International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:983 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 283 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D - WRC-23 agenda item 1.4     WP 5D   AI1.4   2021-06-18
[ 282 ]  
+Ann.1-4 
Report of activities of the Correspondence Group on WRC-23 agenda item 7 to Working Party 4A     Chairman, CG on WRC-23 a.i. 7   AI7   2021-06-17
[ 281 ]  
 
Statistics on Resolution 40 (Rev.WRC-19)     Director, BR     2021-06-15
[ 280 ]  
 
Report of activities of the Correspondence Group on WRC-23 agenda item 1.19 to Working Party 4A     Chairman, CG on WRC-23 a.i. 1.19   AI1.19   2021-06-11
[ 279 ]  
 
Liaison statement to Working Party 3M, 4A, 4C, 7B and 7D - WRC-23 agenda item 1.6     WP 5B   AI1.6   2021-06-09
[ 278 ]  
 
Liaison statement to Working Parties 3K and 3M (coy for information to Working Parties 4A, 5A, 5C, 7C and 7D) - WRC-23 agenda item 1.10 - Possible new allocations to the Aeronautical Mobile Service (AMS) for the use of non-safety applications     WP 5B   AI1.10   2021-06-09
[ 277 ]  
 
Report of activities of the Correspondence Group on WRC-23 agenda item 1.16 to the Working Party 4A meeting of 14-28 July 2021     Chairman, CG #2 on WRC-23 a.i. 1.16   AI1.16   2021-06-09
[ 276 ]  
 
Liaison statement on work related to environment energy efficiency and the circular economy and new areas of study     ITU-T SG 5     2021-06-02
[ 275 ]  
 
Proposed amendments to draft new Resolution [AI1.16] (WRC-23)     Luxembourg   AI1.16   2021-05-26
[ 274 ]  
 
Liaison statement on work being carried out under study in ITU-T Q3/5     ITU-T SG 5     2021-05-24
[ 273 ]  
 
Liaison statement to ITU-R Study Groups 4 and 6 - Broadcasting term "Quasi Error Free" (QEF) in the ITU Terminology Database     CCT     2021-05-19
[ 272 ]  
 
Statistics of the orbital occupancy of the GSO ARCS in the frequency bands subject to RR Appendix 30B     Director, BR   AI7E   2021-05-17
[ 271 ]  
 
Liaison statement to relevant parties - Proposed suppression of the Compendium of ITU's work on Emergency Telecommunications     WP 5A     2021-05-17
[ 270 ]  
 
Reply liaison statement to Working Party 4A - Mobile Service technical and operational characteristics and protection criteria for use in sharing studies under WRC-23 agenda items 1.16 and 1.17     WP 5A   AI1.17, AI1.16   2021-05-14
[ 269 ]  
 
Reply liaison statement to Working Party 4A - Additional information for studies on WRC-23 agenda item 1.19     WP 5A   AI1.19   2021-05-14
[ 268 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.2     WP 5C   AI1.2   2021-05-13
[ 267 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5B and 7B for information) - WRC-23 agenda item 1.19 - Characteristics and protection criteria for fixed service systems operating in the frequency band 17.7-19.7 GHz     WP 5C   AI1.19   2021-05-13
[ 266 ]  
 
Liaison statement to Working Parties 4A, 5B, 5C and 5D (copy for information to ITU-T FG-VM) - Intelligent Transport Systems     WP 5A     2021-05-14
[ 265 ]  
 
Reply liaison statement to Working Party 4A (copy for information to Working Parties 3M, 5A and 5B) - WRC-23 agenda item 1.15 - Additional characteristics for fixed service systems operating in the frequency band 12.75-13.25 GHz     WP 5C   AI1.15   2021-05-13
[ 264 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B and 7B for information) - WRC-23 agenda items 1.16 and 1.17 - Characteristics and protection criteria for fixed service systems operating in the frequency bands 17.7- 19.7 GHz and 27.5-29.5 GHz     WP 5C   AI1.17, AI1.16   2021-05-13
[ 263 ]  
 
Liaison statement to Working Parties 3J, 3K and 3M (copy for information to Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C and 7D) - Propagation information related to studies under Resolution 731 (Rev.WRC-19) and other issues above 71 GHz     WP 7C     2021-05-07
[ 262 ]  
 
Reply liaison statement to Working Party 5B (copied for information to Working Parties 4A, 5A, 5C, 7C and 7D) - WRC-23 agenda item 1.10 - Possible new allocations to the aeronautical mobile service for the use of non-safety applications     WPs 3K and 3M   AI1.10   2021-05-03
[ 261 ]  
 
Reply liaison statement to Working Party 4A - WRC-23 agenda item 1.19     WP 7C   AI1.19   2021-04-27
[ 260 ]  
 
Reply liaison statement to Working Party 4A - WRC-23 agenda item 1.15     WP 7C   AI1.15   2021-04-27
[ 259 ]  
 
Liaison statement to CISPR (Subcommittees B and H) (copy for information to Study Group 1 and Working Parties 1A, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Update to Standard frequency and time signal services protection requirements in the CISPR radio services database     WP 7A     2021-04-26
[ 258 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, and 5D for information) - WRC-23 agenda item 9.1, topic d)     WP 7C   AI9.1D)   2021-04-26
[ 257 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C and 7B for information) - WRC-23 agenda item 1.2 - Additional information on EESS (passive) in 10.6-10.7 GHz     WP 7C   AI1.2   2021-04-23
[ 256 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 7D (copy to Working Parties 3J and 3M for information) - WRC-23 agenda item 1.14: system characteristics of primary services to be used for sharing and compatibility studies in the frequency range 231.5-252 GHz     WP 7C   AI1.14   2021-04-23
[ 255 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4C, 5A, 5B, 5C and 7B for information) - WRC-23 agenda item 1.16     WP 7C   AI1.16   2021-04-23
[ 254 ]  
 
Liaison statement to Working Party 4A (copy for information to Working Parties 3M, 4B, 4C, 5A, 5B, 5C and 7B) - WRC-23 agenda item 1.17     WP 7C   AI1.17   2021-04-23
[ 253 ]  
 
Reply liaison statement to Working Party 4A - Working document towards a revision of Report ITU-R SA.2307 - Protection of SRS and FSS systems sharing the 37.5-38 GHz band     WP 7B     2021-04-15
[ 252 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 7C and 7D for information) - Reply liaison statement to Working Party 5D concerning WRC-23 agenda item 1.2     WP 7B   AI1.2   2021-04-15
[ 251 ]  
 
Liaison statement from ITU-D Study Group 2 Question 5/2 to ITU-T Study Groups, ITU-R Study Groups, UN and External Organization on the output Report on Q5/2 - ITU-D Study Group 2 Question 5/2: Utilizing telecommunications/ICTs for disaster risk reduction and management     ITU-D SG 2     2021-04-14
[ 250 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, and 7C for information) - Reply liaison statement to Working Party 4A concerning WRC-23 agenda item 1.17     WP 7B   AI1.17   2021-04-09
[ 249 ]  
 
Preliminary position on WRC-23 agenda     World Meteorological Organization     2021-03-17
[ 248 ]  
 
Reply liaison statement to ITU-R Working Party 5B (copy for information to Working Party 4A) - Clarification on the draft ICAO position on WRC-23 agenda items 1.15, 1.16 and 1.17     International Civil Aviation Organization   AI1.17, AI1.16, AI1.15   2021-03-15
[ 247 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D - WRC-23 agenda item 1.4     WP 5D   AI1.4   2021-03-15
[ 246 ]  
+Ann.1-43 
Report on the meeting of Working Party 4A (22 February - 3 March 2021) (Virtual Meeting)     Chairman, WP 4A     2021-03-03
[ 245 ]  
 
Final List of Participants - Working Party 4A (E-meeting, 22 February - 3 March 2021)     Director, BR     2021-03-03
[ 244 ]  
 
List of documents issued (Documents 4A/155 - 4A/244)     BR, Study Groups Department     2021-02-22
[ 243 ]  
 
Liaison statements to Working Party 4A informing on latest status/developments on various topics     Chairman, WP 4A     2021-02-22
[ 242 ]  
 
Liaison statements to Working Party 4A regarding WRC-23 agenda items for which Working Party 4A is a contributing group     Chairman, WP 4A     2021-02-22
[ 241 ]  
 
Liaison statement to Working Party 5B (copy to Working Party 4A) - UAS CNPC links in the 5 030 to 5 091 MHz band     WP 4C     2021-02-19
[ 240 ]  
 
Reply liaison statement to ITU-R Working Party 4A - Preparations for WRC-23 agenda items 1.16 and 1.17     WP 4C   AI1.17, AI1.16   2021-02-19
[ 239 ]  
 
Working document on developing an ITU-R Small Satellite Handbook     Director, BR     2021-02-18
[ 238 ]  
 
Working document towards a preliminary draft revision to Recommendation ITU-R S.1503-3 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations     United Kingdom of Great Britain and Northern Ireland     2021-02-15
[ 237 ]  
 
Identification of potentially affected earth stations under RR No. 9.7B     Director, BR     2021-02-16
[ 236 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[AGGREGATE NGSO-GSO INTERFERENCE] - Methodology for the evaluation of aggregate interference caused by all non-GSO FSS systems into GSO FSS, MSS and BSS networks in the 50/40 GHz bands     SES     2021-02-15
[ 235 ]  
 
Proposal for a new working document toward a preliminary draft new Recommendation ITU-R S.[AGG_EPFD + TERMS OF REFERENCE], methodology for examining aggregate EPFD from multiple non-GSO satellite systems in the KU, KA and Q/V bands and terms of reference     SES     2021-02-15
[ 234 ]  
 
Sharing studies for satellite to satellite transmissions in the frequency bands 11.7-12.7 GHz, 18.1-18.6 GHz, 18.8-20.2 GHz and 27.5-30 GHz     SES   AI1.17   2021-02-15
Results:983 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2023-10-19