Contributions
[ AI/Question: Q9/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 439 ]
|
Text proposal for clause 8/G.798.1
|
Huawei Technologies
|
Q9/15
|
2009-09-16 |
|
[ 438 ]
|
Proposal to specify OCh/OTUkV_A with OTUk_CP
|
Huawei Technologies
|
Q9/15, Q11/15
|
2009-09-16 |
|
[ 437 ]
|
Multi-vendor demarcation in the OTN
|
Huawei Technologies
|
Q9/15, Q11/15
|
2009-09-16 |
|
[ 436 ]
|
LO and HO ODU view points and NNIs
|
Huawei Technologies
|
Q9/15, Q11/15
|
2009-09-16 |
|
[ 434 ]
|
First models of OTN equipment proposal
|
Huawei Technologies
|
Q9/15
|
2009-09-16 |
|
[ 429 ]
|
G.8032 (Comments on Draft)
|
Nortel Networks (Canada)
|
Q9/15
|
2009-09-16 |
|
[ 427 ]
|
G.8032 (Access Protection)
|
Nortel Networks (Canada)
|
Q9/15
|
2009-09-16 |
|
[ 422 ]
|
Configuration principle of interconnected rings in G.8032v2
|
NEC Corporation
|
Q9/15
|
2009-09-15 |
|
[ 421 ]
|
Considerations of guard timer in G.8032v2
|
NEC Corporation
|
Q9/15
|
2009-09-15 |
|
[ 420 ]
|
Considerations of FS state in G.8032v2
|
NEC Corporation
|
Q9/15
|
2009-09-15 |
|
[ 419 ]
|
Considerations of initial state in G.8032v2
|
NEC Corporation
|
Q9/15
|
2009-09-15 |
|
[ 418 ]
|
Proposed text for equal priority requests in G.8031
|
NEC Corporation
|
Q9/15
|
2009-09-15 |
|
[ 417 ]
|
Proposed modification for loss measurement process in G.8021
|
NEC Corporation
|
Q9/15
|
2009-09-15 |
|
[ 412 ]
(Rev.1) |
Latency Measurements in the Optical Transport Network Using G.709 Overhead
|
Verizon
,
AT&T
,
BT
,
Nokia Siemens Networks
|
Q9/15, Q11/15
|
2009-09-15 |
|
[ 406 ]
|
BIP-8 handling in adaptation of 40GBASE-R into OPU3 and 100GBASE-R into OPU4
|
Alcatel-Lucent
|
Q9/15, Q11/15
|
2009-09-15 |
|
[ 405 ]
|
Adaptation of STM-256 over multichannel parallel interfaces
|
Alcatel-Lucent
,
Cisco
,
Finisar
,
Juniper
|
Q9/15, Q11/15
|
2009-09-15 |
|
[ 399 ]
|
CSF Indication for Y.1731 (Ethernet OAM)
|
Alcatel-Lucent
|
Q9/15, Q10/15
|
2009-09-15 |
|
[ 382 ]
|
Automatic control of the ODUkT TCM control function
|
Alcatel-Lucent
|
Q9/15
|
2009-09-14 |
|
[ 380 ]
|
G.8032 Timers Description
|
Nokia Siemens
|
Q9/15
|
2009-09-10 |
|
[ 379 ]
|
Methods for Measuring Multipoint Services Availability
|
Cisco Ciena; China Telecom
,
AT&T
,
Broadcom Corporation
,
Ciena Corporation
,
Verizon
|
Q9/15, Q10/15
|
2009-09-10 |
|
[ 370 ]
|
Frame loss measures for multi-point EVCs
|
Cisco systems, Inc.
|
Q9/15, Q10/15
|
2009-09-09 |
|
[ 338 ]
|
G.8032 SF and FS
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-28 |
|
[ 335 ]
|
Signal Degrade (SD) triggered protection switching
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 334 ]
|
Proposal on the link recovery in case of multiple failures in G.8032
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 333 ]
|
Proposal on the ring node initialization in G.8032
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 332 ]
|
Proposal on flush optimization support in G.8032
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 331 ]
|
Proposal on non-revertive mode in G.80323
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-26 |
|
[ 307 ]
|
G.8032 Flushing
|
Alcatel-Lucent
|
Q9/15
|
2008-11-25 |
|
[ 306 ]
|
G.8032 WTR and WTB comments
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-25 |
|
[ 305 ]
|
G.8032 Statemachine
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-25 |
|
[ 304 ]
|
G.8032 Priority Logic and Statemachine
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-25 |
|
[ 303 ]
|
G.8032 Hidden Transitions
|
Alcatel-Lucent, AimValley BV
|
Q9/15
|
2008-11-25 |
|
[ 294 ]
|
Includes pending state to support flushing FDB in non_revertive mechanism (G.8032)
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 293 ]
|
Flushing behaviour in interconnected ring protection (G.8032)
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 292 ]
|
FDB Flush Problem in non_revertive operation
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 291 ]
|
Difference between sub-ring and single ring protection (G.8032)
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 290 ]
|
Comparison between shared-link and sub-ring models (G.8032)
|
ZTE Corporation, China
|
Q9/15
|
2008-11-23 |
|
[ 279 ]
|
G.8032 protection switching transient traffic performance requirement for next study period
|
ETRI (Republic of Korea)
|
Q9/15
|
2008-11-23 |
|
[ 278 ]
|
FDB-delete scheme for fast protection switching in G.8032 Ethernet ring protection
|
ETRI (Korea, Republic of)
|
Q9/15
|
2008-11-23 |
|
[ 272 ]
|
Naming Considerations regarding T-MPLS and MPLS-TP within ITU-T
|
Alcatel-Lucent Italia, Alcatel Shanghai Bell, Ital
|
Q9/15, Q3/15, Q11/15
|
2008-11-23 |
|
[ 260 ]
|
Proposal to specify Failure of Protocol defects for the R-APS protocol
|
Lucent Technologies, Inc - AimValley BV
|
Q9/15
|
2008-11-21 |
|
[ 249 ]
|
Corrigendum for G.709 correcting small mistake and inconsistency with G.798
|
Alcatel Lucent Germany
|
Q9/15, Q11/15
|
2008-11-21 |
|
[ 233 ]
|
Text proposal for clause 9.1.4/G.8021 ETH Split Horizon Flow Forwarding Function
|
Huawei Technologies Co., Ltd.
|
Q9/15
|
2008-11-21 |
|
[ 226 ]
|
Signal quality supervision functionality added into OCh and OMS layer (G.798)
|
MII China
|
Q9/15
|
2008-11-21 |
|
[ 217 ]
|
A couple of correction proposals to G.798
|
MII, China
|
Q9/15
|
2008-11-21 |
|
[ 216 ]
|
Proposal of various modifications to G.8032 version 2
|
Lucent Technologies, Inc
|
Q9/15
|
2008-11-21 |
|
[ 180 ]
|
Proposed text for G.supxx "Client services Sub ODU1 mapping into OTN using HO-VC mapping"
|
Alcatel-Lucent
|
Q9/15
|
2008-11-21 |
|
[ 171 ]
|
Comments on draft Recommendation G.8032 Version 2
|
ETRI
|
Q9/15
|
2008-11-21 |
|
[ 162 ]
|
Comments on the current text of G.808.2 and G.808.1
|
Hitachi
|
Q9/15
|
2008-11-21 |
|
[ 161 ]
|
Comments on RPL location in shared link case in G.8032v2
|
Hitachi
|
Q9/15
|
2008-11-21 |
Results:578 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):