International Telecommunication Union   ITU
Franįais  Espaņol
 
Site map Contact Us Print version
  Home : ITU-R : JTG4567-AR : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R JTG4567-AR  C 

ITU-R JTG4567-AR

Joint Task Group 4-5-6-7

Results:611 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source Date
[ 111 ]  
 
Updates of compilation of material maintained by the Joint Task Group 4-5-6-7 Working Group     Korea (Republic of)   2013-07-12
[ 110 ]  
 
Proposed draft CPM text for WRC-15 agenda item 1.1     Korea (Republic of)   2013-07-12
[ 109 ]  
 
Allocationn and use of bands by the radio astronomy service in the frequency range 470 MHz - 6 GHz     IUCAF , CRAF   2013-07-12
[ 108 ]  
 
Remarks on the wave propagation model for the studies in ITU-R Joint Task Group 4-5-6-7     European Broadcasting Union   2013-07-12
[ 107 ]  
 
Principles of broadcast planning to be considered in sharing studies     European Broadcasting Union   2013-07-12
[ 106 ]  
 
Assessment of IMT user equipment interference into broadcast receivers by means of Monte Carlo simulations     European Broadcasting Union   2013-07-12
[ 105 ]  
 
Sharing and coexistence study between IMT systems networks and FSS space stations in the 5925-6425 MHz band     Russian Federation   2013-07-11
[ 104 ]  
 
Feasibility assessment for accommodation of mobile broadband long term evolution (LTE) systems in the 2 025-2 110 MHz band     United States of America   2013-07-12
[ 103 ]  
 
Preliminary compatibility study between mobile broadband systems (including IMT) and fixed satellite service receive earth stations operating in the 3 400-4 200 MHz     United States of America   2013-07-12
[ 102 ]  
 
Proposed revisions to working document towards preliminary draft CPM text for WRC-15 Agenda item 1.1     United States of America   2013-07-12
[ 101 ]  
 
Working document towards a preliminary draft new Report ITU-R M.[5350MHzEESS] - Compatibility studies between Radio Local Area Network (RLAN) systems and EESS (active) Synthetic Aperture Radar (SAR) systems in the 5 350-5 470 MHz band     United States of America   2013-07-12
[ 100 ]  
 
Working document towards a preliminary draft new Report ITU-R M.[5350MHzAERO] - Compatibility studies between Radio Local Area Network (RLAN) systems and aeronautical airborne radar systems in the 5 350-5 460 MHz band     United States of America   2013-07-12
[ 99 ]  
 
Feasibility assessment for accomodation of mobile broadband long term evolution (LTE) systems in the 2 200-2 290 MHz band     United States of America   2013-07-12
[ 98 ]  
 
Sharing studies between mobile broadband applications in the mobile service to protect earth stations of the meteorological-satellite service operating in and adjacent to the 1 695 ? 1 710 MHz band     United States of America   2013-07-12
[ 97 ]  
 
Information paper on 5 GHz sharing issues     United States of America   2013-07-12
[ 96 ]  
 
Proposal for modification of attachment 4 of "working document on sharing and compatibility studies under agenda item 1.2" (Annex 5 to document 4-5-6-7/113)     Rai Way S.p.A.   2013-07-11
[ 95 ]  
 
Sharing study on the effects of international mobile telecommunications-advanced systems on the C-band earth stations     North American Broadcasters Association (NABA)   2013-07-10
[ 94 ]  
 
Proposals for the development of CPM Text under WRC-15 Agenda item 1.1     Russian Federation   2013-07-11
[ 93 ]  
 
Possible approaches to define methods to satisfy WRC-15 Agenda item 1.1     Russian Federation   2013-07-11
[ 92 ]  
 
Proposals for modification of working document towards preliminary draft CPM Text for WRC-15 Agenda item 1.2     Russian Federation   2013-07-11
[ 91 ]  
 
Proposals on modification of working document towards preliminary draft new Report ITU-R M.[ARNS-MS]     Russian Federation   2013-07-11
[ 90 ]  
 
Ananlysis of possible operation of IMT systems in the frequency band 2700-3100 MHz     Russian Federation   2013-07-11
[ 89 ]  
 
Compatibility studies of IMT systems with aeronautical telemetry systems in the frequency band 1429-1535 MHz     Russian Federation   2013-07-11
[ 88 ]  
 
Compatibility studies of IMT systems with radiolocation systems in the frequency band 1300-1400 MHz     Russian Federation   2013-07-11
[ 87 ]  
 
Studies on frequency related matters for international mobile telecommunications and other terrestrial mobile broadband applications - Technical and regulatory framework in Australia to protect digital terrestrial television broadcasting below 694 MHz     Australia   2013-07-10
[ 86 ]  
 
Information on the usage of the 690 to 790 MHz band by SAB/SAP - Results of measurements during a number of rcent major events in Germany     Germany (Federal Republic of)   2013-07-09
[ 85 ]  
 
APT views on WRC-15 Agenda item 1.1     Asia-Pacific Telecommunity   2013-07-09
[ 84 ]  
 
Work on Agenda item 1.2     ECOWAS Administrations , Cameroon (Republic of)   2013-07-05
[ 83 ]  
 
WRC-15 Agenda item 1.1 - Elements of sharing and compatibility studies between the broadcasting service and the mobile service     C.B.S., Inc.   2013-07-07
[ 82 ]  
 
WRC-15 Agenda item 1.1 - Technical and operational characteristics of terrestrial television broadcasting for sharing and compatibility studies under WRC-15 Agenda item 1.1     C.B.S., Inc.   2013-07-07
[ 81 ]  
 
Comment on Working Party 5D liaison statement to Joint Task Group 4-5-6-7 July meeting regarding suitable candidate bands under 1.1     ECOWAS Administrations , Cameroon (Republic of)   2013-07-03
[ 80 ]  
 
Technical Parameters of DTTB Systems C (ISDB-T) for sharing and compatibility studies between the broadcasting service and the mobile service under WRC-15 Agenda items 1.1 and 1.2     Japan   2013-07-02
[ 79 ]  
 
Considerations on compatibility between services in the 1 400-1 427 MHz band and IMT systems in the 1 427.9-1 462.9 MHz and 1 475.9-1 510.9 MHz bands under WRC-15 Agenda item 1.1     Japan   2013-07-02
[ 78 ]  
 
The result of sharing study between FSS and IMT-Advanced in the frequency band of 3400-3600 MHz considering geographical conditions     Japan   2013-07-02
[ 77 ]  
 
Considerations on 3 400-4 200MHz and 4 400-4 900MHz bands under WRC-15 Agenda item 1.1     Japan   2013-07-02
[ 76 ]  
 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, JTG 4-5-6-7 and the Special Commitee as responsible Groups for WRC-15 Agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)     World meteorological Organization   2013-03-06
[ 75 ]  
 
Liaison statement to ITU-R Working Parties 5A, 5B, 5D and Joint Task Group 4-5-6-7 - WRC-15, Agenda item 1.1 - IMO's concerns in relation to the wide range of frequency bands identified by ITU-R for future assessment of the suitability for IMT     International Maritime Organisation   2013-02-28
[ 74 ]  
 
UK strategy for UHF spectrum use:an update     United Kingdom of Great Britain and Northern Ireland   2013-02-07
[ 73 ]  
 
WRC-15 Agenda items 1.1 and 1.2 - Technical and operational characteristics as well as protection criteria for the terrestrial component of IMT systems for studies under WRC-15 Agenda items 1.1 and 1.2     Free TV Australia Ltd.   2013-02-01
[ 72 ]  
 
Suitable frequency ranges for IMT in the context of WRC-15 Agenda item 1.1     South Africa (Republic of) , Zimbabwe (Republic of)   2012-11-14
[ 71 ]  
 
Meeting the demand for wireless broadband: Providing access to the 470-698 MHz frequency band     United States of America   2012-11-14
[ 70 ]  
 
Proposed revisions to working document towards preliminary draft CPM text for WRC-15 Agenda item 1.1     United States of America   2012-11-14
[ 69 ]  
 
Elements for sharing studies     Norddeutscher Rundfunk (NDR) , Zweites Deutsches Fernsehen   2012-11-14
[ 68 ]  
 
Proposed modifications to Annex 6 to Joint Task Group 4-5-6-7 Chairman's Report - Elements for sharing and compatibility studies between the broadcasting and the mobile service under Agenda item 1.2     European Broadcasting Union (EBU)   2012-11-14
[ 67 ]  
 
Error estimation in the 'Main-interferer' assumption     European Broadcasting Union (EBU)   2012-11-14
[ 66 ]  
 
Possible future implementations of IMT in the 1 400 MHz range and required studies     TeliaSonera AB   2012-11-14
[ 65 ]  
 
Elements to be considered for sharing studies between MS and ARNS in relation Agenda item 1.2     TeliaSonera AB   2012-11-14
[ 64 ]  
 
Working document towards draft CPM text for WRC-15 Agenda item 1.2     Iran (Islamic Republic of)   2012-11-14
[ 63 ]  
 
Comments on the course of action undertook in first jtg meeting     Iran (Islamic Republic of)   2012-11-14
[ 62 ]  
 
Support for CBS, Inc., contribution JTG 4-5-6-7/66 - Guidelines for the assessment of interferenced into the broadcasting service     North American Broadcasters Association (NABA)   2012-11-14
Results:611 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright Š ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2020-12-17