Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 34 ]
|
Proposal to change the title of the work item Q.3961 (Q.TM_Int_sp_test)
|
A1 Telekom Austria AG
|
Q9/11
|
2017-01-23 |
|
[ 33 ]
|
Proposed texts for Section 8 of draft ITU-T Recommendation Q.SAN-MIM
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q7/11
|
2017-01-23 |
|
[ 32 ]
|
Proposed texts for Section 7 of draft ITU-T Recommendation Q.SAN-MIM
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q7/11
|
2017-01-23 |
|
[ 31 ]
|
Proposed update texts for Section 6 of draft ITU-T Recommendation Q.SAN-MIM
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q7/11
|
2017-01-23 |
|
[ 30 ]
|
Draft revised Recommendation ITU-T Q.1912.5 "Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control protocol or ISDN User Part"
|
A1 Telekom Austria AG
,
Deutsche Telekom AG
|
Q2/11
|
2017-01-23 |
|
[ 29 ]
|
X.mp2p-mssr: Proposed modifications of requirements and addition of new terminologies
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q8/11
|
2017-01-23 |
|
[ 28 ]
|
Withdrawn due to duplication
|
N/A
|
|
2017-01-23 |
|
[ 27 ]
|
Proposal for amendment of I.570 for enhancement of Calling Party Number security
NOTE: this contribution is submitted to Q2/11 and Q2/13
|
China Telecommunications Corporation
|
Q2/11
|
2017-01-23 |
|
[ 26 ]
|
Withdrawn due to duplication
|
N/A
|
|
2017-01-23 |
|
[ 25 ]
|
Proposal to Clause 7.3 Functional testing for Q.wa-iop
|
China Telecommunications Corporation
|
Q14/11
|
2017-01-23 |
|
[ 24 ]
|
Proposal to start a new work item Q.IMS_NGN_Rel.11 "IMS references to Release 11 for NGN networks"
|
A1 Telekom Austria AG
|
Q2/11
|
2017-01-22 |
|
[ 23 ]
|
Withdrawn due to duplication
|
N/A
|
|
2017-01-22 |
|
[ 22 ]
|
Proposal for signalling procedure of network slicing in Q.PVMapping
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q4/11
|
2017-01-22 |
|
[ 21 ]
|
Simplify the illustration of figures in chapter 7 of Q.IPv6ProBB
|
Ministry of Industry and Information Technology (MIIT)
|
Q4/11
|
2017-01-22 |
|
[ 20 ]
|
Overview of CASC outcomes, future activities (Study Period 2017-2020)
|
Ghana
|
CASC
|
2017-01-20 |
|
[ 19 ]
|
Baseline text of the proposed new work item Q. Het_Gateway_Test "The structure of the testing of heterogeneous gateways"
|
Administration of the Russian Federation, Rostelecom, SPbSUT
|
Q12/11
|
2017-01-20 |
|
[ 18 ]
|
Proposal to start a new work item Q.Het_Gateway_Test "The structure of the testing of heterogeneous gateways"
|
Administration of the Russian Federation, Rostelecom, SPbSUT
|
Q12/11
|
2017-01-20 |
|
[ 17 ]
|
Results of the second stage of conformance testing pilot project on "Mobile network portability (ITU-T Q.Suppl.4)"
|
Administration of the Russian Federation
|
Q11/11
|
2017-01-20 |
|
[ 16 ]
|
Proposal to update to ITU-T Recommendation Q.Suppl.4
|
Administration of the Russian Federation
|
Q2/11
|
2017-01-20 |
|
[ 15 ]
|
Proposal to approve a draft Guidelines "ITU-T CASC procedure to appoint ITU-T technical experts"
|
Ghana
|
CASC
|
2017-01-20 |
|
[ 14 ]
|
IEC task force "CMC TF ITU Requirements"
|
Ghana
|
CASC
|
2017-01-20 |
|
[ 13 ]
|
Proposal to approve a draft Survey report on counterfeit ICT devices in Africa region
|
Ghana
|
Q15/11
|
2017-01-20 |
|
[ 12 ]
|
Draft new Recommendation ITU-T Q.3630 v.1_SI_NNI Req "Inter-IMS Network to Network Interface (NNI)"
|
A1 Telekom Austria AG
,
Deutsche Telekom AG
|
Q2/11
|
2017-01-20 |
|
[ 11 ]
|
Proposal for a baseline text of the new work item Q.VoLTE_INT_TEST "VoLTE/ViLTE interconnection testing for interworking and roaming scenarios including relevant QoS/QoE testing"
|
A1 Telekom Austria AG
,
Deutsche Telekom AG
|
Q11/11
|
2017-01-20 |
|
[ 10 ]
|
Proposal to start a new work item Q.VoLTE_INT_TEST "VoLTE/ViLTE interconnection testing for interworking and roaming scenarios including relevant QoS/QoE testing"
|
A1 Telekom Austria AG
,
Deutsche Telekom AG
|
Q11/11
|
2017-01-20 |
|
[ 9 ]
|
Proposal to advance a Draft new Recommendation ITU-T Q.30xx_VoLTE_Interconnection_FW "Framework of interconnection of VoLTE/ViLTE-based networks"
|
A1 Telekom Austria AG
|
Q2/11
|
2017-01-20 |
|
[ 8 ]
|
Proposal on method for development of draft Recommendation Q.infra-iop
|
China Telecommunications Corporation
|
Q14/11
|
2017-01-20 |
|
[ 7 ]
|
Proposal on Cloud computing infrastructure capabilities interoperability testing between CSC and CSP
|
China Telecommunications Corporation
|
Q14/11
|
2017-01-20 |
|
[ 6 ]
(Rev.1) |
Proposal on initiating the study of signalling requirements for interconnection between VoLTE-based network and other networks supporting emergency telecommunications service (ETS)
|
China Telecommunications Corporation
|
Q9/11, Q3/11, Q2/11, Q11/11
|
2017-01-19 |
|
[ 5 ]
|
Proposal on initiating the study of signalling architecture supporting virtualization of control network entities
|
China Telecommunications Corporation
|
Q1/11
|
2017-01-19 |
|
[ 4 ]
(Rev.1) |
Proposal on consenting draft Recommendation Q.Arc-IPSMS at February 2017 SG11 meeting
|
China Telecommunications Corporation
|
Q1/11
|
2017-01-19 |
|
[ 3 ]
|
X.mp2p-mspp: Proposed texts for protocol behaviour and modifications to peer types
|
Korea (Rep. of)
|
Q8/11
|
2017-01-19 |
|
[ 2 ]
(Rev.1) |
X.mp2p-msomp: Proposed updates
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q8/11
|
2017-01-18 |
|
[ 1 ]
(Rev.1) |
Title, mandate, lead roles, points of guidance and Questions for ITU-T Study Group 11 in the study period 2017-2020
Revision 1 aligns the metadata of Contribution 1
|
WTSA-16
|
QALL/11
|
2016-11-18 |
Results:684 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14
|
Multiple Document Download: Formats and Languages to be included (when available):