Contributions
[ AI/Question: Q13/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1676 ]
(Rev.1) |
Noises Introduced by Boundary Clocks
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1674 ]
(Rev.1) |
G.8265 and G.8265.1 Editorial change
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1673 ]
(Rev.1) |
Time transient build out and time offset response
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1672 ]
(Rev.1) |
The mixed SSM_PTP application for frequency synchronization
|
China
,
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1667 ]
(Rev.1) |
Proposal of the combination of jumping and sliding window
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1662 ]
(Rev.1) |
Comments on G.8260 latest draft
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1660 ]
(Rev.1) |
Proposal of 1pps as an external interface of PEC
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1659 ]
(Rev.1) |
Proposals on the validation of the PTP master
|
China
,
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1657 ]
(Rev.1) |
Proposals on the factors used for the master selection of time/phase sync
|
China
,
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1655 ]
(Rev.1) |
Analysis of selection window and oscillator
|
China
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1654 ]
(Rev.1) |
Analysis about timestamp process of PTP event packet
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1653 ]
(Rev.1) |
Proposal to emphasize the clarification for CBR40G jitter generation for STM-256 case in OTN equipment
|
China Unicom
|
Q9/15, Q13/15
|
2011-11-21 |
|
[ 1620 ]
(Rev.1) |
Proposal on the 1588v2 over OTN by OSC
|
FiberHome Technologies Group
,
ZTE Corporation
|
Q13/15, Q11/15
|
2011-11-19 |
|
[ 1617 ]
|
Withdrawn: Duplicate of C-1620
Withdrawn
|
FiberHome Technologies Group
,
ZTE Corporation
|
Q13/15, Q11/15
|
2011-11-19 |
|
[ 1607 ]
(Rev.1) |
Study of maximum absolute time error accumulation in a chain of Boundary Clocks with time filtering and with Physical Layer frequency assist
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1606 ]
(Rev.1) |
Simulation results regarding spectrum of time-stamping granularity error
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1605 ]
(Rev.1) |
Reduction of impact of time-stamping granularity noise on time transfer error
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1604 ]
(Rev.1) |
Sliding versus jumping windows
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1603 ]
(Rev.1) |
Floor Packet Population PDV limit for two-way methods
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1602 ]
(Rev.1) |
Test Case for 150us cluster and 200s window
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1601 ]
(Rev.1) |
Observations on the framework of Floor Population Metrics for PDV Limits
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1600 ]
(Rev.1) |
Developing a graphical understanding of floor population PDV metrics
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1599 ]
(Rev.1) |
Names and formulae for floor population metrics
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1597 ]
|
Observations regarding floor population percentage measurements
|
Anue Systems
|
Q13/15
|
2011-11-18 |
|
[ 1596 ]
(Rev.1) |
PDV network limit in G.8261.1
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1595 ]
(Rev.1-2) |
Intra-site Time Sync Requirements in G.8271
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1591 ]
(Rev.1-3) |
EEC with enhanced Holdover
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1589 ]
(Rev.1) |
Noise Generation in G.8263
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1587 ]
(Rev.1) |
Proposal for text concerning packet selection in G.8260
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1586 ]
(Rev.1) |
Discussion on reference points and network limits in G.8271
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1583 ]
(Rev.1) |
Proposal for network limits in G.8271
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1571 ]
(Rev.1) |
G.8263 : PEC-S-F state under limits of noise tolerance
|
Cisco Systems, Inc.
|
Q13/15
|
2011-11-18 |
|
[ 1570 ]
(Rev.1) |
Utilization of IP mapping for hop-by-hop BC model
|
Cisco Systems, Inc.
|
Q13/15
|
2011-11-18 |
|
[ 1569 ]
(Rev.1) |
Two-step clock issue with multicast transmission
|
Cisco Systems, Inc.
|
Q13/15
|
2011-11-18 |
|
[ 1564 ]
(Rev.1) |
Holdover specification in G.8263
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1563 ]
(Rev.1) |
Discussion on Architecture and BMC algorithm for the Time Sync Telecom Profile (G.8275 and G.8275.1)
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1561 ]
(Rev.1) |
PTP Mapping in the first Time Sync Telecom Profile (G. 8275.1)
|
Telefon AB - LM Ericsson
|
Q13/15
|
2011-11-18 |
|
[ 1538 ]
(Rev.1) |
Example of changes to G.8021 to support enhanced holdover
|
Ciena Canada
|
Q13/15
|
2011-11-17 |
|
[ 1535 ]
(Rev.1) |
Clean-up of G.8260 text
|
Zarlink Semiconductor
|
Q13/15
|
2011-11-17 |
|
[ 1534 ]
(Rev.1) |
Harmonization of cluster & percentile selection for clock emulation metrics
|
Zarlink Semiconductor
|
Q13/15
|
2011-11-17 |
Results:90 total items. Result page:
Previous -
1 -
2
|
Multiple Document Download: Formats and Languages to be included (when available):