Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 933 ]
|
Report of activities of the Correspondence Group on scaling factor to Working Party 4A meeting of 27 June to 6 July 2023
|
Chairman, CG - Scaling Factor
|
|
2023-06-20 |
|
[ 932 ]
|
Preliminary draft new Recommendation ITU-R S.[RES.169_METH] - Methodology for examining the compliance of aeronautical earth stations in motion (A-ESIM) communicating with geostationary space stations in the fixed-satellite service in the 27.5-29.5 GHz band with a set of pre-established pfd limits on the Earth's surface
|
China (People's Republic of)
|
|
2023-06-20 |
|
[ 931 ]
|
Modification towards working document on Annex 14 to Working Party 4A Chairman's Report on WRC-23 agenda item 1.16 [NON-GSO_ESIM]
|
China (People's Republic of)
|
AI1.16
|
2023-06-20 |
|
[ 930 ]
|
Studies on the bandwidth used in the pfd mask for the protection of terrestrial service from transmissions of A-ESIM in the frequency band 12.75-13.25 GHz
|
China (People's Republic of)
|
AI1.15
|
2023-06-20 |
|
[ 929 ]
|
Working document towards an ITU-R Small Satellite Handbook
|
Editor
|
|
2023-06-20 |
|
[ 928 ]
|
Working document towards a preliminary draft new Report ITU-R S.[SCALING FACTOR] - Studies on the pfd scaling factor to be applied to non-GSO FSS constellations with 1 000 or more space stations operating in the 17.7-19.3 GHz band
|
France
|
|
2023-06-20 |
|
[ 927 ]
|
Protection of terrestrial services from interference from earth stations on aircraft under WRC-23 agenda item 1.15
|
Australia
|
AI1.15
|
2023-06-20 |
|
[ 926 ]
|
Proposal for an interim upgrade to Recommendation ITU-R S.1503 software tool to calculate epfd levels at any arbitrary location of earth station and GSO satellite
|
India (Republic of)
|
|
2023-06-19 |
|
[ 925 ]
|
Revision to Recommendation ITU-R S.1503
|
United Kingdom of Great Britain and Northern Ireland
|
|
2023-06-19 |
|
[ 924 ]
|
Preliminary draft new Recommendation ITU-R S.[RES.169_METH] - Methodology for examining the compliance of aeronautical earth stations in motion (A-ESIM) communicating with geostationary space stations in the fixed-satellite service in the 27.5-29.5 GHz band with a set of pre-established pfd limits on the Earth's surface
|
United Kingdom of Great Britain and Northern Ireland
|
|
2023-06-19 |
|
[ 923 ]
|
Proposed revisions to the working document on WRC-23 agenda item 1.16 - Interference management and responsibilities of administrations in case unacceptable interference is caused by ESIM operations communicating with non-GSO satellites in the Ka-band
|
Telesat Canada
|
AI1.16
|
2023-06-19 |
|
[ 922 ]
|
Preliminary draft new Recommendation ITU-R S.[RES.169_METH] - Methodology for examining the compliance of aeronautical earth stations in motion (A-ESIM) communicating with geostationary space stations in the fixed-satellite service in the 27.5-29.5 GHz band with a set of pre-established pfd limits on the Earth's surface
|
Germany (Federal Republic of)
,
Luxembourg
|
|
2023-06-19 |
|
[ 921 ]
|
Report on the final stage of implementation of Resolution 559 (WRC-19) before WRC-23
|
Director, BR
|
|
2023-06-19 |
|
[ 920 ]
|
Appendix 4 data items for submissions of Appendix 30B ESIM assignments in accordance with Annex 1 to draft new Resolution [A115] (WRC-23)
|
Director, BR
|
AI1.15
|
2023-06-19 |
|
[ 919 ]
|
Assignment of ITU-R Questions to the Study Group 4 sub-groups, Working Parties 4A and 4B
|
Canada
|
|
2023-06-19 |
|
[ 918 ]
|
Proposed revisions to the working document on WRC-23 agenda item 1.15 - Interference management and responsibilities of administrations in case unacceptable interference is caused by ESIM operations
|
Germany (Federal Republic of)
|
AI1.15
|
2023-06-19 |
|
[ 917 ]
|
Working document towards a preliminary draft new Report ITU-R S.[SCALING FACTOR] - Studies on the pfd scaling factor to be applied to non-GSO FSS constellations with 1 000 or more space stations operating in the 17.7-19.3 GHz band
|
Germany (Federal Republic of)
|
|
2023-06-19 |
|
[ 916 ]
|
Contribution to Working Party 4A on the need to amend relevant provisions of the Radio Regulations to protect broadcasting-satellite service (BSS) in Regions 1 and 3 from high power-flux density (pfd) values stemming from the operation of fixed-satellite service (FSS) in Region 2 in the frequency band 11.7-12.2 GHz
|
Iran (Islamic Republic of)
|
|
2023-06-19 |
|
[ 915 ]
|
Consideration of proposed change to satellite selection algorithm in Recommendation ITU-R S.1503
|
Indonesia (Republic of)
,
Samoa (Independent State of)
|
|
2023-06-19 |
|
[ 914 ]
|
Revisions to the working document on WRC-23 agenda item 1.17
|
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
|
AI1.17
|
2023-06-19 |
|
[ 913 ]
|
Working document on WRC-23 agenda item 1.16 [NON-GSO_ESIM] - Operation of earth stations in motion communicating with non-geostationary space stations in the fixed-satellite service allocations at 17.7-18.6 GHz, 18.8-19.3 GHz and 19.7-20.2 GHz (space-to-Earth) and 27.5-29.1 GHz and 29.5-30 GHz (Earth-to-space)
|
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
|
AI1.16
|
2023-06-19 |
|
[ 912 ]
|
Preliminary draft revision of Recommendation ITU-R S.1503-3 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations
|
United States of America
|
|
2023-06-19 |
|
[ 911 ]
|
Working document on WRC-23 agenda item 1.17
|
United States of America
|
AI1.17
|
2023-06-19 |
|
[ 910 ]
|
Methodology for examining characteristics of aeronautical earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service in the 27.5-29.5 GHZ band with respect to conformity with pfd limits
|
United States of America
|
AI1.5
|
2023-06-19 |
|
[ 909 ]
|
Sharing and compatibility studies for working document related to WRC-23 agenda item 1.17
|
United States of America
|
AI1.17
|
2023-06-19 |
|
[ 908 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[non-GSO-MODELING]
|
United States of America
|
|
2023-06-19 |
|
[ 907 ]
|
Proposed updates to working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO] - Calculation method to assess average throughput degradation and unavailability increase due to inter-system interference by a non-geostationary FSS satellite systems for frequency ranges between 10.7 GHz and 52.4 GHz
|
United States of America
|
|
2023-06-19 |
|
[ 906 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations
|
United States of America
|
|
2023-06-19 |
|
[ 905 ]
|
Working document on WRC-23 agenda item 1.16 [NON-GSO_ESIM] - Operation of earth stations in motion communicating with non-geostationary space stations in the fixed-satellite service allocations at 17.7-18.6 GHz, 18.8-19.3 GHz and 19.7-20.2 GHz (space-to-Earth) and 27.5-29.1 GHz and 29.5-30 GHz (Earth-to-space)
|
United States of America
|
AI1.16
|
2023-06-19 |
|
[ 904 ]
|
Revisions to working document on WRC-23 agenda item 7, Topic A - Tolerances for certain orbital characteristics of non-GSO space stations in the FSS, BSS, and MSS
|
United States of America
|
AI7A
|
2023-06-19 |
|
[ 903 ]
|
Proposals for the working document for agenda item 1.19 for WRC-23
|
Australia
|
AI1.19
|
2023-06-19 |
|
[ 902 ]
|
Proposal for addressing WCG issues in Recommendation ITU-R S.1503
|
Galaxy Space (Beijing) Technology Co., Ltd
|
|
2023-06-17 |
|
[ 901 ]
|
Working document on developing an ITU-R small satellite handbook
|
China (People's Republic of)
|
|
2023-06-16 |
|
[ 900 ]
|
Proposal for WRC-23 agenda item 7, Topic A
|
China (People's Republic of)
|
AI7A
|
2023-06-16 |
|
[ 899 ]
|
Working document on WRC-23 agenda item 1.17
|
China (People's Republic of)
|
AI1.17
|
2023-06-16 |
|
[ 898 ]
|
Sharing study of non-GSO satellite system communicating with aeronautical and maritime ESIM over the oceans on EESS (passive) in the 18.6-18.8 GHZ band under WRC-23 agenda item 1.16
|
China (People's Republic of)
|
AI1.16
|
2023-06-16 |
|
[ 897 ]
|
Updating Recommendation ITU-R S.1503
|
Global Satellite Operators Association (GSOA)
|
|
2023-06-16 |
|
[ 896 ]
(Rev.1) |
Working document on developing an ITU-R Small Satellite Handbook
|
International Amateur Radio Union
|
|
2023-06-15 |
|
[ 895 ]
|
Note to the Chairmen of Working Parties 4A and 7D (copy to the Chairmen of Study Group 1 and
Working Party 1A)
|
Chairman, WP 6A
|
|
2023-06-14 |
|
[ 894 ]
|
Proposed modifications to preliminary draft new Recommendation ITU-R S.[RES.169_METH] - Methodology for examining the compliance of aeronautical earth stations in motion (A-ESIM) communicating with geostationary space stations in the fixed-satellite service in the 27.5-29.5 GHz band with a set of pre-established pfd limits on the Earth's surface
|
Korea (Republic of)
|
|
2023-06-14 |
|
[ 893 ]
|
Proposed modifications to preliminary draft new Recommendation ITU-R S.[QV-METH-REF-LINKS]
|
Korea (Republic of)
|
|
2023-06-14 |
|
[ 892 ]
|
Preliminary draft revision of Recommendation ITU-R S.1503-3 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations
|
Russian Federation
|
|
2023-06-13 |
|
[ 891 ]
|
Analysis of e.i.r.p. mask application in compatibility studies with FSS (Earth-to-space) in the 6 425-7 125 MHz frequency band
|
Russian Federation
|
AI1.2
|
2023-06-13 |
|
[ 890 ]
|
Consideration of proposed changes to Recommendation ITU-R S.1503
|
Russian Federation
|
|
2023-06-13 |
|
[ 889 ]
|
Reference satellite antenna radiation patterns for non-geostationary orbit satellite antennas operating in the fixed-satellite service below 30 GHz contained in Recommendation ITU-R S.1528
|
Director, BR
|
|
2023-06-13 |
|
[ 888 ]
|
Working document on WRC-23 agenda item 1.19
|
Brazil (Federative Republic of)
|
AI1.19
|
2023-06-12 |
|
[ 887 ]
|
Proposal to incorporate PFD limits evaluation into working document on WRC-23 agenda item 1.17 - Consideration of PFD limits for protecting terrestrial services from non-GSO space stations transmitting in frequency band 27.5-29.5 GHZ
|
Japan
|
AI1.17
|
2023-06-12 |
|
[ 886 ]
|
Proposal to the work on preliminary draft new Recommendation ITU-R S.[RES.169_METH] - Methodology for examining the compliance of aeronautical earth stations in motion (A-ESIM) communicating with geostationary space stations in the fixed-satellite service in the 27.5-29.5 GHz band with a set of pre-established pfd limits on the Earth's surface
|
Japan
|
|
2023-06-12 |
|
[ 885 ]
|
Views on the proposed new topic to be considered under WRC-23 agenda item 7 - Modification to the Radio Regulations to protect broadcasting-satellite service (BSS) in Regions 1 and 3 from high power-flux density (pfd) values stemming from the operation of fixed-satellite service (FSS) in Region 2 in the frequency band 11.7-12.2 GHz
|
Japan
|
AI7
|
2023-06-12 |
|
[ 884 ]
|
Preliminary draft revision of Report ITU-R BO.2497-0 - Characteristics and effectiveness of frequency sharing criteria for the broad-casting-satellite service in Regions 1 and 3 subject to RR Appendix 30
|
Japan
|
Q283/4
|
2023-06-12 |
Resultats:983 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):