Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 81 ]
|
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7
|
WP 5A
|
1.7
|
2016-05-25 |
|
[ 80 ]
|
Liaison statement to Working Party 7B (copied for information to Working Parties 3M, 4C, 5B, 5C, 5D and 6A) - Technical characteristics for WRC-19 agenda item 1.3
|
WP 5A
|
AI1.3
|
2016-05-25 |
|
[ 79 ]
|
Liaison statement to Working Parties 1A, 1B, 4A, 5B, 5C and 5D - Study of sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications
|
WP 5A
|
|
2016-05-25 |
|
[ 78 ]
|
Liaison statement to Working Party 6A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) - WRC-19 agenda 1.1
|
WP 5A
|
AI1.1
|
2016-05-25 |
|
[ 77 ]
|
Reply liaison statement to Working Party 1A (copy for information to Working Parties 1B, 5B 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
|
WP 5A
|
|
2016-05-25 |
|
[ 76 ]
|
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Preparation for WRC-19 agenda item 1.13
|
TG 5/1
|
AI1.13
|
2016-05-25 |
|
[ 75 ]
|
Liaison statement to Working Party 5B - Preliminary draft new Report ITU-R F.[FS/RLS COMPATIBILITY IN 71-86 GHZ] - P-P/P-MP applications in the fixed service operating in the 71-76 GHz and 81-86 GHz bands and automotive radar applications in the radiolocation service operating in the 76-81 GHz band (Question ITU-R 252/5)
|
WP 5C
|
|
2016-05-24 |
|
[ 74 ]
|
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5B and 6A) - WRC-19 agenda item 1.7
|
WP 5C
|
AI1.7
|
2016-05-24 |
|
[ 73 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5B and 5D) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]
|
WP 5C
|
|
2016-05-20 |
|
[ 72 ]
|
Liaison statement to Working Party 7C (copy to Working Parties 5B and 6A for information) - Technical and operational characteristics for systems operating within the 40-50 MHz frequency band
|
WPs 5A and 5C
|
|
2016-05-20 |
|
[ 71 ]
+Ann.1-27 |
Report on the meeting of Working Party 5B (Geneva, 10-20 May 2016)
|
Chairman, WP 5B
|
|
2016-05-20 |
|
[ 70 ]
|
Final list of participants - Working Party 5B (Geneva, 10-20 May 2016)
|
Director, BR
|
|
2016-05-20 |
|
[ 69 ]
|
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5
|
ITU-T SG 5
|
|
2016-05-13 |
|
[ 68 ]
|
List of documents issued (Documents 5B/1 - 5B/68)
|
BR Study Groups Department
|
|
2016-05-09 |
|
[ 67 ]
|
Report on liaison with CENELEC on developments concerning PLT, EMI and WPT - Communication by the Rapporteur on coexistence of wired telecommunication with radiocommunication systems
|
Chairman, WP 5A
|
|
2016-05-09 |
|
[ 66 ]
|
Proposals on the studies under WRC-19 agenda item 1.8 introduction of additional satellite systems into the GMDSS
|
United Arab Emirates
|
|
2016-05-03 |
|
[ 65 ]
|
Implementation of Resolution 155 (WRC-15) - WRC-15 agenda item 1.5, UAS-FSS
|
Iran (Islamic Republic of)
|
|
2016-05-03 |
|
[ 64 ]
|
Working document towards preliminary draft new Recommendation ITU-R M.[AMS 4.4-5GHZ] - Technical characteristics of, and protection criteria for aeronautical mobile systems operating in the frequency band 4 400-4 990 MHz
|
France
|
|
2016-05-03 |
|
[ 63 ]
|
Satellite supportability for unmanned aircraft control and non-payload communication
|
United Kingdom of Great Britain and Northern Ireland
|
|
2016-05-03 |
|
[ 62 ]
|
Working document to the proposal of the preliminary draft revision on the Recommendation ITU-R M.1371-5 - Technical characteristics for an automatic identification system using time division multiple access in the VHF maritime mobile frequency band
|
China (People's Republic of)
|
|
2016-05-03 |
|
[ 61 ]
|
Proposal of liaison statement to Working Party 3K and Working Party 3M on ITU-R propagation Recommendations used by Working Party 5B
|
France
|
|
2016-05-03 |
|
[ 60 ]
|
Working document towards preliminary draft revision of Recommendation ITU-R M.1851-0 - Mathematical models for radiodetermination radar systems antenna patterns for use in interference analyses
|
France
|
|
2016-05-03 |
|
[ 59 ]
|
Proposal on studies at Working Party 5B for Resolution 155 (WRC-15)
|
France
|
|
2016-05-02 |
|
[ 58 ]
|
Working document towards a preliminary draft new Report ITU-R M.[ADS-B] - Reception of automatic dependent surveillance broadcast via satellite and compatibility studies with incumbent systems in the frequency band 1 087.7-1 092.3 MHz
|
France
|
|
2016-05-02 |
|
[ 57 ]
|
Working document towards a preliminary draft new [RECOMMENDATION / REPORT] [PEAK FDR] - Peak frequency dependent rejection for pulsed systems
|
France
|
|
2016-05-02 |
|
[ 56 ]
|
Preliminary draft revision of Recommendation ITU-R M.2013-0 - Technical characteristics of, and protection criteria for non-ICAO aeronautical radionavigation systems, operating around 1 GHz
|
France
|
|
2016-05-02 |
|
[ 55 ]
|
Preliminary draft revision of Recommendation ITU-R M.1466-0 - Characteristics of and protection criteria for radars operating in the radionavigation service in the frequency band 31.8-33.4 GHz (Question ITU-R 226/8)
|
France
|
|
2016-05-02 |
|
[ 54 ]
|
Preliminary draft revision of Recommendation ITU-R M.1461-1 - Procedures for determining the potential for interference between radars operating in the radiodetermination service and systems in other services
|
France
|
|
2016-05-02 |
|
[ 53 ]
|
Proposal of future framework for Recommendations related to radiodetermination, including radiolocation, radionavigation services
|
France
|
|
2016-05-02 |
|
[ 52 ]
|
Proposed revision to working document towards a preliminary draft new Report ITU-R M.[ADS-B] - Reception of automatic dependent surveillance broadcast via satellite and compatibility studies with incumbent systems in the frequency band 1 087.7-1 092.3 MHz
|
Canada
|
|
2016-05-02 |
|
[ 51 ]
|
Proposed revision of working document towards a preliminary draft new Report ITU-R M.[FLIGHT TRACKING] - Global flight tracking for civil aviation
|
Canada
|
|
2016-05-02 |
|
[ 50 ]
|
This document has been withdrawn
|
Indonesia (Republic of)
|
|
2016-05-02 |
|
[ 49 ]
|
Preliminary study to detect restrictions on aircraft messages using GADSS
|
Universidad Tecnológica Nacional (Argentina)
|
|
2016-05-02 |
|
[ 48 ]
|
Liaison statement to Working Parties 5A, 5B and 5C - Technical characteristics and protection criteria for fixed and mobile services in support of studies under WRC-19 agenda item 9.1, issue 9.1.3
|
WP 4A
|
AI9.1
|
2016-05-02 |
|
[ 47 ]
|
Liaison statement to Working Parties 5A, 5B, 5C and 5D - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]
|
WP 4A
|
|
2016-05-02 |
|
[ 46 ]
|
Liaison statement to Working Parties 5A, 5B and 5C - Working document towards a preliminary draft new Recommendation ITU-R S.[GUIDELINES _14.5-14.8]
|
WP 4A
|
|
2016-05-02 |
|
[ 45 ]
|
Maritime mobile service identity for a robot survey vessel
|
Netherlands (Kingdom of the)
|
|
2016-04-29 |
|
[ 44 ]
|
Working document to the study of autonomous maritime radio devices for supporting WRC-19 agenda item 1.9.1
|
China (People's Republic of)
|
AI1.9.1
|
2016-04-29 |
|
[ 43 ]
|
Autonomous maritime radio devices operating in the frequency band 156-162.05 MHz - Identification and categorization of autonomous maritime radio devices
|
United States of America
|
|
2016-04-28 |
|
[ 42 ]
|
Working document - Work plan for WRC-19 agenda item 1.8 - Introduction of additional satellite systems into the GMDSS
|
United States of America
|
|
2016-04-28 |
|
[ 41 ]
|
Working document towards draft CPM text on WRC-19 agenda item 1.8 and reply liaison to WP 4C
|
United States of America
|
|
2016-04-28 |
|
[ 40 ]
|
Liaison statement to ICAO - Draft study results related to the impact of incumbent systems to earth-stations on board unmanned aircraft
|
United States of America
|
|
2016-04-28 |
|
[ 39 ]
|
Working document towards a preliminary draft new Report ITU-R M.[ATC MODELING] - Software modeling of air traffic control primary surveillance radars
|
United States of America
|
|
2016-04-28 |
|
[ 38 ]
|
Proposed updates to WD-PDN Report ITU-R M.[ASR PERF 2 700-2 900 MHz] - Radar receiver performance measurements of interference into aeronautical radionavigation service radars operating in the frequency band 2 700-2 900 MHz
|
United States of America
|
|
2016-04-28 |
|
[ 37 ]
|
Working document towards a preliminary draft new Report ITU-R M.[SYS-NOISE-TEMP] - Procedures for estimating radar system noise temperature
|
United States of America
|
|
2016-04-28 |
|
[ 36 ]
|
Working document towards a preliminary draft new Report ITU-R M.[PULSES-BEAM] - Procedures for estimating number of pulses in radar antenna 3 dB beamwidth
|
United States of America
|
|
2016-04-28 |
|
[ 35 ]
|
Working document towards a preliminary draft new Report [PEAK FDR] - Peak frequency dependent rejection for pulsed systems
|
United States of America
|
|
2016-04-28 |
|
[ 34 ]
|
Comments on work of WP 5B regarding the outcomes of WRC-15 agenda item 1.5, UAS-FSS - Coordination of activities within ITU-R and ICAO in response to Resolution 155 [COM4/5] (WRC-15) regarding the use of FSS bands by UAS
|
United States of America
|
AI1.5
|
2016-04-28 |
|
[ 33 ]
|
Liaison Note to ITU-R Working Party 5B - Regarding the cooperation with IALA
|
International Association of Marine Aids to Navigation and Lighthouse Authorities
|
|
2016-04-28 |
|
[ 32 ]
|
Liaison Note to ITU-R Working Party 5B - Regarding the agenda item 1.9.2 (WRC-19)
|
International Association of Marine Aids to Navigation and Lighthouse Authorities
|
AI1.9.2
|
2016-04-28 |
Results:731 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):