Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 193 ]
|
WRC-27agenda item 1.18 - Draft Revision of Tables 1 and 2 of the Annex to Resolution 739 (WRC-19) - (Copy to Working Party 7C for information)
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science (IUCAF)
|
AI1.18
|
2025-03-04 |
|
[ 192 ]
|
Proposed revisions to the working document towards a preliminary draft new Report ITU-R RS.[1.18 - EESS]
|
China
|
|
2025-03-04 |
|
[ 191 ]
|
Compatibility study between EESS (passive) in the 8 400-8 500 MHz band and terrestrial IMT systems in the adjacent band 7 125-8 400 MHz
|
China
|
|
2025-03-04 |
|
[ 190 ]
|
Proposed liaison statement to Working Parties 3J and 3M regarding WRC-27 agenda item 1.19
|
China
|
AI1.19
|
2025-03-04 |
|
[ 189 ]
|
Proposed preliminary draft revision to Report ITU-R RS.2456-1 - Space weather sensor systems using radio spectrum
|
China
|
|
2025-03-04 |
|
[ 188 ]
|
Working document towards a preliminary draft revision of Report ITU-R RS.2313-0 - Sharing analyses of wideband Earth exploration-satellite service (active) transmissions with stations in the radiodetermination service operating in the frequency bands 8 700-9 300 MHz and 9 900-10 500 MHz
|
China
|
|
2025-03-04 |
|
[ 187 ]
|
Interference analysis from radio altimeters to EESS (passive) in the 4.2-4.4 GHz frequency band
|
Russian Federation
|
AI1.19
|
2025-03-03 |
|
[ 186 ]
|
Consideration of element for protection criteria for SW sensors operating in frequency not listed in Resolution 682 (WRC-23)
|
Japan
|
|
2025-03-03 |
|
[ 185 ]
|
Proposed updates to draft CPM text for WRC-27 agenda item 1.17
|
Japan
|
AI1.17
|
2025-03-03 |
|
[ 184 ]
|
Proposed updates to working document towards a preliminary draft new Recommendation ITU-R RS.[RXSW_PROTECT_CRITERIA] - Protection criteria of receive-only space weather sensors in the meteorological aids service (space weather)
|
Japan
|
AI1.17
|
2025-03-03 |
|
[ 183 ]
|
Preliminary draft revision of Recommendation ITU-R RS.1166-5 - Performance and interference criteria for active spaceborne sensors
|
Australia
|
|
2025-03-03 |
|
[ 182 ]
|
Proposed modifications to Annex 8 to Working Party 7C Chair's Report - Element for protection criteria for space weather sensors operating on frequencies not listed in Resolution 682 (WRC-23)
|
Australia
|
|
2025-03-03 |
|
[ 181 ]
|
Working document towards preliminary draft revised Report ITU-R RS.2456-2 - Space weather sensor systems using radio spectrum
|
Switzerland
|
|
2025-02-28 |
|
[ 180 ]
|
Reply liaison statement to ITU-R Working Party 7B (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 7B answers to questions related to WRC-27 agenda item 1.15
|
WP 3J
|
AI1.15
|
2025-02-25 |
|
[ 179 ]
|
Reply liaison statement to Working Party 7C - WRC-27 agenda item 1.7
|
WP 5D
|
AI1.7
|
2025-02-20 |
|
[ 178 ]
|
Additional information on the preparation of texts for the draft CPM Report to WRC-27
|
Director, BR
|
|
2025-01-30 |
|
[ 177 ]
|
Reply liaison statement to Working Party 7C - Relevant technical information to support studies under WRC-27 agenda item 1.18 and update on supporting materials
|
WP 5C
|
AI1.18
|
2024-12-13 |
|
[ 176 ]
|
Reply liaison statement to Working Party 7C - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.17
|
WP 5C
|
AI1.17
|
2024-12-13 |
|
[ 175 ]
|
Reply liaison statement to Working Party 7C - Relevant technical information to support studies under WRC-27 agenda item 1.19
|
WP 5A
|
AI1.19
|
2024-12-12 |
|
[ 174 ]
|
Liaison statement to Working Party 7C - Relevant technical information to support studies under WRC-27 agenda item 1.17
|
WP 5A
|
AI1.17
|
2024-12-12 |
|
[ 173 ]
|
Liaison statement to Working Party 7C - Relevant technical information to support studies under WRC-27 agenda item 1.18
|
WP 5A
|
AI1.18
|
2024-12-12 |
|
[ 172 ]
|
Liaison statement to ITU-R Working Party 7C (copy to ICAO for information) - Technical parameters of Wireless Avionics Intra Communications (WAIC) operating in the 4 200-4 400 MHz frequency band to consider under WRC-27 agenda item 1.19
|
WP 5B
|
AI1.19
|
2024-11-29 |
|
[ 171 ]
|
Liaison statement to Working Party 7C - Coexistence study between EESS (active) and radiolocation
|
WP 5B
|
|
2024-11-27 |
|
[ 170 ]
|
Reply liaison statement to Working Party 7C - Preliminary draft new Report ITU-R M.[FOD_EESS_SHARE]
|
WP 5B
|
|
2024-11-27 |
|
[ 169 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.6
|
WP 6A
|
AI1.6
|
2024-11-18 |
|
[ 168 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D) - WRC-27 agenda item 1.10
|
WP 6A
|
AI1.10
|
2024-11-18 |
|
[ 167 ]
|
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17
|
WP 6A
|
AI1.17
|
2024-11-18 |
|
[ 166 ]
|
Reply liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 5A, 5B, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
|
WP 4C
|
AI1.10
|
2024-11-12 |
|
[ 165 ]
|
Reply liaison statement to Working Parties 7C and 7D on agenda item 1.18 - WRC-27 agenda item 1.18
|
WP 4A
|
AI1.18
|
2024-11-08 |
|
[ 164 ]
|
Reply liaison statement to Working Party 7C - WRC-27 agenda item 1.4
|
WP 4A
|
AI1.4
|
2024-11-08 |
|
[ 163 ]
|
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 5A, 5B, 5C, 5D, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1
|
WP 4A
|
AI1.1
|
2024-11-07 |
|
[ 162 ]
|
Reply liaison statement to Working Party 5B (copy for information to Working Parties 4A, 5A, 5C, 7C and 7D) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8
|
WP 4C
|
AI1.8
|
2024-10-22 |
|
[ 161 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7C and 7D) - WRC-27 agenda item 1.11
|
WP 4C
|
AI1.11
|
2024-10-22 |
|
[ 160 ]
|
Reply liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy to Working Party 5D) - WRC-27 agenda item 1.13
|
WP 4C
|
AI1.13
|
2024-10-22 |
|
[ 159 ]
|
Reply liaison statement to Working Party 7C - RNSS-related comments on preliminary draft new Report ITU-R RS.[AGG_EESS_SAR-RNSS]
|
WP 4C
|
|
2024-10-21 |
|
[ 158 ]
|
Reply liaison statement to Working Party 7C - WRC-27 agenda item 1.19
|
WP 5D
|
AI1.19
|
2024-10-15 |
|
[ 157 ]
|
Reply liaison statement to Working Party 7C - WRC-27 agenda item 1.17
|
WP 5D
|
AI1.17
|
2024-10-15 |
|
[ 156 ]
|
Liaison statement to Working Party 7C on WRC-27 agenda item 1.17
|
WP 7B
|
AI1.17
|
2024-10-08 |
|
[ 155 ]
|
Liaison statement to Working Party 7C on WRC-27 agenda item 1.19
|
WP 7B
|
AI1.19
|
2024-10-08 |
|
[ 154 ]
|
Reply liaison statement to ITU-R Working Party 3J (copied for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 3J questions related to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2024-09-30 |
|
[ 153 ]
|
Liaison statement to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2024-09-30 |
|
[ 152 ]
|
Reply liaison statement to Working Party 1A (copy to Working Parties 4C, 5A, 5D, 7C for information) - Beam Wireless Power Transmission (WPT)
|
WP 7D
|
|
2024-09-30 |
|
[ 151 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5C and 7C for information) - WRC-27 agenda item 1.3
|
WP 7D
|
AI1.3
|
2024-09-30 |
|
[ 150 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7
|
WP 7D
|
AI1.7
|
2024-09-30 |
|
[ 149 ]
|
Reply liaison statement to Working Party 5D on WRC-27 agenda item 1.7 (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D)
|
WP 7B
|
AI1.7
|
2024-09-30 |
|
[ 148 ]
|
Reply liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 4C, 5A, 5B, 6A and 7C for information) - Studies under WRC-27 agenda item 1.10
|
WP 7D
|
AI1.10
|
2024-09-30 |
|
[ 147 ]
|
Reply liaison statement to Working Party 7B (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A and 7C) - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
WP 7D
|
AI1.15
|
2024-09-30 |
|
[ 146 ]
|
Reply liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C,and 7C for information) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8
|
WP 7D
|
AI1.8
|
2024-09-27 |
|
[ 145 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C for information) - Information to support the studies under WRC-27 agenda item 1.1
|
WP 7D
|
AI1.1
|
2024-09-27 |
|
[ 144 ]
|
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C for information) - Technical information to support the studies for WRC-27 agenda items 1.12 and 1.13
|
WP 7D
|
AI1.13, AI1.12
|
2024-09-27 |
Resultats:243 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):