International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-02-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-02-14) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:83 total items.
Result page:  Previous -  1 - 2
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1265 ]  
 
LTE-Advanced Coordinated Multi-point (CoMP) Time/phase accuracy requirements for ITU-T Q13/15 (G.827x)     Deutsche Telekom   Q13/15   2011-01-31
[ 1264 ]  
 
Need for EEC chain hold-over management     Deutsche Telekom   Q13/15   2011-01-31
[ 1259 ]  
 
Proposal for the scope of the Recommendation G.8272     IDT   Q13/15   2011-01-31
[ 1235 ]  
 
Proposal on maximum PTP clock number in the time reference model     CMCC , CATR , ZTE   Q13/15   2011-01-31
[ 1234 ]  
 
TOD specification     CMCC , CATR , Huawei , ZTE   Q13/15   2011-01-31
[ 1233 ]  
 
PTP frequency sync with partial timing support     ZTE   Q13/15   2011-01-31
[ 1232 ]  
 
Proposals on the BC simulation model in G.8273     ZTE   Q13/15   2011-01-31
[ 1219 ]  
 
G.827x Renumbering     RAD Data Communications   Q13/15   2011-01-31
[ 1218 ]  
 
Grandmaster Clock Functional Model     RAD Data Communications   Q13/15   2011-01-31
[ 1217 ]  
 
Telecom Boundary Clock Functional Model     RAD Data Communications   Q13/15   2011-01-31
[ 1216 ]  
 
Aspects of Time Distribution over GPON     RAD Data Communications   Q13/15   2011-01-31
[ 1215 ]  
 
G.827x 1 pps output specification: Minimum requirements - A vendor perspective     RAD Data Communications   Q13/15   2011-01-31
[ 1214 ]  
 
New Quality Level for Synchronous Ethernet     RAD Data Communications   Q13/15   2011-01-31
[ 1213 ]  
 
PTP Clocks Simulation Models     RAD Data Communications   Q13/15   2011-01-31
[ 1212 ]  
 
Noise Sources in Time Distribution Schemes     RAD Data Communications   Q13/15   2011-01-31
[ 1210 ]  
 
The support of OSC transmition 1588V2 in OTN/G.798.1     Fiberhome Technologies Group , China Academy of Telecommunication Research   Q9/15, Q13/15, Q11/15   2011-01-31
[ 1188 ]  
 
A simple model for the PDV introduced in a packet-switching NE     Anue Systems   Q13/15   2011-01-31
[ 1185 ]  
 
The requirements of time/phase synchronization over SDH interface     China Unicom , Huawei   Q13/15   2011-01-31
[ 1182 ]  
 
Time of Day Interfaces     Zarlink Semiconductor   Q13/15   2011-01-31
[ 1181 ]  
 
Equivalence of percentile-selection and time-selection [G.8260]     Zarlink Semiconductor   Q13/15   2011-01-31
[ 1180 ]  
 
Usefulness of MTIE mask for PPS output from BC/PRTC     Zarlink Semiconductor   Q13/15   2011-01-31
[ 1179 ]  
 
Packet Selected PDV metric for frequency transfer [G.8260]     Zarlink Semiconductor   Q13/15   2011-01-31
[ 1178 ]  
 
How cluster selection metric may fulfill packet metrics requirements     Zarlink Semiconductor   Q13/15   2011-01-31
[ 1177 ]  
 
Diagram for metric's model flow [G.8260]     Zarlink Semiconductor   Q13/15   2011-01-31
[ 1176 ]  
 
Comparison of pkt selected MTIE and MATIE     Zarlink Semiconductor   Q13/15   2011-01-31
[ 1166 ]  
 
Comparison of J.211 and Synchronous Ethernet/IEEE 1588     Zarlink Semiconductor   Q13/15   2011-01-31
[ 1163 ]  
 
Proposal for a structure for the Recommendation ITU-T G.8272     IDT   Q13/15   2011-01-31
[ 1162 ]  
 
Proposal for the scope of the Recommendation ITU-T G.8273     IDT   Q13/15   2011-01-31
[ 1134 ]  
 
Revised Clause 6.1 in G.8271     Ericsson   Q13/15   2011-01-28
[ 1120 ]  
 
Fiber link asymmetry compensation     Ericsson   Q6/15, Q13/15   2011-01-27
[ 1103 ]  
 
Withdrawn: Corrections to Recommendation ITU-T G.8262 (2010)     Calnex Solutions   Q13/15   2011-01-24
[ 1102 ]  
 
Specifying a Boundary Clock performance     Calnex Solutions   Q13/15   2011-01-24
[ 1101 ]  
 
Clarification proposal to draft Metrics Appendix text in WD107     Calnex Solutions   Q13/15   2011-01-24
Results:83 total items.
Result page:  Previous -  1 - 2  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-21