 135 ]
(Rev.1-3) |
Proposal for K.ntt
|
China Unicom
|
Q5/5
|
2013-11-18 |
|
[ 134 ]
(Rev.1-2) |
Failure analysis of home network equipment caused by lightning issues
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q4/5, Q2/5
|
2013-11-18 |
|
[ 133 ]
(Rev.`1) |
Proposal on L.m&m_infra
|
Ministry of Industry and Information Technology (MIIT)
|
Q17/5
|
2013-11-18 |
|
[ 132 ]
(Rev.1) |
Proposal on L.DC_assessment
|
Ministry of Industry and Information Technology (MIIT)
|
QALL/5, Q17/5
|
2013-11-18 |
|
[ 131 ]
(Rev.1-3) |
Lightning Protection of the Dedicated Transformer for Radio Base Station
|
China Unicom
|
Q5/5
|
2013-11-18 |
|
[ 130 ]
|
Theoretical Analysis and Test of EMF in TDFI Bus
|
China Mobile Communications Corporation
|
Q7/5
|
2013-11-18 |
|
[ 129 ]
|
Study and proposal for the drafting of K.XXX(Lightning Protection of the Dedicated Transformer for Radio Base Station)
|
China Telecommunications Corporation
|
Q5/5
|
2013-11-18 |
|
[ 128 ]
(Rev.1-2) |
China Telecom's proposal for the second draft of new Recommendation K.dbs
original withdrawn at special request of the submitter
|
China Telecommunications Corporation
|
Q5/5
|
2013-11-18 |
|
[ 127 ]
(Rev.1) |
Proposal for the drafting of a new recommendation K.SENS
|
China Telecommunications Corporation
|
Q9/5
|
2013-11-18 |
|
[ 126 ]
(Rev.1) |
Proposal for the drafting of a new recommendation K.GENV
|
China Telecommunications Corporation
|
Q7/5
|
2013-11-18 |
|
[ 125 ]
|
Consideration points to develop common understandings on defining the functional unit, reference flow and unit process in ITU-T L.1410
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q18/5
|
2013-11-18 |
|
[ 124 ]
|
Proposal of reference value for routers and switch
|
Huawei Technologies Co. Ltd.
|
Q17/5
|
2013-11-16 |
|
[ 123 ]
|
Requirements on a standardised mobile device eco-rating
|
Huawei Technologies Co. Ltd.
|
Q16/5
|
2013-11-16 |
|
[ 122 ]
|
View on Specifications and Criteria for Mobile Phone Eco-Rating
|
Huawei Technologies Co. Ltd.
|
Q16/5
|
2013-11-16 |
|
[ 121 ]
|
Criteria advancement for Basic LCA Specification in Mobile Phone Eco-Rating
|
Huawei Technologies Co. Ltd.
|
Q16/5
|
2013-11-16 |
|
[ 120 ]
|
Huawei's view on the current state of mobile eco rating
|
Huawei Technologies Co. Ltd.
|
Q16/5
|
2013-11-16 |
|
[ 119 ]
(Rev.1) |
The role of the ITU/ETSI LCA standard for ICT in global environmental policy
|
Huawei Technologies Co. Ltd.
|
Q18/5
|
2013-11-15 |
|
[ 118 ]
(Rev.1) |
The strengths and limitations of LCA to quantify the GHG change induced by a shift from single servers to virtual machines
|
Huawei Technologies Co. Ltd.
|
Q18/5
|
2013-11-15 |
|
[ 117 ]
|
Suggestion text for 9 Data quality requirements in L.1410 update
|
Huawei Technologies Co. Ltd.
|
Q18/5
|
2013-11-15 |
|
[ 116 ]
|
Suggestion for text for 6.2.5 Data quality requirements in L.1410 update
|
Huawei Technologies Co. Ltd.
|
Q18/5
|
2013-11-15 |
|
[ 115 ]
|
Suggestion for text for Section 6.2.4 Cut-off in L.1410 update
|
Huawei Technologies Co. Ltd.
|
Q18/5
|
2013-11-15 |
|
[ 114 ]
|
Suggestion for 6.2.3. System boundaries in L.1410 update
|
Huawei Technologies Co. Ltd.
|
Q18/5
|
2013-11-15 |
|
[ 113 ]
|
Suggestion for. General introduction in L.1410 update
|
Huawei Technologies Co. Ltd.
|
Q18/5
|
2013-11-15 |
|
[ 112 ]
|
Overall uncertainty in LCA results: Procedure and formula for simplified calculation of the relative error
|
Huawei Technologies Co. Ltd.
|
Q18/5
|
2013-11-15 |
|
[ 111 ]
|
Allocation of material usage and recycling in LCA
|
Huawei Technologies Co. Ltd.
|
Q18/5
|
2013-11-15 |
|
[ 110 ]
|
Estimation of ICT Sector and Entertainment&Media Sector global electricity footprints from 2012-2017
|
Huawei Technologies Co. Ltd.
|
Q18/5
|
2013-11-15 |
|
[ 109 ]
|
The role of cloud computing, telepresence and telecommuting for reducing energy usage
|
Huawei Technologies Co. Ltd.
|
Q18/5
|
2013-11-14 |
|
[ 108 ]
|
Eco-rating recommendations on LCA approach (manufacture, transport, use and end-of-life phases)
|
Orange
|
Q16/5
|
2013-11-14 |
|
[ 107 ]
|
Proposal for a modified scope of the L.Eco-Rating Recommendation
|
Alcatel-Lucent France
|
Q16/5
|
2013-11-14 |
|
[ 106 ]
|
Energy Assessment Methodologies for Telecommunications Services
|
Alcatel-Lucent France
|
Q18/5
|
2013-11-14 |
|
[ 105 ]
(Rev.1) |
Q7/5 -EMF Guide - Draft Scope & Contents List
|
Telstra Corporation Ltd.
|
Q7/5
|
2013-11-10 |
|
[ 104 ]
|
ITU/UNESCO Events in Uruguay (11-14 March 2014)
|
Uruguay
|
QALL/5
|
2013-11-08 |
|
[ 103 ]
(Rev.1) |
K21 Edits
|
Littelfuse UK Ltd.
|
Q4/5
|
2013-11-05 |
|
[ 102 ]
(Rev.1) |
Step Testing Topic (under voltage testing)
|
Littelfuse UK Ltd.
|
Q4/5
|
2013-11-05 |
|
[ 101 ]
(Rev.1) |
Coordination Topic
|
Littelfuse UK Ltd.
|
Q4/5
|
2013-11-04 |
|
[ 100 ]
(Rev.1) |
Ringing Waveforms
|
Littelfuse UK Ltd.
|
Q4/5
|
2013-11-04 |
|
[ 99 ]
(Rev.1) |
Inputs for Handbook on Setting up Low-Cost Sustainable Telecommunication Infrastructure for Rural Communications in Developing Countries
|
India
|
Q14/5
|
2013-11-01 |
|
[ 98 ]
(Rev.1) |
Electro Magnetic Field from Mobile Communications Tower - Monitoring mechanism
|
India
|
Q7/5
|
2013-11-01 |
|
[ 97 ]
(Rev.1) |
Issues in implementation of new Electro Magnetic Field Emission norms with 1/10th of ICNIRP norms
|
India
,
Ministry of Communications and Information Technology
|
Q7/5
|
2013-11-01 |
|
[ 96 ]
(Rev.1) |
Mobile Coverage Provisioning for Uncovered Rural Areas of India :
GREEN TELECOM USO Initiatives
|
India
,
Ministry of Communications and Information Technology
|
Q14/5
|
2013-10-31 |
Results:845 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):