International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-02-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-02-14) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:119 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
Contributions  [ AI/Question: Q9/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1322 ]  
 
Comments on ETH-CSF reception process in G.8021     Fujitsu   Q9/15   2011-02-01
[ 1321 ]  
 
Proposal to study on the protection for interconnected OTN rings     Fujitsu   Q9/15   2011-02-01
[ 1320 ]  
 
Comments and proposed modification on draft G.873.2     Fujitsu   Q9/15   2011-02-01
[ 1319 ]  
 
PCSL error control block insertion and BIP8 transparency for 100GBASE-R/ODU4     Fujitsu , CIAJ , Hitachi , Mitsubishi , NEC   Q9/15, Q11/15   2011-02-01
[ 1318 ]  
 
Proposed updates for G.798     Fujitsu   Q9/15   2011-02-01
[ 1317 ]  
 
Proposed updates for clause 6.5 in G.806     Fujitsu   Q9/15   2011-02-01
[ 1315 ]  
 
Comments on the Recommendation-dependency in G.8121/Y.1381     Hitachi   Q9/15   2011-02-01
[ 1314 ]  
(Rev.1) 
Comments on the progress of G.ptneq (G.8060) standardization     Hitachi   Q9/15   2011-02-01
[ 1312 ]  
 
Consideration of alignment of PTN Recommendations     Hitachi   Q9/15   2011-02-01
[ 1308 ]  
 
Reporting of results for pro-active measurement using SLM     Cisco , AT&T   Q9/15   2011-02-01
[ 1305 ]  
 
Procedural issues on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-02-01
[ 1303 ]  
 
Inter SDO Cooperation on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5   2011-02-01
[ 1301 ]  
 
Operator Requirements for MPLS-TP OAM     Verizon , BT , France Telecom Orange , Qwest , Telenor , Telstra   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1300 ]  
 
Rationale to support Test ID in Delay Measurement in Y.1731 and G.8021     Verizon , AT&T   Q9/15, Q10/15   2011-02-01
[ 1299 ]  
 
Comments on content of clauses 8 and 9 of G.tpoam     Cisco , Juniper , Verizon   Q9/15, Q10/15   2011-02-01
[ 1298 ]  
 
MPLS-TP OAM - issues with the proposed Y.1731 based OAM solution     Juniper Networks , Cisco , NSN , Verizon   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1295 ]  
 
Models in G.8010     Huawei , Deutsche Telekom   Q9/15, Q14/15, Q12/15   2011-02-01
[ 1294 ]  
 
G.8021 and G.8031 text to configure SD-triggered linear protection switching     Alcatel-Lucent USA   Q9/15   2011-02-01
[ 1293 ]  
 
Comments and suggestions on proposed new Appendix XI for ITU-T Rec. G.8032     Alcatel-Lucent USA   Q9/15   2011-02-01
[ 1290 ]  
 
Reporting of results for pro-active measurement using SLM     Cisco , AT&T   Q9/15   2011-02-01
[ 1281 ]  
 
Proposed texts for G.smp     ZTE   Q9/15   2011-01-31
[ 1280 ]  
 
Automatic Protection Switching (APS) protocol for Shared Mesh Protection     ZTE   Q9/15   2011-01-31
[ 1273 ]  
 
Issues with TCM section monitoring and CA     Alcatel-Lucent Germany   Q9/15   2011-01-31
[ 1271 ]  
 
Correction of mistakes in ODU connection function processes in G.798     Alcatel-Lucent Germany   Q9/15   2011-01-31
[ 1269 ]  
 
Proposed text for inclusion in Y.1731 for Frame Loss Measurement     Huawei   Q9/15, Q10/15   2011-01-31
[ 1257 ]  
 
Propose a latency measurement model of equipment     ZTE   Q9/15   2011-01-31
[ 1248 ]  
 
PTN GACh+Y.1731 OAM interoperability test activities and result     CATR , China Mobile   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1247 ]  
 
Support for the consent of G.8110.1 and G.tpoam     China MIIT   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1243 ]  
 
Comments on the extension of proactive loss measurement in Y.1731/G.8021     NEC , Hitatchi   Q9/15, Q10/15   2011-01-31
[ 1239 ]  
 
Proposed clarification of ETH-CSF specification in Y.1731     NEC   Q9/15, Q10/15   2011-01-31
[ 1238 ]  
 
The end-to-end service resilience with combination of G.8032 and STP     NEC   Q9/15   2011-01-31
[ 1237 ]  
 
Consideration of SD triggered Protection Switching in G.8031     NEC   Q9/15   2011-01-31
[ 1236 ]  
 
Proposed modifications to ETH-SLM processes in G.8021     NEC   Q9/15   2011-01-31
[ 1210 ]  
 
The support of OSC transmition 1588V2 in OTN/G.798.1     Fiberhome Technologies Group , China Academy of Telecommunication Research   Q9/15, Q13/15, Q11/15   2011-01-31
[ 1209 ]  
 
OAM for G.ptneq     NSN   Q9/15   2011-01-31
[ 1208 ]  
(Rev.1) 
Non-ERP node in ring (G.8032)     ZTE , China   Q9/15   2011-01-31
[ 1207 ]  
 
Support for consent of G.tpoam     ZTE , Alcatel-Lucent Shanghai Bell , Fiberhome , Huawei   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1199 ]  
 
1DM checking and DMR generation     Alcatel-Lucent USA   Q9/15, Q10/15   2011-01-31
[ 1196 ]  
 
Application of EOTN within MEF Global Interconnect     Huawei   Q9/15, Q10/15   2011-01-31
[ 1193 ]  
 
Proposal to add 1+1 CL-SNCG/I to G.808.1     Huawei   Q9/15   2011-01-31
[ 1192 ]  
 
Proposed specification for ODUkP/ETH-m_A function     Huawei   Q9/15   2011-01-31
[ 1191 ]  
 
Proposed specification for ETH/ETH-mi_A function     Huawei   Q9/15   2011-01-31
[ 1190 ]  
 
Proposed specification for ETH/ETH-eai_A and ETH/ETH-meai_A functions     Huawei   Q9/15   2011-01-31
[ 1189 ]  
 
Proposed specification for ETH/ETH-ea_A and ETH/ETH-mea_A functions     Huawei   Q9/15   2011-01-31
[ 1187 ]  
 
Considerations about new functions on OTN equipment     China United Network Communications Group   Q9/15   2011-01-31
[ 1173 ]  
 
G.8032 Appendix     Ericsson Canada   Q9/15   2011-01-31
[ 1172 ]  
 
RingID for identifying R-APS     Ericsson Canada   Q9/15   2011-01-31
[ 1171 ]  
 
Comments on G.8010 Amendment 2     Ericsson Canada   Q9/15, Q12/15   2011-01-31
[ 1170 ]  
 
1:1 path protection capable of load sharing for G.8031     Ericsson Canada   Q9/15   2011-01-31
[ 1169 ]  
 
Proposal to align G.8021 with IEEE 802.1Q ingress VID filtering     Ericsson Canada   Q9/15, Q12/15   2011-01-31
Results:119 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-16