International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-12-05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-12-05) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-12-05 to 2011-12-16

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:66 total items.
Result page:  Previous -  1 - 2
Contributions  [ Source: Huawei Technologies Co. ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1738 ]  
(Rev.1) 
On-grid frequencies up & down proposal in Decision 2 of Decision Tree     Gemfire Europe Limited , Huawei Technologies Co. Ltd.   Q6/15   2011-11-22
[ 1734 ]  
 
Status of Jitter/Wander Requirements and Performance for the Transport of SDI Video Clients over OTN     Huawei Technologies Co. Ltd.   Q13/15   2011-11-21
[ 1733 ]  
 
Rise time requirements of RS422 1PPS_OUT signal     Huawei Technologies Co. Ltd.   Q13/15   2011-11-21
[ 1731 ]  
 
Jitter/Wander Testing Related to Transport of PTPv2 Messages over OTN     Huawei Technologies Co. Ltd.     2011-11-21
[ 1730 ]  
 
Maximum FFO of the Output of a Second-Order PLL due to a Sinusoidal and Triangular Wave Input     France Télécom Orange , France Télécom Orange , Huawei Technologies Co. Ltd. , Iometrix, Inc.   Q13/15   2011-11-21
[ 1729 ]  
 
Initial Simulation Results for Transport of Time over the HRM2b chain of Boundary Clocks     France Télécom Orange , France Télécom Orange , Huawei Technologies Co. Ltd. , Iometrix, Inc.   Q13/15   2011-11-21
[ 1728 ]  
 
Detection and removal of Delay Jumps using FWPR and minMATIE     Huawei Technologies Co. Ltd.   Q13/15   2011-11-21
[ 1727 ]  
 
ESCON, Infiniband, and DVB_ASI Jitter Accumulation over OTN Islands     Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2011-11-21
[ 1726 ]  
 
Criterion for Minimum Detectable Floor Delay Step using minMATIE     Huawei Technologies Co. Ltd.   Q13/15   2011-11-21
[ 1725 ]  
 
Initial Simulation Results for Transport of Time over the HRM3 chain of Boundary Clocks, with SyncE Reference Chain Rearrangements     France Télécom Orange , France Télécom Orange , Huawei Technologies Co. , Iometrix, Inc.   Q13/15   2011-11-21
[ 1677 ]  
(Rev.1) 
Draft contents of new Recommendation G.odusmp     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2011-11-21
[ 1624 ]  
(Rev.1) 
A Proposal of the draft new Recommendation G.mecp     Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co. Ltd.   Q9/15   2011-11-21
[ 1598 ]  
(Rev.1) 
Draft Recommendation G.smp.signalling     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2011-11-18
[ 1549 ]  
(Rev.1) 
The support of XGPON for serial devices in the smart grid     FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q2/15   2011-11-18
[ 1548 ]  
 
Withdrawn, duplicate of C-1549  
Withdrawn
 
FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q2/15   2011-11-18
[ 1523 ]  
(Rev.1-3) 
Amendment of G.8113.1 based on results of Beijing expert meeting     Huawei Technologies Co. Ltd.   Q10/15   2011-10-14
Results:66 total items.
Result page:  Previous -  1 - 2  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-16