International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:76 total items.
Result page:  Previous -  1 - 2
Contributions  [ Source: British Telecommunications Public Ltd. Co. (BT Plc) ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1099 ]  
 
G.hs, G.fast: Handshake tones for G.fast     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-11-11
[ 1059 ]  
 
Ethernet Protection over Dual Parented Type B (TDM/TDMA) PON     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2014-11-11
[ 1053 ]  
 
On DRRus report format to support queue fill and traffic arrival triggers for LPM state changes     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-11-11
[ 980 ]  
 
"G.989.3 Clause 18 NG-PON2 Protection"     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2014-11-10
[ 972 ]  
 
G.8031/Y.1342 - 1:1 Unidirectional Ethernet Protection Switching to Support Dual parenting PON Protection     British Telecommunications Public Ltd. Co. (BT Plc) , Huawei Technologies Co. Ltd.   Q9/15   2014-11-10
[ 943 ]  
 
High level description of a protection solution using dual parented type B (TDM/TDMA) PON     British Telecommunications Public Ltd. Co. (BT Plc) , Huawei Technologies Co. Ltd.   Q9/15   2014-11-10
[ 775 ]  
(Rev.1) 
G.fast: BT TAP comments on G.9700 (ex G.fast-PSD)     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 773 ]  
 
G.997.1: On extending G.997.1 to support PMA functionality     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 772 ]  
 
G.fast: On Reverse Power Feeding system noise requirements     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 769 ]  
 
Proposed revisions to G.989.2 LC document     British Telecommunications Public Ltd. Co. (BT Plc) , Calix Networks, Inc. , Telecom Italia S.p.A.   Q2/15   2014-03-11
[ 759 ]  
 
Access budget within E2E Time/phase HRM     British Telecommunications Public Ltd. Co. (BT Plc)   Q13/15   2014-03-11
[ 753 ]  
 
Isolation specifications for G.984.5 Revised     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2014-03-11
[ 750 ]  
(Rev.1) 
VDSL2 and G.FAST need a flexible protection mechanism against time varying noise.     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 706 ]  
 
NG-PON2 Type B Protection     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2014-03-11
[ 665 ]  
 
G.fast: On the scope of G.fast Amendment 1     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-10
[ 664 ]  
 
G.fast: On standardisation of advanced UPBO methods for vectored G.fast     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-10
[ 478 ]  
(Rev.1-2) 
Reference diagrams for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , Coriant GmbH & Co. KG , Telefon AB - LM Ericsson   Q6/15   2014-03-07
[ 439 ]  
(Rev.1) 
[FAST] Proposal for improvements to draft text for G.fast-psd     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 438 ]  
 
Extended RAM and Retransmission in VDSL2 on Vector Capable Hardware     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 436 ]  
 
[FAST] On Aggregate Transmitter Power     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 434 ]  
 
[FAST] On Power Budget     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 431 ]  
(Rev.1) 
[FAST] On VHF background noise assumptions for G.FAST     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 413 ]  
 
[FAST] Low Power Mode Requirements for G.FAST     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 384 ]  
(Rev.1) 
Type B PON Dual Parenting Restoration Solution     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2013-06-18
[ 377 ]  
 
Requirements for passive metro WDM systems     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc)   Q6/15   2013-06-18
[ 29 ]  
 
BT proposed revisions to ITU-T G.652 Recommendation     British Telecommunications Public Ltd. Co. (BT Plc)   Q5/15   2013-06-12
Results:76 total items.
Result page:  Previous -  1 - 2  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-25