Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 288 ]
|
Proposals on optical attenuator parameters in G.671
|
ZTE Corporation, China
|
Q7/15
|
2008-11-23 |
|
[ 287 ]
|
Proposal on PDL and PMD parameters in G.671
|
ZTE Corporation, China
|
Q7/15
|
2008-11-23 |
|
[ 286 ]
|
Proposals to Add Coordination Between Source and Destination to section 6.2 of G.7713
|
ZTE Corporation
|
Q14/15
|
2008-11-23 |
|
[ 285 ]
|
Comments to G.8152
|
ZTE Corporation
|
Q14/15
|
2008-11-23 |
|
[ 284 ]
|
Comments to G.8052
|
ZTE Corporation
|
Q14/15
|
2008-11-23 |
|
[ 283 ]
|
Add "central frequency deviation" parameter for transmitter in G.698.2
|
ZTE
|
Q6/15
|
2008-11-23 |
|
[ 282 ]
|
G.lt: Time-varying interference measurement and characterisation
|
BT
|
Q4/15
|
2008-11-23 |
|
[ 281 ]
|
G.hn: Proposal for maximum wideband transmit power
|
Infineon Technologies AG
|
Q4/15
|
2008-11-23 |
|
[ 280 ]
|
G.hn: Proposal for text describing G.hn threat model
|
Infineon Technologies AG
|
Q4/15
|
2008-11-23 |
|
[ 279 ]
|
G.8032 protection switching transient traffic performance requirement for next study period
|
ETRI (Republic of Korea)
|
Q9/15
|
2008-11-23 |
|
[ 278 ]
|
FDB-delete scheme for fast protection switching in G.8032 Ethernet ring protection
|
ETRI (Korea, Republic of)
|
Q9/15
|
2008-11-23 |
|
[ 277 ]
|
Creation of a new TLV in ESMC channel in order to transport frequency stability level information
|
France Télécom, Tellabs
|
Q13/15
|
2008-11-23 |
|
[ 276 ]
|
Proposed text for drafting of PTPv2 telecom profile frequency-oriented
|
France Télécom, Tellabs
|
Q13/15
|
2008-11-23 |
|
[ 275 ]
|
Discussion about the use of "Announce" and "Management" messages for PTPv2 telecom profile frequency-oriented
|
France Télécom, Tellabs
|
Q13/15
|
2008-11-23 |
|
[ 274 ]
|
Standards for 112 Gbit/s serial transmission
|
Telecom Italia
|
Q6/15
|
2008-11-23 |
|
[ 273 ]
|
Study items for Q6/15
|
Italy
|
Q6/15
|
2008-11-23 |
|
[ 272 ]
|
Naming Considerations regarding T-MPLS and MPLS-TP within ITU-T
|
Alcatel-Lucent Italia, Alcatel Shanghai Bell, Ital
|
Q9/15, Q3/15, Q11/15
|
2008-11-23 |
|
[ 271 ]
|
Restoration exercise
|
ZTE Corporation
|
Q14/15, Q12/15
|
2008-11-23 |
|
[ 270 ]
|
Document withdrawn (See C89)
|
Italy
|
Q6/15
|
2008-11-23 |
|
[ 269 ]
|
G.hn: Profiles
|
CopperGate Communications
|
Q4/15
|
2008-11-21 |
|
[ 268 ]
|
G.hn: Proposal for fixed window setting
|
Infineon Technologies AG
|
Q4/15
|
2008-11-21 |
|
[ 267 ]
|
G.hn: Proposal to associate EVM values with the transmit power levels
|
Infineon Technologies AG, DS2
|
Q4/15
|
2008-11-21 |
|
[ 266 ]
|
Withdrawn
|
N/A
|
|
1753-01-01 |
|
[ 265 ]
|
G.vector: Proposal for a frequency division multiplexing scheme for pilot sequences and sync-flags
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2008-11-21 |
|
[ 264 ]
|
G.lt: Update to SELT-P draft text
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2008-11-21 |
|
[ 263 ]
|
Ghn: PLC Passband OFDM Parameters Proposal
|
Gigle Semiconductor
|
Q4/15
|
2008-11-21 |
|
[ 262 ]
|
G.INP: Further Details on Error Monitoring, OAM and Traffic Differentiation with the Unified Retransmission Method
|
Infineon Technologies AG
|
Q4/15
|
2008-11-21 |
|
[ 261 ]
|
G.hn: Proposal to use a single indexing rule
|
Infineon Technologies AG
|
Q4/15
|
2008-11-21 |
|
[ 260 ]
|
Proposal to specify Failure of Protocol defects for the R-APS protocol
|
Lucent Technologies, Inc - AimValley BV
|
Q9/15
|
2008-11-21 |
|
[ 259 ]
|
G.hn: Proposal for a multi-mode FEC scheme
|
France Telecom, Spidcom Technologies, Gigle Semico
|
Q4/15
|
2008-11-21 |
|
[ 258 ]
|
G.inp: Limitations of the PMS-TC Retransmisssion Scheme
|
Infineon Technologies AG
|
Q4/15
|
2008-11-21 |
|
[ 257 ]
|
Proposed change in Draft Annex to G.709 for transcoding via 512B/513B
|
NTT
|
Q11/15
|
2008-11-21 |
|
[ 256 ]
|
Notification of IPR statement submission
|
DS2
|
Q4/15
|
2008-11-21 |
|
[ 255 ]
|
G.lt: Communications Channel Extension for Measurement Data Retrieval
|
BT
|
Q4/15
|
2008-11-21 |
|
[ 254 ]
|
Solution of fast GPON switching in long-reach PON scenario
|
Huawei technologies
|
Q2/15
|
2008-11-21 |
|
[ 253 ]
|
Proposal to support phase synchronization in GPON system
|
Huawei technologies Co., LTD
|
Q2/15
|
2008-11-21 |
|
[ 252 ]
|
Proposal to support ONT survival time attribute in G.984.4
|
Huawei technologies Co., LTD
|
Q2/15
|
2008-11-21 |
|
[ 251 ]
|
Proposal on Continuous Mode of LR-PON
|
Huawei Technologies Co., Ltd. RAD Data communicati
|
Q2/15
|
2008-11-21 |
|
[ 250 ]
|
Proposed text for ODU3ye/OTU3ye in supplement
|
Japan
|
Q11/15
|
2008-11-21 |
|
[ 249 ]
|
Corrigendum for G.709 correcting small mistake and inconsistency with G.798
|
Alcatel Lucent Germany
|
Q9/15, Q11/15
|
2008-11-21 |
|
[ 248 ]
|
Ghn: EVM Requirements Proposal
|
Gigle Semiconductor
|
Q4/15
|
2008-11-21 |
|
[ 247 ]
|
Proposal to include additional PMD-related parameters in the 40G and 100G modulation format comparison documents
|
Deutsche Telekom
|
Q7/15, Q6/15
|
2008-11-21 |
|
[ 246 ]
|
G.lt: Proposal for modifications to the "Loop Topology with cable-type identification" table in SELT
|
Ericsson AB
|
Q4/15
|
2008-11-21 |
|
[ 245 ]
|
Consideration of OTU4 FEC requirements
|
Alcatel Lucent
|
Q11/15
|
2008-11-21 |
|
[ 244 ]
|
Proposal for adding timing transparency to GFP (G.7041) mapping and its variant as given in G.Sup43 Clause 7.3 for 10GBase-R
|
Alcatel - Lucent Germany
|
Q11/15
|
2008-11-21 |
|
[ 243 ]
|
Considerations about Implementation friendly justification procressing of mapping of data into ODU4
|
Alcatel - Lucent Germany
|
Q11/15
|
2008-11-21 |
|
[ 242 ]
|
G.hn: Compression formats for the Ack message
|
DS2
|
Q4/15
|
2008-11-21 |
|
[ 241 ]
|
G.hn: Re-synchronization in STXOPs with CFTS
|
DS2
|
Q4/15
|
2008-11-21 |
|
[ 240 ]
|
G.hn: Preamble windowing in PLC
|
DS2
|
Q4/15
|
2008-11-21 |
|
[ 239 ]
|
Additional PM Objects for EoT NE Information Model G.8052
|
Deutsche Telekom and Alcatel-Lucent
|
Q14/15
|
2008-11-21 |
Results:338 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):