Contribuciones  |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 154 ]
|
Working Party 1C for action - ITU Intersectoral response to ICNIRP - Public consultation of the draft ICNIRP guidelines on limting EMF exposure (100 kHz to 300 GHz)
|
ATDI
,
Orange Polska S.A.
|
Q239/1
|
2018-08-02 |
|
[ 153 ]
|
Response on liaison statement from the ITU-R on 'EMI standards for LED lighting'
|
International Special Committee on Radio Interference
|
|
2018-07-24 |
|
[ 152 ]
|
CISPR response to ITU-R WP 1A liaison statement Document 1A/TEMP/133
|
International Special Committee on Radio Interference
|
|
2018-07-24 |
|
[ 151 ]
|
Proposed amendments to the working document towards draft CPM text for WRC-19 agenda item 1.15
|
Canada
|
AI1.15
|
2018-05-28 |
|
[ 150 ]
|
Proposed modificatios to working document towards a preliminary draft new Report ITU-R SM.[275-450GHz_SHARING]
|
Canada
|
AI1.15
|
2018-05-28 |
|
[ 149 ]
|
Proposed modifications to working document towards a preliminary draft revision of Recommendatiin ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems
|
European Broadcasting Union
|
|
2018-05-28 |
|
[ 148 ]
|
Proposed revisions to working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] (Contribution to ITU-R Working Party 1B with copy to Working Party 1A) - [Methodolgy for spectrum management of wireless power transmission (WPT)]
|
European Broadcasting Union
|
|
2018-05-28 |
|
[ 147 ]
|
Preliminary draft revision of Recommendation ITU-R S.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems
|
Germany (Federal Republic of)
|
AI9.1
|
2018-05-28 |
|
[ 146 ]
|
Proposed draft new Report ITU-R SM.[275-450GHZ_SHARING] - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency range 275-450 GHz
|
Japan
|
AI1.15
|
2018-05-28 |
|
[ 145 ]
|
Proposed draft CPM text or WRC-19 agenda item 1.15
|
Japan
|
AI1.15
|
2018-05-28 |
|
[ 144 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[WPT.WIDE-BEAM.IMPACTS] - Impact study and human hazard issues for Wireless Power Transmission via radio frequency wide-beam
|
Japan
|
Q210/1
|
2018-05-28 |
|
[ 143 ]
|
Proposed revision of preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]
|
Japan
|
Q210/1, AI9.1
|
2018-05-28 |
|
[ 142 ]
|
Proposal on preliminary draft revision of Recommendation ITU-R SM.2110-0
|
Japan
|
Q210/1, AI9.1
|
2018-05-28 |
|
[ 141 ]
|
Commentary on working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]- [Methodology for spectrum management of wireless power tansmission (WPT)]
|
International Amateur Radio Union
|
AI9.1
|
2018-05-28 |
|
[ 140 ]
|
Proposed suppression of Recommendation ITU-R SM.1604
|
Korea (Republic of)
|
|
2018-05-28 |
|
[ 139 ]
|
Information on the current use for RAS in the band 275-450 GHz
|
Korea (Republic of)
|
|
2018-05-28 |
|
[ 138 ]
|
Proposed update to working document towards draft CPM text or WRC-19 agenda item 1.15 - Working document towards draft CPM text for WRC-19 agenda item 1.15 - Chapter 1 - Land mobile and fixed issues
|
United States of America
|
AI1.15
|
2018-05-28 |
|
[ 137 ]
|
Compatibility study between CDR and aeronautical radio navigation service ILS/VOR
|
China (People's Republic of)
|
|
2018-05-28 |
|
[ 136 ]
|
Corrigendum to Recommentation ITU-R SM.1227 - Efficient spectrum utilization using probabilistic methods
|
China (People's Republic of)
|
|
2018-05-28 |
|
[ 135 ]
|
Wireless power transfer (WPT) further studies on the performance of MF AM sound broadcasting receivers in the presence of interference from WPT
|
British Broadcasting Corporation(BBC)
|
Q210/1
|
2018-05-25 |
|
[ 134 ]
|
Statement to ITU-R Working Party 1A (copy to ITU-R Working Party 1B) - Informtion on medium frequency broadcast operation and listenning in portions of Region 2 for WPT Impact Asessment
|
North American Broadcasters Association (NABA)
|
|
2018-05-28 |
|
[ 133 ]
|
Proposals for CPM text for agenda item 9.1 issue 9.1.6
|
United Kingdom of Great Britain and Northern Ireland
|
|
2018-05-25 |
|
[ 132 ]
|
Study on the impact of WPT-EV on the 60 kHz standard frequency and time signal service
|
United Kingdom of Great Britain and Northern Ireland
|
|
2018-05-25 |
|
[ 131 ]
|
Working document towards a revision of Report ITU-R SM.2351-2 - Smart grid utility management systems
|
United Kingdom of Great Britain and Northern Ireland
|
|
2018-05-25 |
|
[ 130 ]
|
Draft Note to the Director Radiocommunication Bureau - Inconsistencies in Appendix 7 (Rev.WRC-15)
|
United Kingdom of Great Britain and Northern Ireland
|
|
2018-05-25 |
|
[ 129 ]
|
Preliminary draft new Report ITU-R SM.[VISIBLE-LIGHT] - Visible Light for Broadband Communications
|
Netherlands (Kingdom of the)
,
Korea (Republic of)
|
Q238/1
|
2018-05-25 |
|
[ 128 ]
|
Proposal on draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6 - Resolution 958 (WRC-15) Annex item 1 (WPT4EV)
|
Korea (Republic of)
|
Q210/1, AI1
|
2018-05-25 |
|
[ 127 ]
(Rev.1) |
Proposal on preliminary draft revision of Recommendation ITU-R SM.2110-0
|
Korea (Republic of)
|
Q210/1
|
2018-05-25 |
|
[ 126 ]
|
Proposed eitorial update of thirteen Recommendations and two Reports assigned to Working Party 1A
|
Chairman, SG 1 CG on editorial review
|
|
2018-05-28 |
|
[ 125 ]
|
Comments to the ITU-R Questions, recommendations and Reports assigned to ITU-R Working Party 1A
|
Chairman, SG 1 CP on editorial review
|
|
2018-05-28 |
|
[ 124 ]
|
This document has been withdrawn
|
Korea (Republic of)
|
AI1.15
|
2018-05-25 |
|
[ 123 ]
|
This document has been withdrawn
|
Korea (Republic of)
|
AI1.15
|
2018-05-25 |
|
[ 122 ]
(Rev.1) |
Proposed modification of working document towards a preliminary draft new Report ITU-R SM.[VISIBLE-LIGHT] - Visible Light for Broadband Communications
|
Korea (Republic of)
,
Netherlands (Kingdom of the)
|
Q238/1
|
2018-05-25 |
|
[ 121 ]
|
Proposed revisions to draft CPM text for WRC-19 agenda item 1.15
|
Germany (Federal Republic of)
|
AI1.15
|
2018-05-24 |
|
[ 120 ]
|
Proposal for a revision of Recommendation ITU-R SM.329 - Unwanted Emissions
|
Rohde & Schwarz GmbH & Co. KG
|
|
2018-05-24 |
|
[ 119 ]
|
Proposed revision of working document towards a preliminary draft new Report ITU-R Sm.[275-450GHZ_SHARING]
|
Russian Federation
|
|
2018-05-22 |
|
[ 118 ]
|
Proposed update to working document towards a preliminary draft new Report ITU-R SM.[275-450GHZ_SHARING] - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency range 275-450 GHz
|
United States of America
|
AI1.15
|
2018-05-18 |
|
[ 117 ]
|
Proposed revisions to the working document towards a preliminary draft new Report ITU-R SM.[WPT.WIDE BEAM.IMPACTS]
|
United States of America
|
|
2018-05-18 |
|
[ 116 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5KHZ] - Technical characteristics and impact analyses of non-beam inductive Wireless Power Transmission (WPT) applications, excluding electric vehicle charging (Question ITU-R 210-3/1)
|
United States of America
|
Q210/1
|
2018-05-18 |
|
[ 115 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R SM.2110-0 - Frequency ranges for operation of non-beam wireless power transmission systems
|
United States of America
|
Q210/1
|
2018-05-18 |
|
[ 114 ]
|
Preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]
|
Netherlands (Kingdom of the)
|
|
2018-05-15 |
|
[ 113 ]
|
Preliminary position on WRC-19 agenda
|
World Meteorological Organization
|
|
2018-05-03 |
|
[ 112 ]
|
Liaison statement to ITU-R Working Party 1B (copy to ITU-R Working Party 1A) - Information on current activities in APT Wireless Group on Wireless Power Transmission (WPT)
|
Asia-Pacific Telecommunity
|
|
2018-05-01 |
|
[ 111 ]
|
Working document towards a preliminary draft nrew Report ITU-R SM.[NAT-APR] - National approaches and experiences on the compatibility assessments between the sound-broadcasting service in the band 87-108 MHz and the aeronautical services in the band 108-137 MHz
|
Germany (Federal Republic of)
|
|
2018-04-20 |
|
[ 110 ]
|
Outgoing liaison statement to ITU-R Working Party 1A on WPT activities
|
International Electrotechnical Commission
|
|
2018-04-17 |
|
[ 109 ]
|
Visible light for broadband communications
|
Netherlands (Kingdom of the)
|
|
2018-03-02 |
|
[ 108 ]
|
Revision of Recommendation ITU-R SM.329: EMC/EMI in relation to IMT
|
ATDI
|
Q222/1
|
2018-02-20 |
|
[ 107 ]
|
Revision of ITU-R SM.329 Unwanted emissions of IMT-2020 systems; measurement bandwidth
|
ATDI
|
Q222/1
|
2018-01-24 |
|
[ 106 ]
|
Proposed modifications to Annex 3 to Working Party 1B Chairman's Report - Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM] - [Methodology for spectrum management of wireless power tansmission (WPT)]
|
European Broadcasting Union
|
|
2017-11-16 |
|
[ 105 ]
|
Reply from IEC/TC69/WG7 and ISO/TC22/SC37/JPT19363 to liaison statement from Working Party 1A and Working Party 1B
|
International Electrotechnical Commission
,
International Organization for Standardization
|
|
2017-11-16 |
Resultados :204 documentos Resultados :
Anterior -
1 -
2 -
3 -
4 -
5
- Siguiente

|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):