Contributions  |
|
Number
|
Title
|
Source
|
Date
|
|
[ 125 ]
(Rev.1) |
Working document towards a PDNR - Vision and objectives for ongoing enhancement of IMT-2000 and systems beyond
|
United Kingdom of Great Britain and Northern Ireland
|
2002-02-27 |
|
[ 124 ]
(Rev.1) |
Region 1 Rapporteur report
|
France
|
2002-02-27 |
|
[ 123 ]
(Rev.1) |
Principles for the process for evaluating proposals for non-routine updates for Recommendation ITU-R M.1457 including emerging technologies
|
France
|
2002-02-27 |
|
[ 122 ]
(Rev.1) |
Updating RSPC
|
France
|
2002-02-27 |
|
[ 121 ]
(Rev.1) |
Initial thoughts on the questions relating to the development of frequency arrangements of IMT-2000 terrestrial components
|
France
|
2002-02-27 |
|
[ 120 ]
(Rev.1) |
Modifications to PDNR ITU-R [IMT-CRC]
|
France
|
2002-02-27 |
|
[ 119 ]
(Rev.1) |
Structure of work in WP 8F in relation to IMT - Vision and studies to address WRC-03 Agenda Item 7.2 (Future development of IMT-2000 and systems beyond)
|
Finland, France, United Kingdom of Great Britain and Northern Ireland
|
2002-02-27 |
|
[ 118 ]
(Rev.1) |
Modifications to Annex 3 to Attachment 6 to Documnet 8F/63, Section 4.1: the example frequency arrangement which considers the three bands 1.7 GHz, 2GHz and 2.5 GHz together
|
Nokia Corporation
|
2002-02-27 |
|
[ 117 ]
(Rev.1) |
Questions suitable for alternative appropval procedure (AAP)
|
France
|
2002-02-27 |
|
[ 116 ]
(Rev.1) |
Report from the Liaison Rapporteur from Working Party 6S to Working Party 8F
|
Rapporteur, WP 6S
|
2002-02-27 |
|
[ 115 ]
(Rev.1) |
Adaptive antenna concepts and key technical characteristics
|
United States of America
|
2002-02-27 |
|
[ 114 ]
(Rev.1) |
Proposal on the update process of the RSPC Recommendation ITU-R M.1457
|
Japan
|
2002-02-27 |
|
[ 113 ]
(Rev.1) |
Arrangements for global circulation of IMT-2000 terminals
|
Japan
|
2002-02-27 |
|
[ 112 ]
(Rev.1) |
Comments on handling of PDNR [IMT.RCIRC] and former PDNR [IMT.TERM]
|
Japan
|
2002-02-27 |
|
[ 111 ]
(Rev.1) |
Consideration of deployment scenarios of systems beyond IMT-2000
|
Japan
|
2002-02-27 |
|
[ 110 ]
(Rev.1) |
Urban path loss characteristics for the systems design consideration fo further development of IMT-2000 and systems beyond IMT-2000
|
Japan
|
2002-02-27 |
|
[ 109 ]
(Rev.1) |
IMT-2000 Handbook contribution on HAPS
|
United States of America
|
2002-02-27 |
|
[ 108 ]
(Rev.1) |
Urban multipath propagation characteristics in 3 GHz band to 15 GHz band for system design consideration of further development of IMT-2000 and systems beyond IMT-2000
|
Japan
|
2002-02-27 |
|
[ 107 ]
(Rev.1) |
Proposal on revised structure of PDNR on vision and objectives
|
Japan
|
2002-02-27 |
|
[ 106 ]
(Rev.1) |
Comments on the Working Document toward preliminary Draft New Recommendation handling of measurement uncertainty for [the terrestrial component of] IMT-2000
|
United States of America
|
2002-02-27 |
|
[ 105 ]
(Rev.1) |
Revision of Recommendation ITU-R M.1457
|
United Kingdom of Great Britain and Northern Ireland
|
2002-02-27 |
|
[ 104 ]
(Rev.1) |
Proposed working method for the development of PDNR on vision and objectives of ongoing enhancement of IMT-2000 and systems beyond IMT-2000
|
Japan
|
2002-02-27 |
|
[ 103 ]
(Rev.1) |
Updating RSPC
|
United Kingdom of Great Britain and Northern Ireland
|
2002-02-27 |
|
[ 102 ]
(Rev.1) |
Possible frequency arrangements in the spectrum identified by WARC-92 and WRC-2000 for IMT-2000
|
Brazil (Federative Republic of), Chile, Guatemala (Republic of), Mexico, Venezuela (Republic of)
|
2002-02-27 |
|
[ 101 ]
(Rev.1) |
Liaison statement to Working Party 8F - Methodology for assessing the potential for interference between IMT-2000 and other services
|
WP 8A
|
2002-02-27 |
|
[ 100 ]
(Rev.1) |
Liaison response from ARIB on the RSPC updating process
|
Director, BR
|
2002-02-27 |
|
[ 99 ]
(Rev.1) |
Response from ARIB to the liaison statement on Unwanted emissions
|
Director, BR
|
2002-02-27 |
|
[ 98 ]
(Rev.1) |
Routine update of RSPC
|
ETSI
|
2002-02-27 |
|
[ 97 ]
(Rev.1) |
Modification to working document toward preliminary draft new Recommendation - Handling of measurement uncertainty for [the terrestrial component of] IMT-2000
|
Director, BR
|
2002-02-27 |
|
[ 96 ]
(Rev.1) |
Sharing characteristics between high altitude platform stations providing IMT-2000 and other non-IMT-2000 systems operating in the same bands or adjacent bands
|
United States of America
|
2002-02-27 |
|
[ 95 ]
(Rev.1) |
Proposed framework for WRC-03 Agenda item 1.22 (Further development of IMT-2000 and systems beyond)
|
United Kingdom of Great Britain and Northern Ireland
|
2002-02-27 |
|
[ 94 ]
(Rev.1) |
Proposed framework for WRC-03 agenda item 1.33 (HAPS operation in the spectrum identified for IMT-2000 in S5.388)
|
United Kingdom of Great Britain and Northern Ireland
|
2002-02-27 |
|
[ 93 ]
(Rev.1) |
Liaison statement to ITU-R Study Group 1 and Working Parties 6M, 6E, 7E, 8A, 8F, 9B and JRG 8A-9B - Terrestrial wireless interactive multimedia systems
|
JTG 1-6-8-9
|
2002-02-27 |
|
[ 92 ]
(Rev.1) |
Response from ARIB to ITU-R liaison statement on the updating of RSPC
|
Director, BR
|
2002-02-27 |
|
[ 91 ]
(Rev.1) |
Submission, evaluation and qualification of satellite RTTS for IMT-2000
|
Director, BR
|
2002-02-27 |
|
[ 90 ]
(Rev.1) |
3GPP2 Radio Interface Specifications
|
Director, BR
|
2002-02-27 |
|
[ 89 ]
(Rev.1) |
Modifications to the guidelines in Document 8F/63 (Annex 1 to Attachment 6)
|
Germany (Federal Republic of)
|
2002-02-27 |
|
[ 88 ]
(Rev.1) |
Preliminary answers to some questions in Document 8F/63, Annex 2 to Attachment 6
|
Germany (Federal Republic of)
|
2002-02-27 |
|
[ 87 ]
(Rev.1) |
Alignment of text in the guidelines in Document 8F/63 (Attachment 6, Annex 1)
|
Germany (Federal Republic of)
|
2002-02-27 |
|
[ 86 ]
(Rev.1) |
3GPP Radio Interface Specifications
|
Director, BR
|
2002-02-27 |
|
[ 85 ]
(Rev.1) |
Possible frequency arrangements in the spectrum identified by WARC-92 and WRC-2000 for IMT-2000 in 1 850-1 910 MHz / 1 930-1 990 MHz bands
|
Chile, Mexico, United States of America
|
2002-02-27 |
|
[ 84 ]
(Rev.1) |
Response to Questions for the development of frequency arrangements of IMT-2000 terrestrial and satellite components
|
Korea (Republic of)
|
2002-02-27 |
|
[ 83 ]
(Rev.1) |
Possible frequency arrangements in the spectrum identified by WARC-92 and WRC-2000 for IMT-2000 in the 824-849 MHz / 869-894 MHz bands
|
Brazil (Federative Republic of), Chile, Colombia (Republic of), Guatemala (Republic of), Mexico, United States of America, Venezuela (Republic of)
|
2002-02-27 |
|
[ 82 ]
(Rev.1) |
Revision of the IMT-2000 satellite radio interface C (SAT-CDMA) radio key characteristics
|
Korea (Republic of)
|
2002-02-27 |
|
[ 81 ]
(Rev.1) |
Liaison response from CWTS on the updating of RSPC
|
China (People's Republic of)
|
2002-02-27 |
|
[ 80 ]
(Rev.1) |
TDD and FDD interference scenario
|
L.M. Ericsson
|
2002-02-27 |
|
[ 79 ]
(Rev.1) |
Duplex gap with regard to additional spectrum for IMT
|
L.M. Ericsson
|
2002-02-27 |
|
[ 78 ]
(Rev.1) |
Reply to Liaison statement from ITU-R Working Party 8F
|
ITU-D SG 2
|
2002-02-27 |
|
[ 77 ]
(Rev.1) |
Liaison statement to WP 8F - Coordination thresholds between non-GSO BSS (sound) and mobile services (IMT-2000) in the frequency band 2 630-2 655 MHz (Item 1.34 of the WRC-03 Agenda)
|
WP 6S
|
2002-02-27 |
|
[ 76 ]
(Rev.1) |
ITU-T Liaison Rapporteur
|
ITU-T Liaison Rapporteur
|
2002-02-27 |
Results:725 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):