Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 480 ]
(Rev.1) |
Proposed new work item on ITU-T L.CE_2 "Identifying Design Guidelines for Meeting the Circular Economy Principles"
|
Argentina
,
Côte d'Ivoire
,
Huawei Technologies Co., Ltd. (China)
,
Kenya
,
Orange (France)
,
Spain
,
Tanzania
,
Uganda
|
Q7/5
|
2019-04-29 |
|
[ 479 ]
|
Case studies of RF-EMF assessments - exposure levels taken in different conditions and areas
|
Orange Polska S.A. (Poland)
|
Q3/5
|
2019-04-29 |
|
[ 478 ]
(Rev.1) |
Comparison of measurements of the exposure levels in countries with different exposure limits
|
Orange (France)
,
Orange Polska S.A. (Poland)
|
Q3/5
|
2019-04-29 |
|
[ 477 ]
|
SAR assessment of the wireless radiocommunication devices operating close to the human body
|
Orange Polska S.A. (Poland)
|
Q3/5
|
2019-04-29 |
|
[ 476 ]
(Rev.1) |
K.90 "Evaluation techniques and working procedures for compliance with exposure limits of network operator personnel to power-frequency electromagnetic fields": New version of the Appendix II: software EMFACDC
|
Orange Polska S.A. (Poland)
|
Q3/5
|
2019-04-29 |
|
[ 475 ]
(Rev.1) |
Revised recommendation K.116 (Electromagnetic compatibility requirements and test methods for radio telecommunication terminal equipment) for consent
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q4/5
|
2019-04-29 |
|
[ 474 ]
|
New work item proposal on general principles for the green supply chain management of ICT manufacturing industry.
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q7/5
|
2019-04-29 |
|
[ 473 ]
|
Second draft of Recommendation ITU-T L.SE_BS "Smart energy solution for telecom base stations"
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/5
|
2019-04-29 |
|
[ 472 ]
(Rev.1) |
Proposal on power supply system architecture for ITU-T L. 5G_powering "Sustainable power feeding solutions for 5G network "
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/5
|
2019-04-29 |
|
[ 471 ]
|
First draft of Recommendation ITU-T L.DCIM " Specifications of Data Center Infrastructure Management (DCIM) System based on Big Data and AI Technology"
|
Ministry of Industry and Information Technology (MIIT) (China)
|
Q6/5
|
2019-04-29 |
|
[ 470 ]
|
The second draft of K.sod "Surge and over-current protection parameters of external disconnector for surge protective devices used in telecommunication equipment"
|
China Unicom
|
Q2/5
|
2019-04-28 |
|
[ 469 ]
(Rev.1) |
Clarification for internal Ethernet cable tests
|
ADTRAN (United States)
|
Q2/5
|
2019-04-26 |
|
[ 468 ]
(Rev.1) |
Discrepancy in K.20, table 1a
|
ADTRAN (United States)
|
Q2/5
|
2019-04-26 |
|
[ 467 ]
(Rev.1) |
Alternative for test 2.4 Ethernet mains power contact - 2 of 2
|
ADTRAN (United States)
|
Q2/5
|
2019-04-26 |
|
[ 466 ]
(Rev.1) |
Test 2.4 Ethernet mains power contact - 1 of 2
|
ADTRAN (United States)
|
Q2/5
|
2019-04-26 |
|
[ 465 ]
(Rev.1) |
Note 4 in table2b reflects installation practices
|
ADTRAN (United States)
|
Q2/5
|
2019-04-26 |
|
[ 464 ]
(Rev.1) |
Transverse surge for single pair internal ports
|
ADTRAN (United States)
|
Q2/5
|
2019-04-26 |
|
[ 463 ]
(Rev.1) |
Capacitor selection for Ethernet transverse surge
|
ADTRAN (United States)
|
Q2/5
|
2019-04-26 |
|
[ 462 ]
|
Reply to Document SG5-C386 about the terms and definitions
|
Xiamen SET Electronics Co., Ltd (China)
|
Q2/5
|
2019-04-26 |
|
[ 461 ]
(Rev.1) |
Second draft of K.77 Characteristics of metal oxide varistors for the protection of telecommunication installations
|
Xiamen SET Electronics Co., Ltd (China)
|
Q2/5
|
2019-04-26 |
|
[ 460 ]
(Rev.1-2) |
Recommendation ITU-T L.GAL2 - Interface for power management in NFV environments "Green Abstraction Layer 2"
|
Orange (France)
,
Consorzio Nazionale Interuniversitario per le Telecomunicazioni CNIT (Italy)
|
Q6/5
|
2019-04-26 |
|
[ 459 ]
(Rev.1) |
First draft of Passive intermodulation test methods of array antenna systems in mobile communication systems (K.pim)
|
China Mobile Communications Corporation
|
Q4/5
|
2019-04-26 |
|
[ 458 ]
(Rev.1-3) |
L.5G_powering: Huawei proposal on Sustainable power feeding solutions for 5G network
|
Huawei Technologies Co., Ltd. (China)
|
Q6/5
|
2019-04-26 |
|
[ 457 ]
(Rev.1-2) |
L.5G_powering: Proposal addition to Sustainable power feeding solutions for 5G network
|
Huawei Technologies Co., Ltd. (China)
|
Q6/5
|
2019-04-26 |
|
[ 456 ]
(Rev.1) |
L.DCIM: Data Center Infrastructure Management system evolution
|
Huawei Technologies Co., Ltd. (China)
|
Q6/5
|
2019-04-26 |
|
[ 455 ]
(Rev.1) |
The coupling network proposal of the Ethernet transverse lightning test in ITU-T K.44
|
Huawei Technologies Co., Ltd. (China)
|
Q2/5
|
2019-04-26 |
|
[ 454 ]
(Rev.1) |
L.DCIM: Data Center Infrastructure Management system cooling control
|
Huawei Technologies Co., Ltd. (China)
|
Q6/5
|
2019-04-26 |
|
[ 453 ]
|
Proposal to add a clause to demonstrate the protection measure for antenna system against lightning in different installation scenarios in ITU-T K.112.
|
Huawei Technologies Co., Ltd. (China)
|
Q1/5
|
2019-04-26 |
|
[ 452 ]
|
EMF in the vicinity of the metallic fences.
|
Orange Polska S.A. (Poland)
|
Q3/5
|
2019-04-26 |
|
[ 451 ]
|
Overestimation of the exposure level in vicinity of Radio Base Stations.
|
Orange Polska S.A. (Poland)
|
Q3/5
|
2019-04-26 |
|
[ 450 ]
(Rev.1) |
L.1000 rev, Proposal for revision of recommendation L.1000
|
Huawei Technologies Co., Ltd. (China)
|
Q7/5
|
2019-04-26 |
|
[ 449 ]
|
Proposed new work item on draft Recommendation ITU-T K.PLC.EMC "Electromagnetic compatibility requirements and measurement methods for outdoor equipment using power line communication technology"
|
Huawei Technologies Co., Ltd. (China)
|
Q4/5
|
2019-04-26 |
|
[ 448 ]
(Rev.1) |
Region efforts towards sustainable e-waste management in the East African Region
|
Agence de Régulation et de Contrôle des Télécommunications (ARCT) (Burundi)
,
Communications Authority of Kenya (CA)
,
Kenya
,
Rwanda Utilities Regulatory Authority (RURA)
,
Tanzania Communications Regulatory Authority (TCRA)
,
Uganda Communications Commission (UCC)
|
Q7/5
|
2019-04-26 |
|
[ 447 ]
(Rev.1) |
K.Sup.access_trunk_networks to-ITU-T-K.45 on "Rationale for setting resistibility requirements of telecommunication equipment installed in the access and trunk networks against lightning": 1st draft of Supplement
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2019-04-26 |
|
[ 446 ]
(Rev.1) |
K.Sup.telecom_centre to-ITU-T-K.20 on "Rationale for setting resistibility requirements of telecommunication equipment installed in a telecommunication centre against lightning": 1st draft of Supplement
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2019-04-26 |
|
[ 445 ]
(Rev.1) |
K.Sup.customer to-ITU-T-K.21 on "Rationale for setting resistibility requirements of telecommunication equipment installed in customer premises against lightning": 1st draft of Supplement
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2019-04-26 |
|
[ 444 ]
|
K.spdsafe: fifth draft of "Guidance on safety relating to the use of surge protective devices and surge protective components in telecommunication terminal equipment"
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q2/5
|
2019-04-26 |
|
[ 443 ]
|
Manhole-type base station (update of Appendix IX in K.91)
|
National Institute of Information and Communications Technology (NICT) (Japan)
,
NTT DOCOMO, INC. (Japan)
|
Q3/5
|
2019-04-26 |
|
[ 442 ]
|
Notes for applying IEC 61000-4-5 Ed.3
|
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
|
Q4/5
|
2019-04-26 |
|
[ 441 ]
|
L.CE_Concepts on "Circular Economy; Definitions and concepts for material efficiency for ICT": Proposed new baseline text
|
Egypt
,
Huawei Technologies Co., Ltd. (China)
|
Q7/5
|
2019-04-25 |
|
[ 440 ]
|
The 5th draft of K.vss "Lightning protection and Earthing of Video Surveillance System"
|
China Telecommunications Corporation
|
Q1/5
|
2019-04-25 |
|
[ 439 ]
|
Withdrawn due to duplication
|
N/A
|
|
2019-04-25 |
|
[ 438 ]
|
Smart Monitoring and Communication Units of low-voltage surge protective devices(SPDs) used in telecommunication systems
|
China Telecommunications Corporation
|
Q2/5
|
2019-04-25 |
|
[ 437 ]
|
New contents of intelligent heat pipe system proposed to add to draft recommendation L.SE_BS
|
China Unicom
|
Q6/5
|
2019-04-25 |
|
[ 436 ]
|
New contents of intelligent heat exchange system proposed to add to draft recommendation L.SE_BS
|
China Unicom
|
Q6/5
|
2019-04-25 |
|
[ 435 ]
(Rev.1) |
New contents of intelligent fresh ventilation system proposed to add to draft recommendation L.SE_BS
|
China Unicom
|
Q6/5
|
2019-04-25 |
|
[ 434 ]
(Rev.1) |
Information of semiconductor devices required for design of telecommunication equipment applying soft error mitigation measures
|
Fujitsu Limited (Japan)
,
Hitachi, Ltd. (Japan)
,
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT)
,
Oki Electric Industry Company Ltd. (OKI) (Japan)
|
Q5/5
|
2019-04-25 |
|
[ 433 ]
|
New work item proposal on methodologies for evaluating the functionality and performance of power supply unit configured for servers
|
China Unicom
|
Q6/5
|
2019-04-25 |
|
[ 432 ]
|
Proposed new work item on draft Recommendation ITU-T L.5G_sav-Energy saving technologies and best practices for 5G RAN equipment
|
China Telecommunications Corporation
|
Q6/5
|
2019-04-25 |
|
[ 431 ]
|
5th draft of the new ITU-T Recommendation K.ipe "Electromagnetic compatibility requirements for Information Perception Equipment"
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd. (China)
,
ZTE Corporation (China)
|
Q4/5
|
2019-04-25 |
Results:121 total items. Result page:
Previous -
1 -
2 -
3
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):