Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 629 ]
|
ITU-T L.SE_DC "Smart energy solution for data centre and telecom centre": Proposal to add new chapter green energy solutions
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/5
|
2020-04-27 |
|
[ 628 ]
|
ITU-T L.SE_DC "Smart energy solution for data centre and telecom centre": Proposal to add new chapter Smart Controlling method of Environmental Condition solution
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/5
|
2020-04-27 |
|
[ 627 ]
|
ITU-T L.SE_DC "Smart energy solution for data centre and telecom centre": Proposal to add new chapter evaporative cooling solutions
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/5
|
2020-04-27 |
|
[ 626 ]
|
ITU-T L.SE_DC "Smart energy solution for data centre and telecom centre": Proposal to add new chapter Liquid cooling solutions
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/5
|
2020-04-27 |
|
[ 625 ]
|
Proposed new work item on "specifications of 10kV AC input and up to 400VDC output power system in data center and telecommunication room"
|
Ministry of Industry and Information Technology (MIIT), China; Alibaba (China) Co., Ltd.
|
Q6/5
|
2020-04-27 |
|
[ 624 ]
|
KSTR.EMF_assess on "The assessment of electromagnetic field on medical and beauty treatment devices": Proposal for case study
|
Korea (Rep. of)
|
Q3/5
|
2020-04-27 |
|
[ 623 ]
|
EMF strength measurements for the WPT system of electric vehicles and the measurement results
|
Korea (Rep. of)
|
Q3/5
|
2020-04-27 |
|
[ 622 ]
|
L.SE_DC on "Smart energy solution for data centre and telecom centre": Proposal for updating clause 6
|
Korea (Rep. of)
|
Q6/5
|
2020-04-27 |
|
[ 621 ]
(Rev.1) |
K.peak: Rationale of the expression of spatial averaging for evaluating real exposure level
|
Korea (Rep. of)
|
Q3/5
|
2020-04-27 |
|
[ 620 ]
|
Proposed updates to draft Recommendation L.SP_OB
Proposed updates to draft Recommendation L.SP_OB
|
Telecom Italia S.p.A. (Italy)
,
Huawei Technologies Co., Ltd. (China)
|
Q6/5
|
2020-04-26 |
|
[ 619 ]
(Rev.1) |
K.pim on ''Passive intermodulation test methods of array antenna systems in mobile communication systems''(Revised according to previous discussion)
|
China Mobile Communications Corporation
|
Q4/5
|
2020-04-26 |
|
[ 618 ]
|
L.5G_sav on "Energy saving technologies and best practices for 5G RAN equipment": Proposed the skeleton and 1st draft text.
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q6/5
|
2020-04-26 |
|
[ 617 ]
(Rev.1) |
1st draft of the new ITU-T Supplement K.SUP.5G.EMC "Impacts of Electromagnetic compatibility test methods for 5G AAS''
|
ZTE Corporation (China)
,
China Telecommunications Corporation
|
Q4/5
|
2020-04-26 |
|
[ 616 ]
(Rev.1) |
Proposal to revise ITU-T K.112, Lightning protection, earthing and bonding: Practical procedures for radio base stations
|
Huawei Technologies Co., Ltd. (China)
|
Q1/5
|
2020-04-26 |
|
[ 615 ]
(Rev.1) |
Proposal to revise ITU-T K.56, Protection of radio base stations against lightning discharges
|
Huawei Technologies Co., Ltd. (China)
|
Q1/5
|
2020-04-26 |
|
[ 614 ]
(Rev.1) |
Strategic approach to disposal of counterfeit mobile devices as a result of the installation of Central Equipment Identifier Register (CEIR).
|
Tanzania Communications Regulatory Authority (TCRA)
,
Uganda Communications Commission (UCC)
|
Q7/5
|
2020-04-25 |
|
[ 613 ]
(Rev.1) |
Contribution to the supplement giving guidance for organizations interested in complying with the new L.1470 Recommendation
|
Nokia Corporation (Finland)
|
Q9/5
|
2020-04-22 |
|
[ 612 ]
(Rev.1) |
Proposed Corrigendum 2 to Recommendation ITU-T K.98
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-04-20 |
|
[ 611 ]
(Rev.1) |
Update of the ITU-T Supplement 1 "Guide on electromagnetic fields and health"
|
Orange Polska S.A. (Poland)
|
Q3/5
|
2020-04-12 |
|
[ 610 ]
|
Baseline document for the Sustainable Management of Batteries L.SM_Batteries
|
Agence Ivoirienne de Gestion des Fréquences Radioélectriques (AIGF) (Côte d'Ivoire)
|
Q7/5
|
2020-04-08 |
|
[ 609 ]
|
Proposed Amendment 1 to Recommendation ITU-T K.50
|
Bourns Limited (United Kingdom)
|
Q2/5
|
2020-03-30 |
|
[ 608 ]
(Rev.1-2) |
Circular savings, including electronic waste
|
Autorité Nationale de Régulation des Technologies de l'Information et de la Communication (ANRTIC) (Comoros)
|
Q7/5
|
2020-02-28 |
|
[ 607 ]
|
Management of WEEE and remediation of negative impact of telecommunication infrastructure on public and private buildings
|
Ministère des Postes, des Télécommunications et de l'Economie Numérique (Guinea)
|
Q7/5
|
2020-02-04 |
|
[ 606 ]
(Rev.1) |
Suggested title for ITU-T SG5 during the new Study Period (2021-2024)
|
Ministry of Communications and Information Technology (MCIT) (Egypt)
|
QALL/5
|
2020-02-03 |
|
[ 605 ]
|
Changement climatique et évaluation des TIC dans le cadre des ODD
Changement climatique et évaluation des TIC dans le cadre des ODD
Changement climatique et évaluation des TIC dans le cadre des ODD
Changement climatique et évaluation des TIC dans le cadre des ODD
|
Ministère des Postes, Télécommunications et Nouvelles Technologies de l'Information et de la Communication (Dem. Rep. of the Congo)
|
Q9/5
|
2020-01-25 |
Resultats:75 documents Résultats :
Précédent -
1 -
2
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):