Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 480 ]
|
Contribute to ITU-R Working Party 5D supplement to update the guidelines on the smooth transition of existing mobile networks to IMT-2000 for developing counties (GST)
|
China (People's Republic of)
|
|
2009-06-03 |
|
[ 479 ]
|
Frequency arrangements for 2 300-2 400 MHz
|
New Zealand
|
|
2009-06-03 |
|
[ 478 ]
|
Software implementation of IMT.EVAL channel model
|
Finland
|
|
2009-06-03 |
|
[ 477 ]
|
Implementation guidelines for using IMT-Advanced channel model of Report ITU-R M.2135
|
China (People's Republic of)
,
Japan
,
Korea (Republic of)
|
|
2009-06-03 |
|
[ 476 ]
|
C-Code for Report ITU-R M.2135 - Channel model implementation
|
Korea (Republic of)
|
|
2009-06-03 |
|
[ 475 ]
|
Proposed modification on the outline of ITU-R Working Party 5D supplement to update the Question 18-1/2 GST and update of relevant ITU-R Handbook
|
Korea (Republic of)
|
|
2009-06-03 |
|
[ 474 ]
|
Information on the APT Wireless Forum development of UHF digital dividend band plan
|
Korea (Republic of)
|
229-2/5
|
2009-06-03 |
|
[ 473 ]
|
For the reply liaison statement to Working Party 4A on preliminary draft new Recommendation ITU-R S.[IMT-PFD]
|
Korea (Republic of)
|
|
2009-06-03 |
|
[ 472 ]
|
Views on revision of Recommendation ITU-R M.1457-9
|
United Arab Emirates
|
|
2009-06-03 |
|
[ 471 ]
|
Cognitive radio for IMT technical characteristics and functionalities of cognitive radio systems
|
France
|
|
2009-06-03 |
|
[ 470 ]
|
Providing a liaison reply to Working Parties 5A and 1B in response to Documents 5D/419 and 5D/457
|
Chairman, WP 5D
|
|
2009-06-02 |
|
[ 469 ]
|
Guidelines for using IMT-Advanced channel models
|
Finland
|
229-2/5
|
2009-06-02 |
|
[ 468 ]
|
Proposal of actions for IMT-Advanced development at the 5th Working Party 5D Meeting
|
China (People's Republic of)
,
Japan
,
Korea (Republic of)
|
229-2/5
|
2009-06-02 |
|
[ 467 ]
|
Considerations on frequency arrangements for IMT in the band 3 400-3 600 MHz
|
Japan
|
229-2/5
|
2009-06-02 |
|
[ 466 ]
|
Activities towards submission of candidate radio interface technologies for IMT-Advanced in Japan
|
Japan
|
229-2/5
|
2009-06-02 |
|
[ 465 ]
(Rev.1) |
Working Party 5D request for information on Femtocells
|
Director, BR
|
|
2009-06-02 |
|
[ 464 ]
|
Liaison statement - IMT parameters for the band 790-862 MHz
|
JTG 5-6
|
|
2009-06-01 |
|
[ 463 ]
|
Proposal for a liaison statement to ITU-R Working Parties 5A and 1B on the study of software-defined radio (SDR) and cognitive radio systems (CRS)
|
United States of America
|
|
2009-05-28 |
|
[ 462 ]
|
Change proposals to Annexes in Recommendation ITU-R M.1036
|
UMTS Forum
|
|
2009-05-28 |
|
[ 461 ]
|
New proposed considerations for Recommendation ITU-R M.1036
|
UMTS Forum
|
|
2009-05-28 |
|
[ 460 ]
|
Liaison statement to ITU-R Study Group 15 on ANTS (copy for information to ITU-R Working Party 5D)
|
WP 5A
|
|
2009-05-28 |
|
[ 459 ]
|
Liaison statement to Working Party 5D copy to Working Parties 5A and 5B for information - Applicability of Recommendation ITU-R F.1336-2 for sectoral antenna patterns approximation
|
WP 5C
|
|
2009-05-28 |
|
[ 458 ]
|
Progression of the working document towards a preliminary draft revision of Recommendation ITU-R M.1036-3 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications (IMT) in the bands identified for IMT in the Radio Regulations (RRs)
|
Canada
|
229-2/5
|
2009-05-28 |
|
[ 457 ]
|
Liaison statement to Working Party 1B on the study of software-defined radio and cognitive radio systems (copy for information to WPs 5B, 5C and 5D)
|
WP 5A
|
|
2009-05-28 |
|
[ 456 ]
|
Construction of the web page for the analytical list of the Study Group 5 Recommendations
|
Chairman, SG 5
|
|
2009-05-27 |
|
[ 455 ]
|
Comments on Femtocells
|
Director, BR
|
|
2009-05-27 |
|
[ 454 ]
|
Change proposals for Recommendation ITU-R M.1036
|
Finland
|
|
2009-05-27 |
|
[ 453 ]
|
Considerations on M.1457 - Technologies, Chapter titles and document structure
|
Israel (State of)
|
229-1/8
|
2009-05-27 |
|
[ 452 ]
|
Revisions of Recommendations ITU-R M.1580-3 and ITU-R M.1581-3
|
WiMAX Forum
|
|
2009-05-27 |
|
[ 451 ]
|
On the optimum structure of Section 5.6 in the draft revision 9 of Recommendation ITU-R M.1457
|
WiMAX Forum
|
|
2009-05-27 |
|
[ 450 ]
|
On the applicability of the results in document 5/129 to sharing of CDMA DS and the FDD component of OFDMA TDD WMAN in adjacent channels in the same geographical area
|
WiMAX Forum
|
|
2009-05-27 |
|
[ 449 ]
|
On sharing of CDMA-DS and FDD component of OFDMA TDD WMAN in adjancent channels in the band 790-862 MHz in the same geographical area
|
WiMAX Forum
|
|
2009-05-27 |
|
[ 448 ]
|
Answers to Questions from Germany (Doc. 5D/422) on information on Sections 5.2 and 5.6 as requested in Document 5D/413, Chapter 1, Section 3.1
|
WiMAX Forum
|
|
2009-05-27 |
|
[ 447 ]
|
Answer to Questions from France (5D/421) on revision 9 of Recommendation ITU-R M.1457
|
WiMAX Forum
|
|
2009-05-27 |
|
[ 446 ]
|
Response to the liaison statement from Working Party 5D on Femtocells
|
WiMAX Forum
|
|
2009-05-27 |
|
[ 445 ]
|
Considerations for harmonized frequency arrangements for planning of UHF bands
|
India (Republic of)
|
|
2009-05-26 |
|
[ 444 ]
|
Response to liaison statement from Working Party 5D on IMT parameters in the 790-862 MHz band
|
IEEE
|
|
2009-05-26 |
|
[ 443 ]
|
On submission of candidate IMT-Advanced RIT based on IEEE Project 802.16m
|
IEEE
|
229-2/5
|
2009-05-26 |
|
[ 442 ]
|
Update of OFDMA TDD WMAN in Revision 9 of Recommendation ITU-R M.1457
|
IEEE
|
229-2/5
|
2009-05-26 |
|
[ 441 ]
|
Contribution to ITU-R Working Party 5D regarding Document 5D/421
|
IEEE
|
229-2/5
|
2009-05-26 |
|
[ 440 ]
|
Contribution to ITU-R Working Party 5D regarding Document 5D/422R1
|
IEEE
|
229-2/5
|
2009-05-26 |
|
[ 439 ]
|
Regarding the updates of Recommendation ITU-R M.1457
|
Director, BR
|
|
2009-05-22 |
|
[ 438 ]
|
Proposed update of Section 5.2 of Recommendation ITU-R M.1457-8
|
Director, BR
|
|
2009-05-22 |
|
[ 437 ]
|
Response to the comments in Document 5D/421 regarding revision 9 of Recommendation ITU-R M.1457
|
Director, BR
|
|
2009-05-22 |
|
[ 436 ]
|
Response to the comments in Document 5D/422 (Rev.1) regarding revision 9 of Recommendation ITU-R M.1457
|
Director, BR
|
|
2009-05-22 |
|
[ 435 ]
|
Liaison statement on new versions of the Access Network Transport (ANT) Standardization Plan and Work Plan
|
ITU-T SG 15
|
|
2009-05-20 |
|
[ 434 ]
|
Liaison statement on draft baseline text of G.hntreq "Requirements of transport functions in IP home network"
|
ITU-T SG 15
|
|
2009-05-20 |
|
[ 433 ]
|
Response to the liaison statement from ITU-R Working Party 5D on request for information on Femtocells
|
ETSI
|
|
2009-05-18 |
|
[ 432 ]
|
Liaison statement to Working Party 5D - Preliminary draft new Recommendation
ITU-R S.[IMT-PFD] on methodologies for determining whether an IMT base station at a given location operating in the band 3 400-3 600 MHz would transmit without exceeding the PFD limits in RR Nos. 5.430A, 5.432A, 5.432B and 5.433A of the Radio Regulations
|
WP 4A
|
|
2009-05-11 |
|
[ 431 ]
|
Liaison Statement to ITU-R Working Party 5D
|
ITU-D SG2
|
|
2009-05-05 |
Results:1180 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):