Contribuciones  |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 296 ]
|
Proposed updates to Annex 4 to Working Party 4A Chair's Report - Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)
|
Canada
|
AI1.2
|
2024-10-08 |
|
[ 295 ]
|
Proposal to submit a note to the Director of the Radiocommunication Bureau with respect to the application of the rule of procedures under RR Nos. 9.27 and 11.43B in case of modification of a frequency assignment to a non-GSO system
|
Tonga
|
|
2024-10-09 |
|
[ 294 ]
|
Reply liaison statement to Working Parties 7C and 7D on WRC-27 agenda item 1.18
|
Tonga
|
AI1.18
|
2024-10-09 |
|
[ 293 ]
|
Comments on revision to Recommendation ITU-R S.1503 and associated studies on RR Article 22 epfd limits
|
India
|
|
2024-10-09 |
|
[ 292 ]
|
Proposed topic under WRC-27 agenda item 7 - New Appendix 4 data items for geostationary (GSO) satellite networks in the fixed-satellite service (FSS) or broadcasting-satellite service (BSS) in Ka, V, Q bands and above, not subject to a plan
|
African Telecommunications Union
|
AI7
|
2024-10-09 |
|
[ 291 ]
|
Proposed topic under WRC-27 agenda item 7 - Exclusion of the territory of a country from the service area of a geostationary satellite network (GSO) in the fixed-satellite service (FSS) or mobile-satellite service (MSS) in a frequency band not subject to a plan
|
African Telecommunications Union
|
AI7
|
2024-10-09 |
|
[ 290 ]
|
WRC-27 agenda item 1.6
|
African Telecommunications Union
|
AI1.6
|
2024-10-09 |
|
[ 289 ]
|
Studies for inclusion in the working document on WRC-27 agenda item 1.2 - Update to working document on WRC-27 agenda item 1.2
|
Papua New Guinea
,
India
,
Indonesia
,
Thailand
|
AI1.2
|
2024-10-09 |
|
[ 288 ]
|
Reply liaison statement to Working Party 5B (copy to Working Parties 3M, 5A, 5C, 7A, 7B and 7C)
|
Papua New Guinea
|
AI1.2
|
2024-10-09 |
|
[ 287 ]
|
Proposal to the working document towards a preliminary draft new Report ITU-R S.[MITIGATION MEASURES]
|
Papua New Guinea
|
|
2024-10-09 |
|
[ 286 ]
|
Proposals regarding the preliminary draft table of contents of the Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services
|
International Organization of Space Communications - INTERSPUTNIK
|
|
2024-10-08 |
|
[ 285 ]
|
Proposals regarding the draft table of contents of the Handbook on Satellite Communications
|
International Organization of Space Communications - INTERSPUTNIK
|
|
2024-10-08 |
|
[ 284 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO-NGSO] - Methodology to assess average degradation in throughput and increase in unavailability for a non-geostationary system, due to the interference caused by another non-geostationary system operating co-frequency[, for frequency ranges between 10.7 GHz and 52.4 GHz]
|
United States
|
|
2024-10-09 |
|
[ 283 ]
|
Proposed revisions to working document towards a preliminary draft new Report ITU-R S.[INTERFERENCE-NGSO-NGSO/GSO-STUDIES] and working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELING]
|
United States
|
|
2024-10-09 |
|
[ 282 ]
|
Working document towards a preliminary draft new Report ITU-R [ARTICLE 22 EPFD LIMIT STUDIES]
|
United States
|
|
2024-10-09 |
|
[ 281 ]
|
Elements of working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)
|
United States
|
AI1.3
|
2024-10-09 |
|
[ 280 ]
|
Proposed draft CPM text for WRC-27 agenda item 1.3
|
Egypt
|
AI1.3
|
2024-10-09 |
|
[ 279 ]
|
Proposed draft CPM text for WRC-27 agenda item 1.2
|
Egypt
|
AI1.2
|
2024-10-09 |
|
[ 278 ]
|
Proposed modifications to the elements on a working document related to the operation and functionalities of NCMC for ESIMs
|
Egypt
|
|
2024-10-09 |
|
[ 277 ]
|
Proposed modifications to the working document regarding WRC-27 agenda item 1.1
|
Egypt
|
AI1.1
|
2024-10-09 |
|
[ 276 ]
|
Proposed modifications to the working document regarding WRC-27 agenda item 1.3
|
Egypt
|
AI1.3
|
2024-10-09 |
|
[ 275 ]
|
Elements towards a working document on WRC-27 agenda item 1.5
|
Egypt
|
AI1.5
|
2024-10-09 |
|
[ 274 ]
|
Proposal regarding consideration of possible topic on repeated suspension and bringing back into use of frequency assignments under WRC-27 agenda item 7
|
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
|
AI7
|
2024-10-09 |
|
[ 273 ]
|
Inapplicability of the Resolution 770 (Rev.WRC-23) methodology for ESIMs
|
Viasat, Inc.
|
AI1.1
|
2024-10-08 |
|
[ 272 ]
|
Study on Recommendation ITU-R S.1428 antenna pattern for non-GSO epfd calculation
|
Viasat, Inc.
|
|
2024-10-09 |
|
[ 271 ]
|
Optimisation of non-GSO systems under existing epfd limits
|
Viasat, Inc.
|
|
2024-10-09 |
|
[ 270 ]
|
Long term interference from non-GSO systems into Ka-band geostationary networks based on proposed use of average throughput degradation criteria
|
Viasat, Inc.
|
|
2024-10-08 |
|
[ 269 ]
|
Technical comments on Resolution 770 (Rev.WRC-23) methodology for protection of GSO networks from non-GSO interference
|
Viasat, Inc.
|
AI1.3, AI1.1
|
2024-10-08 |
|
[ 268 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELING] - Modelling and simulation of non-GSO FSS systems for use in sharing and compatibility studies
|
Viasat, Inc.
|
|
2024-10-08 |
|
[ 267 ]
|
Amendments to information document in response to WRC-23 minutes on RR Article 22 epfd studies without any regulatory consequences
|
Viasat, Inc.
|
|
2024-10-08 |
|
[ 266 ]
|
Comments on working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO-NGSO]
|
Viasat, Inc.
|
|
2024-10-08 |
|
[ 265 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[AGGREGATE EPFD KA KU] - Methodology for evaluating aggregate equivalent power flux-density into geostationary satellite networks in the fixed-satellite service from multiple non-geostationary satellite systems in the Ku and Ka frequency bands
|
Viasat, Inc
|
|
2024-10-08 |
|
[ 264 ]
|
Proposed updates to elements of working document on WRC-27 agenda item 1.4
|
SES
|
AI1.4
|
2024-10-09 |
|
[ 263 ]
|
Working document on mitigation measures between IMT and FSS in the frequency band 3 400-3 600 MHz
|
GSM Association
|
|
2024-10-09 |
|
[ 262 ]
|
Proposed elements towards the working document on Radio Regulations Article 22 epfd limits
|
Burundi
,
Cameroon
,
Central African Rep.
,
Chad
,
Congo (Rep. of the)
,
Dem. Rep. of the Congo
,
Equatorial Guinea
,
Gabon
,
Sao Tome and Principe
|
|
2024-10-08 |
|
[ 261 ]
|
Proposed preliminary values for ESIMs parameters to be considered and used for studies under WRC-27 agenda item 1.1
|
Luxembourg
|
AI1.1
|
2024-10-08 |
|
[ 260 ]
|
Impact of distribution chosen on the algorithm for the update of Recommendation ITU-R S.1428
|
Luxembourg
|
|
2024-10-08 |
|
[ 259 ]
|
Elements on Ku GSO networks protection
|
Luxembourg
|
|
2024-10-08 |
|
[ 258 ]
|
Epfd derivation by JTG 4-9-11
|
Luxembourg
|
|
2024-10-08 |
|
[ 257 ]
|
Evolution of GSO networks operations in Ku band
|
Luxembourg
|
|
2024-10-08 |
|
[ 256 ]
|
Topic to be considered under WRC-27 agenda item 7 - Possible measures to restrain the use of the same satellite or different satellites to repeatedly bring into use and bring back into use the same frequency assignments of a satellite network or system for a short period of time
|
Saudi Arabia
,
Egypt
|
AI7
|
2024-10-08 |
|
[ 255 ]
|
Elements regarding the service area towards a working document on WRC-27 agenda item 1.5
|
Saudi Arabia
|
AI1.5
|
2024-10-08 |
|
[ 254 ]
|
Information on evolution of GSO characteristics in 17.8-20.2 GHz and 27.5-30 GHz frequency band and impact of non-GSO interference on GSO networks with ACM - relevant technical information for consideration to the study on epfd limits in RR Article 22
|
Indonesia
|
|
2024-10-08 |
|
[ 253 ]
|
Proposed revisions to Annex 16 on the fifty-four meeting Working Party 4A of the Chair's Report
|
Indonesia
|
|
2024-10-08 |
|
[ 252 ]
|
Preliminary views within WRC-27 agenda item 1.5
|
Indonesia
|
AI1.5
|
2024-10-08 |
|
[ 251 ]
|
GSO FSS/BSS reference links used in ITU-R studies in 1995-2000 to derive the existing RR Article 22 epfd limits
|
Director, BR
|
|
2024-10-09 |
|
[ 250 ]
|
Analysis of space frequency assignments recorded under RR No. 11.41
|
Director, BR
|
|
2024-10-09 |
|
[ 249 ]
|
Reply liaison statement to Working Party 4A (copied for information to Study Groups 4, 5 and 7) - Activities in response to Resolution 219 (Bucharest, 2022) and Resolution ITU-R 74 (RA-23)
|
WP 7B
|
|
2024-10-09 |
|
[ 248 ]
|
Liaison statement to Working Party 4A regarding WRC-27 agenda item 1.6
|
WP 7B
|
AI1.6
|
2024-10-09 |
|
[ 247 ]
|
Resolution ITU-R 74 (space sustainability) - Brazilian Law on National Space Activities and proposal related to reducing information asymmetries on spectrum and orbital resources occupancy under Resolution ITU-R 74 Handbook
|
Brazil
|
|
2024-10-08 |
Resultados :846 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17
- Siguiente

|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):