International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-02-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-02-14) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:418 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1468 ]  
 
Transitional Link attributes for optical transponders and 3R regenerators in the OTN     Alcatel-Lucent   Q14/15, Q12/15   2011-02-02
[ 1467 ]  
(Rev.1) 
Allocation and assignment of experimental and non-standard code points     United States of America   Q10/15   2011-02-02
[ 1466 ]  
 
G.hnem: Proposal for the text update of Annex C     Lantiq AEG   Q4/15   2011-02-02
[ 1465 ]  
(Rev.1) 
USA on Consent of Draft Recommendation G.tpoam     United States of America   Q10/15   2011-02-02
[ 1464 ]  
 
G.hnem: Informative Appendix to describe use cases and installation examples     Lantiq AEG   Q4/15   2011-02-02
[ 1463 ]  
 
Wavelength conversion in reconfigurable multi-degree optical nodes     Deutsche Telekom   Q7/15   2011-02-02
[ 1462 ]  
 
Considerations on transverse compatibility for systems according to G.698.2     Deutsche Telekom   Q6/15   2011-02-02
[ 1461 ]  
 
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications"     NSN   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1460 ]  
 
G.gen: G.vdsl: G.hn: On the feasibility of a low complexity G.hn based FTTdp solution     CopperGate Communications   Q4/15   2011-02-02
[ 1459 ]  
 
G.8260: comments on WD107 from Edinburgh interim meeting (PDV metrics)     France Telecom , Tellabs   Q13/15   2011-02-02
[ 1458 ]  
 
Network PDV accumulation study with "end-to-end" data traffic model     France Telecom   Q13/15   2011-02-02
[ 1457 ]  
 
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented     France Telecom   Q13/15   2011-02-02
[ 1456 ]  
 
G.8272: comments on PRTC limits proposal     France Telecom   Q13/15   2011-02-02
[ 1455 ]  
 
G.8263: testing methodology for the PDV tolerance of a packet slave clock     France Telecom   Q13/15   2011-02-02
[ 1454 ]  
 
G.8261.1: Hypothetical Reference Models proposal     France Telecom   Q13/15   2011-02-02
[ 1453 ]  
 
G.8261.1: Preliminary proposal of PDV network limits for the HRM-1     France Telecom   Q13/15   2011-02-02
[ 1452 ]  
 
Possible locations of external phase/time interfaces in a phase/time distribution chain based on Boundary Clocks     France Telecom   Q13/15   2011-02-02
[ 1451 ]  
 
Analysis of phase/time distribution over OTN networks     France Telecom   Q9/15, Q13/15, Q11/15   2011-02-02
[ 1450 ]  
 
Proposal of a Working Document from Q13 to Q2, Q4 and Q11 reflecting the current status of the work in Q13 on phase/time synchronization     France Telecom   Q13/15   2011-02-02
[ 1449 ]  
 
Further consideration of requirements for on-demand segment monitoring in MPLS-TP     NTT , Telecom Italia   Q12/15, Q10/15   2011-02-02
[ 1448 ]  
 
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP     NTT   Q12/15, Q10/15   2011-02-02
[ 1447 ]  
 
Proposal for additional delay measurement functions in MPLS-TP OAM     NTT   Q9/15, Q14/15, Q10/15   2011-02-02
[ 1446 ]  
 
Proposal of adding topic of Timing and Synchronization Aspects of Packet Networks in OTNT SWP     NTT   Q3/15, Q13/15   2011-02-02
[ 1445 ]  
 
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions     ISOC   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1444 ]  
 
G.hn: corrections to Tunnel termination for a corrigendum to G.9961     CopperGate Communications   Q4/15   2011-02-02
[ 1443 ]  
 
G.hn: Handling multicast traffic in G.hn     CopperGate Communications   Q4/15   2011-02-02
[ 1442 ]  
 
G.hn: Differentiate between DLL multicast traffic and PHY multicast traffic in G.hn     CopperGate Communications   Q4/15   2011-02-02
[ 1441 ]  
 
Withdrawn: MPLS-TP Standards     BT   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1440 ]  
 
Second generation ETH MEP and MIP functions     Huawei   Q9/15   2011-02-02
[ 1439 ]  
 
Comments on differentiation of MPLS-TP environments     NSN   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1438 ]  
 
G.gen: G.vdsl: G.ploam: Ambiguity of SES and UAS during re-initialization     Alcatel-Lucent Bell N.V.   Q4/15   2011-02-02
[ 1437 ]  
 
G.vdsl: Re-Initialization Policies: Proposed changes to working text for G.993.2     Alcatel-Lucent Bell N.V.   Q4/15   2011-02-02
[ 1436 ]  
 
Control elements for BMCA in telecom     NSN   Q13/15   2011-02-02
[ 1435 ]  
 
MATIE, MTIE, and MAFE graphs into metrics definitions     NSN   Q13/15   2011-02-02
[ 1434 ]  
 
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"     CopperGate Communications   Q4/15   2011-02-02
[ 1433 ]  
 
G.hn: Proposed Annex for extension of G.hn for optical transmission media     CopperGate Communications   Q4/15   2011-02-02
[ 1432 ]  
 
G.hn: Backup Domain master related corrigendum items for G.9961     CopperGate Communications   Q4/15   2011-02-02
[ 1431 ]  
 
G.hn: Corrigendum items for G.9961     CopperGate Communications   Q4/15   2011-02-02
[ 1430 ]  
 
G.hn: Update of the text for the "symbol boosting" mechanism     CopperGate Communications   Q4/15   2011-02-02
[ 1429 ]  
 
G.hn: Orthogonal preambles for the Neighbour domain interference mitigation (NDIM) mechanism     CopperGate Communications   Q4/15   2011-02-02
[ 1428 ]  
 
G.hn: MIMO transmission scheme for PHY frames and signals other than 'frames where the payload is intended only for MIMO receivers', for G.hn-MIMO     CopperGate Communications   Q4/15   2011-02-02
[ 1427 ]  
 
G.hn: Update of the "modulation of unloaded subcarriers" text of G.hn-MIMO     CopperGate Communications   Q4/15   2011-02-02
[ 1426 ]  
 
G.hn: Channel estimation protocol for G.hn-MIMO     CopperGate Communications   Q4/15   2011-02-02
[ 1425 ]  
 
G.hn: Update of the text of 'Tx ports mapping' for G.hn-MIMO     CopperGate Communications   Q4/15   2011-02-02
[ 1424 ]  
 
Treatment of delay jumps in PDV data     NSN   Q13/15   2011-02-02
[ 1423 ]  
 
Draft baseline text describing the Alternative Electrical Length Estimation Method (AELEM)     BT   Q4/15   2011-02-01
[ 1422 ]  
 
G.adsl: G.vdsl : Low Power Modes for Remote VDSL2 Nodes     BT   Q4/15   2011-02-01
[ 1421 ]  
 
G.VDSL: INM INPEQ Histogram     BT   Q4/15   2011-02-01
[ 1420 ]  
 
Functional model of HAO     Huawei   Q9/15, Q11/15   2011-02-01
[ 1419 ]  
 
G.VDSL: INM IAT Histogram     BT   Q4/15   2011-02-01
Results:418 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-27