Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1888 ]
|
G.8260: Request for clarification about the MAFE corner point
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1887 ]
|
G.8260: Comments on latest draft
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1886 ]
|
Transport of CPRI interface over OTN
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1885 ]
|
Proposal for reply to 3GPP liaison "Response to NGMN LS RP-110476 on coordination between ITU-T and 3GPP on synchronization"
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1884 ]
|
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing
|
Calnex Solutions Limited
,
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1883 ]
|
Y.1731 extension for Throughput Measurement
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q10/15
|
2011-11-22 |
|
[ 1882 ]
|
Model for Ethernet Remote Customer Service Interfaces
|
Huawei Technologies Co. Ltd.
|
Q12/15
|
2011-11-22 |
|
[ 1881 ]
|
Transport Entity Role Examples
|
Huawei Technologies Co. Ltd.
|
Q12/15
|
2011-11-22 |
|
[ 1880 ]
|
The proposal about service frame delivery in G.8011.4 and G.8011.2
|
China Telecommunications Corporation
|
Q10/15
|
2011-11-22 |
|
[ 1879 ]
|
Performance analysis of IEEE1588v2 time distribution through OTN Client signals when power restart and board reset
|
China Telecommunications Corporation
|
Q13/15
|
2011-11-22 |
|
[ 1878 ]
(Rev.1) |
Further Consideration of the Enhancement of LMM/LMR to support proactive LM
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q10/15
|
2011-11-22 |
|
[ 1877 ]
(Rev.1) |
Another EOTN Equipment Type in G.798.1
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1876 ]
(Rev.1) |
Correction of ODUkP_TT and ODUkT_TT function in G.798
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1875 ]
|
G.fast: On the Synchronous TDMA framing structure
|
ADTRAN
|
Q4/15
|
2011-11-22 |
|
[ 1874 ]
(Rev.1) |
G.vector: Initialization for Simultaneous Joining Lines
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1873 ]
(Rev.1) |
G.fast: Proposal to create an annex for mobile backhaul application
|
Telefon AB - LM Ericsson
|
Q4/15
|
2011-11-22 |
|
[ 1872 ]
(Rev.1) |
G.fast: TDD Frame Structure and Timing Overhead
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1871 ]
|
Comments on draft revised G.872
|
Deutsche Telekom AG
|
Q12/15
|
2011-11-22 |
|
[ 1870 ]
|
Hazard influence in telecommunications by VDSL2 technology
|
Brazil
|
Q4/15
|
2011-11-22 |
|
[ 1869 ]
(Rev.1) |
Proposal for a new recommendation G.wavereuse based on wavelength re-use
|
Finisar Corporation
,
LG-Ericsson
,
Telefon AB - LM Ericsson
|
Q6/15, Q2/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1868 ]
(Rev.1) |
G.fast: Point-to-Point Distribution is the Right Choice for G.fast
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1867 ]
(Rev.1) |
Ciena's views on Progressing work on Recs. G.8113.1 and G.8113.2
|
Ciena Corporation
|
Q12/15
|
2011-11-22 |
|
[ 1866 ]
(Rev.1) |
G.hnem: proposal of transmission parameters for extremely robust mode (ERM)
|
Yitran Communications Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1865 ]
(Rev.1) |
[G.fast] Clarification of BT requirement for SELT
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1864 ]
(Rev.1) |
G.fast: Equal-Length FEXT Measurements on PE05 Cable
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1863 ]
(Rev.1) |
G.hnem Proposal to update the PRBS seed values from which the preamble is generated
|
Yitran Communications Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1862 ]
(Rev.1) |
G.fast: Target Bit Error Rate of G.fast at Gamma Interface
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1861 ]
|
Withdrawn, duplicate - Superseded by C-1929
Withdrawn
|
Electronics and Telecommunications Research Institute (ETRI)
,
KT Corporation
,
LG-Ericsson
|
Q6/15
|
2011-11-22 |
|
[ 1860 ]
|
Withdrawn, duplicate of C-1863
Withdrawn
|
Yitran Communications Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1859 ]
(Rev.1) |
[G.fast] G.fast start-up using G.994.1
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1858 ]
|
Black Link related amendments to G.872
|
Deutsche Telekom AG
|
Q12/15
|
2011-11-22 |
|
[ 1857 ]
|
Architectural models of OTN transport services
|
Deutsche Telekom AG
|
Q12/15
|
2011-11-22 |
|
[ 1856 ]
|
Strong FEC for 40 Gbit/s Black Link applications
|
Deutsche Telekom AG
|
Q11/15
|
2011-11-22 |
|
[ 1855 ]
|
Rational for new low bit rate interfaces for the OTN
|
Deutsche Telekom AG
|
Q6/15, Q11/15
|
2011-11-22 |
|
[ 1854 ]
(Rev.1) |
Clarification questions on MCC PDU definition in Y.1731
|
Alcatel-Lucent Italia S.p.A.
|
Q10/15
|
2011-11-22 |
|
[ 1853 ]
(Rev.1) |
Alignment on dUNP between Y.1731 and G.8021
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15, Q14/15, Q10/15
|
2011-11-22 |
|
[ 1852 ]
|
Withdrawn
Withdrawn
|
Electronics and Telecommunications Research Institute (ETRI)
,
KT Corporation
,
LG-Ericsson
|
Q6/15
|
2011-11-22 |
|
[ 1851 ]
(Rev.1) |
Proposed clarifications for Ethernet CSF Description in Y.1731
|
Alcatel-Lucent Italia S.p.A.
|
Q10/15
|
2011-11-22 |
|
[ 1850 ]
(Rev.1) |
Proposed changes to G.8021 to avoid dLOC flapping
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15
|
2011-11-22 |
|
[ 1849 ]
|
Draft document of G.multi
|
Huawei Technologies Co. Ltd.
|
Q2/15
|
2011-11-22 |
|
[ 1848 ]
(Rev.1) |
Proposed relationship of security related ME/attributes and OMCI MIB audit/sync increment
|
China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q2/15
|
2011-11-22 |
|
[ 1847 ]
|
China Propose to make progress on MPLS-TP OAM Standardization
|
China
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1846 ]
|
Some parameters consideration in G.sup39
|
China
|
Q6/15
|
2011-11-22 |
|
[ 1845 ]
|
Create a new recommendation about "Field Mountable optical fibre Connector"
|
China
|
Q7/15
|
2011-11-22 |
|
[ 1844 ]
|
Requirements for L0/L1/L2 Multi-layer Convergence Network
|
China
,
China Mobile Communications Corporation
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1843 ]
|
G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results
|
China
,
China Mobile Communications Corporation
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1842 ]
|
Providing experience and information for ITU-T new recommendation L.xxx
|
China
|
Q16/15
|
2011-11-22 |
|
[ 1841 ]
|
Proposal of RS422 1PPS time/phase as a time measurement interface
|
China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q13/15
|
2011-11-22 |
|
[ 1840 ]
|
G.8032 ERP as a sub-type of G.8011.5 EPLAN and of G.8011.3 EVPLAN types 1, 2, and 3
|
Alcatel-Lucent Bell N.V.
|
Q10/15
|
2011-11-22 |
|
[ 1839 ]
|
Proposed modifications to draft G.8032v3
|
AimValley BV
,
Alcatel-Lucent Bell N.V.
|
Q9/15
|
2011-11-22 |
Results:420 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):