International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5C  C 

ITU-R WP5C

Fixed wireless systems; HF and other systems below 30 MHz in the fixed and land mobile services

Results:665 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 15 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C AND 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]     WP 5D     2016-03-09
[ 14 ]  
 
Liaison statement to Working Party 4A (copy for information to Working Parties 5A and 5C) - Working document towards a preliminary draft new Recommendation ITU-R SF.[INTERF.AREA]     WP 5D     2016-03-08
[ 13 ]  
 
Reply liaison statement to ITU-T Study Group 5, ITU-D Study Group 2, ITU-R Working Party 6A (copy for information to Working Parties 3L, 1B, 1C, 5A, 5B, 5C) on information about work that is being carried out within work under study in ITU-T Q7/5 (Human exposure to electromagnetic fields (EMFS) due to radio systems and mobile equipment)     WP 5D     2016-03-08
[ 12 ]  
 
Liaison statement on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) - Standards overview and workplans     ITU-T SG 15     2016-03-08
[ 11 ]  
 
Liaison statement on the latest versions of the Home Network Transport (HNT) - Standards overview and workplan     ITU-T SG 15     2016-03-08
[ 10 ]  
 
Liaison statement on the latest versions of the Access Network Transport (ANT) - Standards overview and workplan     ITU-T SG 15     2016-03-08
[ 9 ]  
 
Liaison statement on ITU-T SG15 - Optical Transport Networks & Technologies (OTNT) standardization workplan     ITU-T SG 15     2016-05-10
[ 8 ]  
(Rev.1) 
Liaison statement to ITU-R Working Party 5A - Copy to Working Party 5C for information - AWG studies related to possible future works of APG regarding WRC agenda item 1.15     Asia-Pacific Telecommunity     2016-02-19
[ 7 ]  
 
Liaison statement to ITU-R Working Parties 3J & 3M copy to Working Party 5C for information - AWG studies on fixed wireless link performance under severe weather conditions     Asia-Pacific Telecommunity     2016-02-19
[ 6 ]  
 
Reply liaison statement informing about MEF 22.1 and MEF 22.1.1 - Mobile backhaul implementation agreement     Director, BR     2016-02-12
[ 5 ]  
 
Liaison statement to ITU-R Study Groups 4 and 5 and ITU-T Study Groups 9 and 16 on Global Platform for the Broadcasting Service - Global Platform for the Broadcasting Service     WP 6B   140/6   2016-02-04
[ 4 ]  
 
Liaison statement to Working Party 5A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda item 1.1     WP 6A   AI1.1   2016-02-03
[ 3 ]  
 
Liaison statement on performance and availability objectives and requirements for fixed wireless systems, including packet-based systems     ITU-T SG 13     2015-12-18
[ 2 ]  
 
Liaison statement on information about work that is being carried out within work under study in ITU-T Question 7/5     ITU-T SG 5     2015-12-08
[ 1 ]  
 
Documents to be carried over from the 2012-2015 study period     WP 5C     2015-12-08
Results:665 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-10-18