Contributions
[ AI/Question: Q13/15 ] ![Documents / Contributions](/res/templates/dms/images/key.gif) |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2051 ]
|
Proposal on "position maintenance" work pattern of PRTC GNSS receiver
|
China Unicom
|
Q13/15
|
2016-09-05 |
|
[ 2050 ]
|
1588 network performance monitoring mechanism
|
China Unicom
|
Q13/15
|
2016-09-05 |
|
[ 2042 ]
|
Leap second behaviour on PTP clocks [G.8265.1, G.8275.1, G8275.2]
|
Cisco Systems, Inc.
|
Q13/15
|
2016-09-05 |
|
[ 2034 ]
|
Proposal of maintenance of G.781 Option III
|
KDDI Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q13/15
|
2016-09-05 |
|
[ 2033 ]
|
Proposal of frequency and time holdover alarms (Sync OAM)
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q13/15
|
2016-09-05 |
|
[ 2032 ]
|
Proposal of monitoring methods for PTP backup path (Sync OAM)
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q13/15
|
2016-09-05 |
|
[ 1999 ]
|
PDV Templates for Testing Partial Timing Support
|
Qulsar, Inc.
|
Q13/15
|
2016-09-05 |
|
[ 1977 ]
|
TC Noise Model Analysis
|
RAD Data Communications, Ltd.
|
Q13/15
|
2016-09-04 |
|
[ 1976 ]
+Corr.1 |
Removing Unnecessary Sections in G.8273.3
|
RAD Data Communications, Ltd.
|
Q13/15
|
2016-09-04 |
|
[ 1975 ]
+Corr.1 |
G.8261 Editorial Comments
|
RAD Data Communications, Ltd.
|
Q13/15
|
2016-09-04 |
|
[ 1974 ]
|
Testing G.8261 Scenarios against G.8271.2 Network Limits
|
RAD Data Communications, Ltd.
|
Q13/15
|
2016-09-04 |
|
[ 1971 ]
|
Reference switching and eEEC specification (Part 2)
|
Deutsche Telekom AG
|
Q13/15
|
2016-09-03 |
|
[ 1966 ]
|
Proposed modifications to draft G.709.1 for PTP over FlexO OSMC
|
Microsemi Corporation
|
Q13/15, Q11/15
|
2016-09-03 |
|
[ 1954 ]
|
Synchronization management model, comments on TD549/WP3 Rev.1
|
ZTE Corporation
|
Q14/15, Q13/15
|
2016-09-02 |
|
[ 1937 ]
|
Considerations on sync in fronthaul
|
Telefon AB - LM Ericsson
|
Q13/15
|
2016-09-02 |
|
[ 1936 ]
|
SyncE Master ID (G.8264)
|
Telefon AB - LM Ericsson
|
Q13/15
|
2016-09-02 |
|
[ 1935 ]
|
T-TSC Physical layer frequency to PTP noise transfer specification (G.8273.2)
|
Telefon AB - LM Ericsson
|
Q13/15
|
2016-09-02 |
|
[ 1934 ]
|
Enhanced SyncE Network Limits (G.8261) and Clock (G.8262.1)
|
Telefon AB - LM Ericsson
|
Q13/15
|
2016-09-02 |
|
[ 1899 ]
|
Response on redundant model in TD549
|
Ciena Canada
|
Q13/15
|
2016-08-31 |
|
[ 1898 ]
|
G.8263 Amd. 2 - Typos
|
Ciena Canada
|
Q13/15
|
2016-08-31 |
|
[ 1896 ]
(Rev.1) |
G.8262.1 short term phase transient response for parameter C
|
Ciena Canada
|
Q13/15
|
2016-08-31 |
|
[ 1892 ]
|
G.8275.2 - Deny of service requests
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-08-31 |
|
[ 1891 ]
(Rev.1) |
G.8275.1 T-BC phase/time traceability information
|
Integrated Device Technology (IDT)
|
Q13/15
|
2016-08-31 |
|
[ 1886 ]
|
Regarding Packet-Based Clock Model in G.8273.4
|
Qulsar, Inc.
|
Q13/15
|
2016-08-31 |
|
[ 1885 ]
|
Regarding Functional Model in G.8273.4
|
Qulsar, Inc.
|
Q13/15
|
2016-08-31 |
|
[ 1884 ]
|
Proposed text in G.8273.2 - Part 2
|
Qulsar, Inc.
,
Silicon Laboratories, Inc.
|
Q13/15
|
2016-08-31 |
|
[ 1883 ]
|
Proposed text in G.8273.2 - Part 1
|
Qulsar, Inc.
,
Silicon Laboratories, Inc.
|
Q13/15
|
2016-08-31 |
Results:77 total items. Result page:
Previous -
1 -
2
|
Multiple Document Download: Formats and Languages to be included (when available):