Contributions  |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 75 ]
(Rev.1) |
This Document has been withdrawn
|
Tele-IP
|
|
2001-10-01 |
|
[ 74 ]
(Rev.1) |
This Document has been withdrawn
|
Tele-IP
|
|
2001-10-01 |
|
[ 73 ]
|
FS interference criteria in the 38 and 40 GHz band
|
France
|
|
2001-10-01 |
|
[ 72 ]
|
Protection criteria for systems in the 14 GHz
|
France
|
|
2001-10-01 |
|
[ 71 ]
|
Preliminary Draft Revision of Recommendation ITU-R F.1398 - Question ITU-R 127/9
|
Brazil (Federative Republic of)
|
|
2001-10-01 |
|
[ 70 ]
|
Preliminary draft revision of Recommendation ITU-R F.1241
|
Brazil (Federative Republic of)
|
|
2001-10-01 |
|
[ 69 ]
|
Proposal for deletion of Recommendations ITU-R F.1092-1 and ITU-R F.1189-1
|
Brazil (Federative Republic of)
|
|
2001-10-01 |
|
[ 68 ]
|
Proposed liaison statement to Working Party 3M concerning rain attenuation calculations in Recommendation ITU-R P.530
|
Canada
|
|
2001-10-01 |
|
[ 67 ]
|
Report on ITU-T SG 4 (Geneva, 2-13 July 2001)
|
ITU-T SG 4 Rapporteur
|
|
2001-10-01 |
|
[ 66 ]
|
Report on ITU-T Sg 13 meeting (Caracas, May 2001)
|
ITU-T SG 13 Rapporteur
|
|
2001-10-01 |
|
[ 65 ]
|
Path planning and system design for fixed service systems in a multipath-fading environment
|
Israel (State of)
|
|
2001-10-01 |
|
[ 64 ]
|
Response to ITU-R WP 9A on their liaison supporting development of new ITU-T Recommendation G.821.1
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 63 ]
|
IP packet transfer delay in ITU-T Recommendation Y.1541
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 62 ]
|
Response to ITU-R WP 9A on their liaison on the relation between physical layer, IP and ATM parameters
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 61 ]
|
Liaison statement to Working Party 9A concerning - Path planning and system design for fixed service systems in a multipath-fading environment
|
WP 3M
|
|
2001-10-01 |
|
[ 60 ]
|
Liaison statement to Working Party 9A concerning - The design of digital radio-relay systems
|
WP 3M
|
|
2001-10-01 |
|
[ 59 ]
|
Liaison statement to WP 9A concerning Annex 2 of Recommendation ITU-R P.530
|
WP 3M
|
|
2001-10-01 |
|
[ 58 ]
|
Liaison statement to WP 9A concerning multipath fading prediction for link hop lengths less than 7 km
|
WP 3M
|
|
2001-10-01 |
|
[ 57 ]
|
Liaison statement to WP 9A concerning conversion from average worst month to shorter worst periods of time
|
WP 3M
|
|
2001-10-01 |
|
[ 56 ]
|
Chairman's Report of the meeting of Working Party 9A held in Geneva from 12-19 March 2001
|
Chairman, WP 9A
|
|
2001-10-01 |
|
[ 55 ]
|
Liaison Statement to WP 9A
|
WP 4-9S
|
|
2001-10-01 |
|
[ 54 ]
|
LS to WP 9A - Interference criteria to protect the fixed service systems from interference produced by GSO and Non-GSO satellites in the 37-40 GHz and 40.5-43.5 GHz bands
|
WP 4-9S
|
|
2001-10-01 |
|
[ 53 ]
|
Liaison statement to Working Parties 4A, 4B, 9A and 9B - Fixed service and fixed-satellite service parameters and characteristics in the 38 GHz and 40 GHz bands to be considered under agenda item 1.32 (WRC-03)
|
WP 4-9S
|
|
2001-10-01 |
|
[ 52 ]
|
List of documents issued
|
BR Secretariat
|
|
2001-10-01 |
|
[ 51 ]
|
Draft Revision of Recommendation ITU-R F.592-2
|
SG 9
|
|
2001-10-01 |
|
[ 50 ]
|
Proposed preliminary draft new Recommendation - Evaluation and planning of Fixed Service Radio System in a multipath fading environment
|
Tele-IP
|
|
2001-10-01 |
|
[ 49 ]
|
An introduction to the proposed preliminary draft new Recommendation evaluation and planning of radio systems in a multipath fading environment
|
Tele-IP
|
|
2001-10-01 |
|
[ 48 ]
|
Preliminary Draft Revision of Rec. ITU-R F.592 - Terminology used for Radio-Relay Systems
|
Russian Federation
|
|
2001-10-01 |
|
[ 47 ]
|
Inconsistency between error performance objectives approaches for bit rates below and above the primary rate
|
Russian Federation
|
|
2001-10-01 |
|
[ 46 ]
|
FS interference criteria in the 28 and 40 GHz band
|
France
|
|
2001-10-01 |
|
[ 45 ]
|
Working document toward DNR - Interference criteria to protect broadband wireless access systems in the fixed service from aggregate interference from GSO satellites of other services sharing the 37-40 GHz frequency band on a co-primary basis
|
United States of America
|
|
2001-10-01 |
|
[ 44 ]
|
DNR ITU-R F.[9A/PDIR]-Perform. degradation due to interfer. from other services sharing the same frequ. bands with real digital radio-relay links used in the intern. and nat. portions of a 27 500 km hypothetical ref. path at or above the prim. rat
|
United States of America
|
|
2001-10-01 |
|
[ 43 ]
|
Proposed amendments to PDNR ITU-R [9A/NGSO-3] - Interference criteria to protect the fixed service from time varying aggregate interference from other services sharing the 37-40 and 40.5-43.5 GHz bands on a co-primary basis
|
United States of America
|
|
2001-10-01 |
|
[ 42 ]
|
Comparison between the established and newly proposed methodologies for the evaluation of FSS interference impact on FS systems in frequency bands where precipitation attenuation is the predominant fading mechanism
|
United States of America
|
|
2001-10-01 |
|
[ 41 ]
|
Fixed Service parameters and future use of the frequency range 37.5 to 42.5 GHz
|
France
|
|
2001-10-01 |
|
[ 40 ]
|
Protection criteria for FS systems in the 6 GHz and 14 GHz band
|
France
|
|
2001-10-01 |
|
[ 39 ]
|
A process for incorporation of QoS into F-Series Recommendations
|
Canada
|
|
2001-10-01 |
|
[ 38 ]
|
Review of Recommendation ITU-R F.745 (Resolution ITU-R 44)
|
Brazil (Federative Republic of)
|
|
2001-10-01 |
|
[ 37 ]
|
Proposal for deletion of Recommendations ITU-R F.1189 and ITU-R F.1092
|
Brazil (Federative Republic of)
|
|
2001-10-01 |
|
[ 36 ]
|
Proposed modification to Recommendations ITU-R F.1491 and ITU-R F.1397
|
Brazil (Federative Republic of)
|
|
2001-10-01 |
|
[ 35 ]
|
Proposal for advancing the work on models for planning, evaluating the operation and estimating error performance of fixed radio systems
|
Telia AB, Farsta
|
|
2001-10-01 |
|
[ 34 ]
|
Proposed updating of certain Recommendations which are not reprinted including Recommendation ITU-R F.745
|
Japan
|
|
2001-10-01 |
|
[ 33 ]
|
Liaison statement to ITU-T Study Group 4 (Q.3/4, SG 11 (Q.BICC/11), SG 2 and ITU-R Working Parties 4B & 9A, JRG 8A-9B
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 32 ]
|
Liaison statement - Progress on Recommendations on availability of the physical layer
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 31 ]
|
Liaison statement to WP 9A - Derivation of fixed service interference criteria in the 5 925-6 425 MHz band
|
WP 4-9S
|
|
2001-10-01 |
|
[ 30 ]
|
Liaison to Study Group 9 - Conclusions of Study Group 9 meeting concerning future status of Joint Rapporteur Group 8A-9B and restructuring of SG 9 related activities
|
SG 8
|
|
2001-10-01 |
|
[ 29 ]
|
Liaison statement to Working Parties 9A, 9B and 4A - A new methodology to be used for the evaluation of the impact of space-to-Earth interference from the fixed-satellite service on the fixed service in frequency bands where ...
|
WP 4-9S
|
|
2001-10-01 |
|
[ 28 ]
|
Chairman's Report of the meeting of Working Party 9A held in Geneva (18-25 September 2000)
|
Chairman, WP 9A
|
|
2001-10-01 |
|
[ 27 ]
|
List of documents issued
|
BRSGD
|
|
2001-10-01 |
|
[ 26 ]
|
Consideration of the structure of ITU-R Study Group 9
|
Canada
|
|
2001-10-01 |
Resultats:125 documents Résultats :
Précédent -
1 -
2 -
3
- Suivant

|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):