Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 5 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 5  C 

UIT-T SG 5

Environment, climate change and circular economy

Periodo de estudios 2017

Resultados :902 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 302 ]  
(Rev.1) 
Re-review of C261 (K.21 contribution)     Bourns Limited   Q2/5   2018-07-06
[ 301 ]  
(Rev.1) 
Re-review of C244 (K.20 contribution)     Bourns Limited   Q2/5   2018-07-06
[ 300 ]  
 
Re-review of C243 (K.44 contribution)     Bourns Limited   Q2/5   2018-07-06
[ 299 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 9: Proposal consolidation of C291 to C298     Bourns Limited   Q2/5   2018-07-05
[ 298 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 8: Updating K.44 for 400 V d.c. powering     Bourns Limited   Q2/5   2018-07-04
[ 297 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 7: Test circuit figure to replace K.44 Figure A.6.6-2, Figure A.6.6-1a and Figure A.6.6-1b.     Bourns Limited   Q2/5   2018-07-03
[ 296 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 6: Review of 7.8 and 7.9 test entries (K.20 and K.21)     Bourns Limited   Q2/5   2018-07-03
[ 295 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 5: Review of DC power feed surge test figures of Table 1b (K.20, K.21 and K.45)     Bourns Limited   Q2/5   2018-07-02
[ 294 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 4: DC power feed tests of Tables 1a and 1b (K.20, K.21 and K.45)     Bourns Limited   Q2/5   2018-07-01
[ 293 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 3: Powering supply configurations     Bourns Limited   Q2/5   2018-06-30
[ 292 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 2: Grid terms review     Bourns Limited   Q2/5   2018-06-30
[ 291 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part1 Background     Bourns Limited   Q2/5   2018-06-29
[ 290 ]  
 
Proposed new work item on Opportunities of the Circular Economy of E-waste management     Rwanda , Senegal   Q7/5   2018-06-28
[ 289 ]  
(Rev.1) 
Proposed new work item on Adequate Assessment and Sensitization on the Impact of Counterfeit Electronics Products on the environment in Africa     Kenya , Rwanda , Tanzania , Uganda   Q7/5   2018-06-28
[ 288 ]  
 
Regional e-waste management strategy for the East African Region     Kenya , Rwanda , Uganda   Q7/5   2018-06-28
[ 287 ]  
 
End of life Management (EoL) management of communications equipment and products     Uganda Communications Commission (UCC)   Q7/5   2018-06-28
[ 286 ]  
 
Social aspects in the management of e-waste     Ministry of Communications and Information Technology (MCIT) (Egypt)   Q7/5   2018-06-28
[ 285 ]  
 
The Role of Policy, Regulations, Standards in E-Waste Management (Case Study Rwanda)     Rwanda   Q7/5   2018-06-28
[ 284 ]  
 
Extended producer responsibility in developing countries and countries with economies in transition     Uganda Communications Commission (UCC)   Q7/5   2018-06-28
[ 283 ]  
 
Smart Technology for Smart & Sustainable Agriculture in the Arab Region     Arab Information and Communication Technology Organization (AICTO)   Q9/5   2018-06-27
[ 282 ]  
 
Comparison of accreditation standards for e-waste recyclers     Ministry of Communications and Information Technology (MCIT) (Egypt) , Palestine Technical University Kadoorie (State of Palestine) , Sudan   Q7/5   2018-06-27
[ 281 ]  
 
Proposed new work item on Sustainable management of batteries resulting from ICT equipment Sustainable management of batteries resulting from ICT equipment     Kenya , Ministry of Communications and Information Technology (MCIT) (Egypt) , Palestine Technical University Kadoorie (State of Palestine) , Sudan , Uganda Communications Commission (UCC)   Q7/5   2018-06-27
[ 280 ]  
 
Experimental Pilot Plant on e-Waste for Smart Cities based on the circular economy     Argentina   Q7/5   2018-06-26
[ 279 ]  
 
Electromagnetic field measurements to assess human exposure for 5G (IMT 2020) base station     Agencia Nacional del Espectro (ANE) (Colombia)   Q3/5   2018-06-26
[ 278 ]  
 
Integration of K-series ITU T Recommendations for the regulation of compliance with electromagnetic field exposure levels in the Republic of Colombia     Agencia Nacional del Espectro (ANE) (Colombia)   Q3/5   2018-06-26
[ 277 ]  
 
Proposed new work item on K.Small - "Small base stations - impact on the overall exposure level"     Argentina   Q3/5   2018-05-09
[ 276 ]  
 
Proposed new work item on K.reflection - "Impact of the metallic structures for the EMF exposure level"     Argentina   Q3/5   2018-05-09
[ 275 ]  
 
Proposed new work item on K.peak - "Comparison between peak and real exposure in the long term considerations"     Argentina   Q3/5   2018-05-09
[ 274 ]  
 
Proposed new work item on ITU-T K.Zones - "Guidance on Determining the Compliance Boundaries (the exclusion zone) of a Live Antenna"     Argentina   Q3/5   2018-05-09
[ 273 ]  
 
Proposed new work item on K.dosimeter - "Personal dosimeters as a device in assessing human exposure to EMF"     Argentina   Q3/5   2018-05-09
[ 272 ]  
(Rev.1) 
IEC 60617 compliance and PoE testing     Bourns Limited   Q2/5   2018-05-08
[ 271 ]  
(Rev.1-2) 
Insulation co-ordination and IEEE 802.3 insulation tests     Bourns Limited   Q2/5   2018-05-08
[ 270 ]  
(Rev.1) 
IP PoE camera systems - Bridging Functional Insulation - implications and system consequences     Bourns Limited   Q2/5, Q1/5   2018-05-08
[ 269 ]  
 
Clarification needed on PoE testing - topics for discussion     Bourns Limited   Q2/5   2018-05-08
[ 268 ]  
(Rev.1) 
Draft ITU-T Recommendation K.Radio.EMC - Electromagnetic Compatibility requirement for radio telecommunication equipment     Nokia Corporation   Q4/5   2018-05-08
[ 267 ]  
 
Referencing Figure 6.7-3 given in the ITU-T K.44     Bourns Limited   Q2/5   2018-05-08
[ 266 ]  
 
Adequate assessment and sensitization on possible human exposure to RF EMF radiation around telecommunications installations     Uganda Communications Commission (UCC)   Q3/5   2018-05-08
[ 265 ]  
(Rev.1) 
Harmonizing EMF Exposure Limits     Office of Electronic Communications , Poland   Q3/5   2018-05-08
[ 264 ]  
(Rev.1-3) 
Some reworked material for K.rcd document     Bourns Limited , China Telecommunications Corporation   Q2/5   2018-05-08
[ 263 ]  
(Rev.1) 
Proposed second draft of K.soft_req "Reliability requirement of particle radiation effect for telecommunication systems"     Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation   Q5/5   2018-05-08
[ 262 ]  
(Rev.1) 
Proposal of third draft of K.soft_mes "Quality estimation methods and application guidelines for mitigation measures based on particle radiation tests"     Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation   Q5/5   2018-05-08
[ 261 ]  
(Rev.1) 
Proposal for the revision of ITU-T Rec. K.21 (07/2017) Resistibility of telecommunication equipment installed in customer premises to overvoltages and overcurrents     Nokia Corporation   Q2/5   2018-05-07
[ 260 ]  
(Rev.1) 
Proposal for the revision of ITU-T Rec. K.45 (07/2017) Resistibility of telecommunication equipment installed in the access and trunk networks to overvoltages and overcurrents     Nokia Corporation   Q2/5   2018-05-07
[ 259 ]  
(Rev.1) 
Proposal for Annex A "Case Study" to supplement TD 366 K.Supp-5G_EMF_Compliance: Electromagnetic field (EMF) compliance assessments for 5G wireless networks     Ministry of Communications , India   Q3/5   2018-05-07
[ 258 ]  
(Rev.1) 
Proposal for Supplement K.BPrac (May 2018)     GSMA   Q3/5   2018-05-07
[ 257 ]  
 
Modified proposal for Appendix II of K.121 on RF-EMF Compliance of Shared Radiocommunications Sites     GSMA   Q3/5   2018-05-07
[ 256 ]  
(Rev.1) 
New version v 7.01 of the software "EMF-estimator"     Orange Polska S.A. , National Institute of Telecommunications , Poland   Q3/5   2018-05-07
[ 255 ]  
(Rev.1) 
Minimum distances to transmitting antennas     Orange Polska S.A.   Q3/5   2018-05-07
[ 254 ]  
(Rev.1) 
Revision of the ITU-T Recommendation K.90     Orange Polska S.A.   Q3/5   2018-05-07
[ 253 ]  
 
Comparison of controlled and uncontrolled exposure levels     Orange Polska S.A.   Q3/5   2018-05-07
Resultados :902 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2022-01-20