Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1563 ]
(Rev.1) |
G.fast: requirements for the DBA TDD DS/US ratio limits
|
AT&T, Inc.
,
ADTRAN
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-01-29 |
|
[ 1562 ]
|
G.fast coax cable configurations
|
ADTRAN
,
AT&T, Inc.
|
Q4/15
|
2016-01-29 |
|
[ 1561 ]
(Rev.1) |
G.fast 212 MHz amendment
|
AT&T, Inc.
,
Orange
,
TELUS Communications
|
Q4/15
|
2016-01-29 |
|
[ 1560 ]
|
Microducts technology and its application in the access network
|
Italy
|
Q16/15
|
2016-01-29 |
|
[ 1559 ]
|
Proposals on L.fmc
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q7/15
|
2016-01-29 |
|
[ 1558 ]
|
Revised proposal on chromatic dispersion specifications of G.652.D fibre
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q5/15
|
2016-01-29 |
|
[ 1557 ]
(Rev.1) |
Proposal of restarting work on G.8132 MPLS-TP ring protection recommendation
|
Korea (Rep. of)
|
Q9/15
|
2016-01-29 |
|
[ 1556 ]
|
Proposed revision of G.652 & G.657
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q5/15
|
2016-01-29 |
|
[ 1555 ]
|
Numerical study of statistical chromatic dispersion characteristics of G.652.D fibre link
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q5/15
|
2016-01-29 |
|
[ 1554 ]
|
Proposed revision of G.651.1 Recommendation
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2016-01-29 |
|
[ 1553 ]
|
RMS Frequency Offset of CPRI Clients Asynchronously Mapped to and Demapped from OTN
|
Microsemi Corporation
|
Q13/15, Q11/15
|
2016-01-29 |
|
[ 1552 ]
|
PTP Timestamping on Multilane OTN Interfaces
|
Microsemi Corporation
|
Q13/15, Q11/15
|
2016-01-29 |
|
[ 1551 ]
|
Proposal for initial text in draft L.wdc
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q17/15
|
2016-01-29 |
|
[ 1550 ]
|
G.fast: Signalling of DBA updates over the RMC
|
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-01-28 |
|
[ 1549 ]
|
G.fast: DBA proposed way for changing the TDD DS/US ratio during showtime
|
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-01-28 |
|
[ 1548 ]
|
G.cca: Resource Database Interfaces
|
Ciena Canada
|
Q14/15, Q12/15
|
2016-01-28 |
|
[ 1547 ]
|
G.cca - clause 6 - Overview
|
Ciena Canada
|
Q14/15, Q12/15
|
2016-01-28 |
|
[ 1546 ]
|
SDN control of media
|
Ciena Canada
|
Q14/15, Q12/15
|
2016-01-28 |
|
[ 1545 ]
|
G.800 - Transport Entities
|
Ciena Canada
|
Q12/15
|
2016-01-28 |
|
[ 1544 ]
|
G.800 - Clarifications
|
Ciena Canada
|
Q12/15
|
2016-01-28 |
|
[ 1543 ]
|
G.8272.1 Functional Model
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1542 ]
|
G.8272.1 Clause 9
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1541 ]
|
G.8272.1 Clause 8.2
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1540 ]
|
G.8272.1 Clause 6.3.1
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1539 ]
|
G.8272.1 Clause 6.2
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1538 ]
|
G.8272.1 Clause 6.1
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1537 ]
|
G.8272.1 Clause 6
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1536 ]
|
G.8272.1 scope
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1535 ]
|
G.8275.2 Support interoperability with equipment deployed per ITU-T G.8265.1
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1534 ]
|
G.8275.2 Table 1
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1533 ]
|
G.8275.2 data set members
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1532 ]
|
G.8275.1 twoStepFlag range for a Telecom Time Slave Clock
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1531 ]
|
G.8265.1 twoStepFlag range for a Slave only clock
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-01-28 |
|
[ 1530 ]
|
Considerations on new Ethernet signals over OTN
|
KDDI Corporation
|
Q11/15
|
2016-01-28 |
|
[ 1529 ]
|
Process for contributing
|
Telecom Italia S.p.A.
|
Q9/15
|
2016-01-28 |
|
[ 1528 ]
|
Analysis of cross gain modulation caused by pilot tones
|
ADVA Optical Networking
|
Q6/15
|
2016-01-27 |
|
[ 1527 ]
|
Method for Carrier Phase Recovery
|
Coriant GmbH & Co. KG
,
Keysight Technologies Deutschland GmbH
|
Q6/15
|
2016-01-27 |
|
[ 1526 ]
|
G.fast - Need for improved reporting of EFTR
|
Swisscom SA
|
Q4/15
|
2016-01-27 |
|
[ 1525 ]
|
Proposal of Cooperation Interface enabling Low-latency Services
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q2/15
|
2016-01-27 |
|
[ 1524 ]
|
G.fast - Need for seamless reconfiguration of TARSNRM
|
Swisscom SA
|
Q4/15
|
2016-01-22 |
|
[ 1523 ]
|
Follow-up on G.8275.2: Requirement for an Accurate T3 Value
|
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1522 ]
|
Summary on G.8266 for finalization.
|
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1521 ]
|
Clarification on the timing accuracy specification for the 1PPS measurement interface
|
Huawei Technologies Co., Ltd.
,
Orange
,
Telefon AB - LM Ericsson
|
Q13/15, Q11/15
|
2016-01-22 |
|
[ 1520 ]
|
Editorial on ToD from the contribution WDPisa32
|
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1519 ]
|
Phase/time synchronization over Microwave networks
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1518 ]
|
Additional information on frequencyTraceable Flag of G.8275.1
|
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1517 ]
|
Text modification under section 6.4 of G.8275.1
|
China Unicom
,
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1516 ]
|
PTP interfaces requirements for G.8266
|
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1515 ]
|
Proposal to study Synchronization over Ethernet in the Fronthaul (G.8271)
|
Orange
|
Q13/15
|
2016-01-22 |
|
[ 1514 ]
|
Functional Block diagram for ePRTC
|
Orange
|
Q13/15
|
2016-01-22 |
Results:2210 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):