International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2016-02-15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2016-02-15) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2016-02-15 to 2016-02-26

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-07-01  2013-02-01 

Results:99 total items.
Result page:  Previous -  1 - 2
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1677 ]  
 
G.8260: Difference between Two-Way Offset and Two-Way Time Error     Calnex Solutions Limited , Nokia Solutions and Networks GmbH & Co. KG   Q13/15   2016-02-01
[ 1676 ]  
 
G.8271: Editorial corrections     Calnex Solutions Limited   Q13/15   2016-02-01
[ 1675 ]  
 
G.8275.1: T-TSC clockClass and holdover     Calnex Solutions Limited , Coriant GmbH & Co. KG , Nokia Solutions and Networks GmbH & Co. KG   Q13/15   2016-02-01
[ 1654 ]  
 
Proposal on synchronization information model     China Mobile Communications Corporation   Q14/15, Q13/15   2016-02-01
[ 1653 ]  
 
Method of time variation detection in T-BC (G.8273.2)     Nippon Telegraph and Telephone Corporation (NTT)   Q13/15   2016-02-01
[ 1652 ]  
 
The planning and monitoring of the synchronization paths     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q13/15   2016-02-01
[ 1651 ]  
 
ePRTC and T-GM function model (G.8272.1)     Nippon Telegraph and Telephone Corporation (NTT)   Q13/15   2016-02-01
[ 1650 ]  
 
Measurement methods of message delay time for time synchronization     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q13/15   2016-02-01
[ 1649 ]  
(Rev.1) 
Transporting CPRI clients with different clock sources  
C-1649 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
 
Nippon Telegraph and Telephone Corporation (NTT)   Q13/15, Q11/15   2016-02-01
[ 1648 ]  
 
Proposal to include time synchronization defects and performance monitoring functions in G.781.1     China Mobile Communications Corporation   Q13/15   2016-02-01
[ 1647 ]  
 
Proposal to include frequency synchronization defects and performance monitoring functions in G.781     China Mobile Communications Corporation   Q13/15   2016-02-01
[ 1646 ]  
 
Considerations on the selection of ePRTC/PRTC T-GMs by alternate BMCA     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , ZTE Corporation   Q13/15   2016-02-01
[ 1645 ]  
 
Addressing Editor's note in G.8264     Huawei Technologies Co., Ltd. , Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1642 ]  
 
Editing improvements in G.8275.2 clause 6.7.5, Clock attribute clockAccuracy     Microsemi Corporation , Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1640 ]  
 
Improving performance in Partial Timing Support     Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1639 ]  
 
Comments on latest draft of G.8275.2 (and G.8265.1)     Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1637 ]  
 
Clarifications on T-TSC in G.8275.1     Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1636 ]  
 
Clarification on requirements in G.8271     Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1634 ]  
 
Comments on latest draft of G.8271     Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1633 ]  
 
Proposal to indicate the type of ePRTC/PRTC in the PTP messages     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , ZTE Corporation   Q13/15   2016-02-01
[ 1620 ]  
 
Performance monitoring in Sync OAM     China Mobile Communications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q13/15   2016-02-01
[ 1615 ]  
(Rev.1) 
Consideration and proposal on PTP event message in FlexO IrDI  
C-1615 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
 
ZTE Corporation   Q13/15, Q11/15   2016-02-01
[ 1611 ]  
(Rev.1) 
Frequency error test results - CPRI over ODU2r  
C-1611 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
 
IP Light   Q13/15, Q11/15   2016-02-01
[ 1592 ]  
(Rev.1-2) 
Propose SG15 to start pre-research project on IMT2020 Mobile back haul and front haul network     Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation   Q6/15, Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2016-02-01
[ 1553 ]  
 
RMS Frequency Offset of CPRI Clients Asynchronously Mapped to and Demapped from OTN     Microsemi Corporation   Q13/15, Q11/15   2016-01-29
[ 1552 ]  
 
PTP Timestamping on Multilane OTN Interfaces     Microsemi Corporation   Q13/15, Q11/15   2016-01-29
[ 1543 ]  
 
G.8272.1 Functional Model     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1542 ]  
 
G.8272.1 Clause 9     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1541 ]  
 
G.8272.1 Clause 8.2     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1540 ]  
 
G.8272.1 Clause 6.3.1     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1539 ]  
 
G.8272.1 Clause 6.2     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1538 ]  
 
G.8272.1 Clause 6.1     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1537 ]  
 
G.8272.1 Clause 6     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1536 ]  
 
G.8272.1 scope     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1535 ]  
 
G.8275.2 Support interoperability with equipment deployed per ITU-T G.8265.1     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1534 ]  
 
G.8275.2 Table 1     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1533 ]  
 
G.8275.2 data set members     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1532 ]  
 
G.8275.1 twoStepFlag range for a Telecom Time Slave Clock     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1531 ]  
 
G.8265.1 twoStepFlag range for a Slave only clock     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1523 ]  
 
Follow-up on G.8275.2: Requirement for an Accurate T3 Value     Orange   Q13/15   2016-01-22
[ 1522 ]  
 
Summary on G.8266 for finalization.     Orange   Q13/15   2016-01-22
[ 1521 ]  
 
Clarification on the timing accuracy specification for the 1PPS measurement interface     Huawei Technologies Co., Ltd. , Orange , Telefon AB - LM Ericsson   Q13/15, Q11/15   2016-01-22
[ 1520 ]  
 
Editorial on ToD from the contribution WDPisa32     Orange   Q13/15   2016-01-22
[ 1519 ]  
 
Phase/time synchronization over Microwave networks     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-01-22
[ 1518 ]  
 
Additional information on frequencyTraceable Flag of G.8275.1     Orange   Q13/15   2016-01-22
[ 1517 ]  
 
Text modification under section 6.4 of G.8275.1     China Unicom , Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-01-22
[ 1516 ]  
 
PTP interfaces requirements for G.8266     Orange   Q13/15   2016-01-22
[ 1515 ]  
 
Proposal to study Synchronization over Ethernet in the Fronthaul (G.8271)     Orange   Q13/15   2016-01-22
[ 1514 ]  
 
Functional Block diagram for ePRTC     Orange   Q13/15   2016-01-22
Results:99 total items.
Result page:  Previous -  1 - 2  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-18