International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5A  C 

ITU-R WP5A

Land mobile service above 30 MHz (excluding IMT); wireless access in the fixed service; amateur and amateur-satellite service

Results:795 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 220 ]  
 
Preliminary draft new Question ITU-R [AM-TEMP OP] - Amateur service temporary operation in other countries     International Amateur Radio Union (IARU)     2009-04-08
[ 219 ]  
 
ITU-R Study Group 6 Question to be brought to the attention of Study Group 5     BR Study Group Department     2009-04-06
[ 218 ]  
 
Report of the Correspondence Group activity on cognitive radio systems     Convenor, WP 5A CG on CRS     2009-04-03
[ 217 ]  
 
Information on activities and output documents of ITU-T Focus Group ICTs & CC     Chairman ITU-T FG ICTs & CC     2009-04-02
[ 216 ]  
 
Outdated references in the ITU-R Recommendations dealing with maritime and radiodetermination issues     Director, BR     2009-04-01
[ 215 ]  
 
Reply to liaison statement on performance and availability requirements and objectives for wireless access systems     ITU-T SG 12     2009-03-27
[ 214 ]  
 
Response to liaison statement from Working Party 5A on invitation for contributions on the proposed draft new Report ITU-R M.[LMS.PPDR/UHF.TECH]     IEEE     2009-03-24
[ 213 ]  
 
Draft revision of Recommendation ITU-R M.1801     IEEE   238-1/5   2009-03-24
[ 212 ]  
 
Response to liaison statement from Working Party 5A on BWA characteristics for use in compatibility studies with fixed-satellite service systems in the 3 400-4 200 MHz band     IEEE     2009-03-24
[ 211 ]  
 
Revision of Recommendation ITU-R M.1450-3     IEEE   238/5, 212/5   2009-03-21
[ 210 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties     Chairman, CCV     2009-03-20
[ 209 ]  
 
Liaison statement to ITU-R Study Group 3 and Working Parties 4A, 4C, 5A, 5B, 6A, 7C, 7D (copy to WPs 5C, 5D, 6C and 7B for information) on the study of software-defined radio and cognitive radio systems     WP 1B     2009-03-19
[ 208 ]  
 
Reply liaison statement - The study of mobile access systems providing radiocommunications to a large number of ubiquitous sensors and/or actuators scattered over wide areas     WP 1B     2009-03-18
[ 207 ]  
 
Liaison statement - Progress on WRC-11 Agenda item 1.11 - Sharing between the space research service (Earth-to-space) and the inter-satellite, fixed and mobile services in the band 22.55-23.15 GHz     WP 7B     2009-03-18
[ 206 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, 6A, 7C and 7D on WRC-11 Agenda item 1.22     WP 1A     2009-03-17
[ 205 ]  
 
Liaison statement to Working Parties 5A and 5B - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz     WP 1A     2009-03-17
[ 204 ]  
 
Liaison statement to Working Parties 4A and 5C (copy to Working Party 5A for information) - Draft CPM text on WRC-11 Agenda item 1.12     WP 7B     2009-03-17
[ 203 ]  
 
Liaison statement (copy to Working Parties 3M, 5A and 5C for information) - Study of in-band sharing and adjacent band protection of HIBLEO-2 type non-GSO-to-non-GSO inter-satellite links from the emissions of SRS earth stations in the 23 GHz band     WP 7B     2009-03-17
[ 202 ]  
 
Liaison statement (copy to Working Parties 5A and 5B for information) - Draft CPM text on WRC-11 Agenda item 1.24     WP 7B     2009-03-17
[ 201 ]  
 
Result of the Study Group 5 meeting in relation to Document 5/114 proposing the texts for scopes of certain Recommendations     Chairman, SG 5     2009-03-11
[ 200 ]  
 
ITU-R Study Group 7 Recommendation to be brought to the attention of Study Group 5     BR Study Group Department     2009-03-10
[ 199 ]  
 
Liaison statement to Working Party 5B (Copy to Working Parties 5A and 6A for information) - IMT parameters in the 790-862 MHz frequency band     WP 5D     2009-03-10
[ 198 ]  
 
Liaison statement to WP 4A (copy to WP 5A) - Methodologies for determining whether an IMT station could transmit in the band 3 400-3 600 MHz without exceeding the PFD limits in Nos. 5.430A, 5.432A, 5.432B and 5.433A of the Radio Regulations     WP 5D     2009-03-10
[ 197 ]  
 
Liaison statement to Working Party 5A - Update of Report ITU-R M.2039     WP 5D     2009-03-10
[ 196 ]  
 
Liaison statement to Working Parties 5A and 5C - Copy to Working Party 5B for information - Use of Recommendation ITU-R F.1336-2 for the 790 862 MHz band     WP 5D     2009-03-10
[ 195 ]  
 
Liaison statement to ITU-T Study Group 15 on Access Network Transport Standards (copy for information to ITU-R Working Party 5A)     WP 5D     2009-02-25
[ 194 ]  
 
Liaison statement - Establishment of Focus Group on Future Networks (FG-FN)     ITU-T SG 13     2009-02-16
[ 193 ]  
 
Reply liaison statement to ITU-R Working Party 5A on performance and availability requirements and objectives for wireless access systems     ITU-T SG 16     2009-02-17
[ 192 ]  
 
Results of the meetings of the CVC and the RAG     Chairman, SG 5     2009-02-06
[ 191 ]  
 
Establishment of Focus Group on Future Networks (FG-FN)     Chairman, ITU-T SG 13     2009-02-02
[ 190 ]  
 
Liaison statement to ITU-R on applying IMS and IMT in Developing Country mobile telecom networks     ITU-T SG 13     2009-02-02
[ 189 ]  
 
Further information for the preparation of the draft CPM Report to WRC-11     Chairman, CPM-11     2009-01-27
[ 188 ]  
(Rev.1) 
Revision of Recommendation ITU-R M.1801     IEEE   238-1/5   2009-01-16
[ 187 ]  
 
Liaison statement on draft new Recommendation L.wsn - Monitoring systems using wireless sensor networks (WSN) for outside plant facilities     ITU-T Study Group 15   17/15   2008-12-22
[ 186 ]  
 
Liaison statement - Draft Recommendation G.hntreq     ITU-T SG 15     2008-12-18
[ 185 ]  
 
Liaison statement - New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan     ITU-T SG 15     2008-12-18
[ 184 ]  
 
Reply to Liaison statement on ANTS and draft Recommendation M.[WAS.QOS] (TD 7, TD 53 and TD 101) (to Working Party 5A for information only)     ITU-T COM 15-LS 3     2008-12-18
[ 183 ]  
 
Liaison statement to Working Parties 5A, 7D and 6A (copy to Working Parties 5C and 7B for information) on studies related to WRC-11 Agenda item 1.15     WP 5B     2008-12-03
[ 182 ]  
 
Note from the Chairman of Joint Task Group 5-6 - Sharing studies under Resolution 749 (WRC-07) and Resolution 224 (Rev. WRC-07)     Chairman, SG 5     2008-11-28
[ 181 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 6A, 6C, 7B and 7D for information) - Progress on the working document towards a preliminary draft new Recommendation ITU-R BT.[ENGUSER]     WP 6B     2008-11-21
[ 180 ]  
 
Reply liaison statement to Working Party 5A, copies to Working Parties 5C, 6A on studies realted to WRC-11 Agenda item 1.23     WP 5B     2008-11-17
[ 179 ]  
 
Liaison statement to Working Party 7B (copy to Working Parties 5A, 5C and 6A) - Compatibility studies between radiolocation and space research service     WP 5B     2008-11-17
[ 178 ]  
 
Liaison statement to Working Party 6A (copies to Working Party 5A, Working Party 5C, Working Party 7B and Working Party 7D for information) - Consider possible allocations in the frequency range 3-50 MHz to the radiolocation service for oceanographic radar applications     WP 5B     2008-11-17
[ 177 ]  
 
Liaison statement to ITU-R Working Parties 5A and 5C (copy to Working Parties 6A and 7B) - Initial considerations on compatibility between proposed new systems in the radiolocation service in bands 138-144 MHz and 154-156 MHz and other services operating in these bands     WP 5B     2008-11-17
[ 176 ]  
 
Liaison statement to Working Party 6A (copy to Working Parties 5A and 5C) - On a primary allocation to the radiolocation service in the portion of the band 30-300 MHz     WP 5B     2008-11-17
[ 175 ]  
 
Liaison statement to Working Parties 5A and 5D - Revision of Recommendations ITU-R F.758 and ITU-R F.1336     WP 5C     2008-11-13
[ 174 ]  
 
Liaison statement to Working Party 5A on preliminary draft new Report ITU-R F.[CROSS-BORDER] - Guidance to administrations wishing to reach an agreement on compatibility within the fixed service and sharing between stations of fixed service with stations of other terrestrial services operating in the neighbouring countries     WP 5C     2008-11-13
[ 173 ]  
 
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 7B and 7C - Gateway links for high altitude platform stations in the range from 5 850 to 7 075 MHz     WP 5C     2008-11-13
[ 172 ]  
 
Liaison statement to ITU-R Working Party 4C (copy to Working Party 5A for information) - WRC-11 Agenda item 1.18     WP 5C     2008-11-12
[ 171 ]  
 
Liaison statement to Working Party 5B (copy to Working Party 5A for information) - Compatibility studies between radiolocation and fixed service in the band 30-300 MHz (WRC-11 Agenda item 1.14)     WP 5C     2008-11-12
Results:795 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2020-12-17