International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : NGN-GSI : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T NGN-GSI  C 

ITU-T NGN-GSI

NGN Global Standards Initiative

Study Period 2009

Results:136 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
Contributions  [ AI/Question: Q3/13 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 851 ]  
 
Comments on NGN-SIDE functional framework     France Telecom   Q3/13   2010-08-27
[ 848 ]  
 
Proposed modification of Y.iptv-netcontrol-fw     ETRI   Q3/13   2010-08-27
[ 831 ]  
 
Proposed text of Draft Recommendation Y.miptv-req, Functional Requirements of Mobile IPTV (July 2010)     ETRI   Q3/13   2010-08-27
[ 804 ]  
 
Y.NGN-SIDE-Proposal to clean-up Appendix II     ZTE Corporation   Q3/13   2010-08-27
[ 803 ]  
 
Y.NGN-SIDE-Proposal to clarify M2M & USN with use case and harmonize all related text     ZTE Corporation   Q3/13   2010-08-27
[ 802 ]  
 
Y.NGN-SIDE-Proposal to align Appendix V with normative text     ZTE Corporation   Q3/13   2010-08-27
[ 801 ]  
 
Y.NGN-SIDE-Proposal to add cloud requirements, use case and harmonize all related text     ZTE Corporation   Q3/13   2010-08-27
[ 800 ]  
 
Y.NGN-SIDE-Proposal to add acronyms and references     ZTE Corporation   Q3/13   2010-08-27
[ 767 ]  
 
Proposal to solve the Editor's note at the beginning of clause 9     ZTE Corporation   Q3/13   2010-08-27
[ 766 ]  
 
Proposal to solve Editor's Notes in section 8.2     ZTE Corporation   Q3/13   2010-08-27
[ 765 ]  
 
Proposal to rename service integration function     ZTE Corporation   Q3/13   2010-08-27
[ 764 ]  
 
Proposal to relate term "NGN-SIDE" with other similar terminology     ZTE Corporation   Q3/13   2010-08-27
[ 763 ]  
 
Proposal to rectify Appendix III     ZTE Corporation   Q3/13   2010-08-27
[ 762 ]  
 
Proposal to fix glitches in section 6.2     ZTE Corporation   Q3/13   2010-08-27
[ 761 ]  
 
Proposal to clarify use of REST&SOAP in section 8.1.9     ZTE Corporation   Q3/13   2010-08-27
[ 760 ]  
 
Clarify UE-hosed application     ZTE Corporation   Q3/13   2010-08-27
[ 759 ]  
 
Proposal to clarify the strength of usage of APIs     ZTE Corporation   Q3/13   2010-08-27
[ 758 ]  
 
Proposal to clarify strategic direction of NGN-OSE and NGN-SIDE     ZTE Corporation   Q3/13   2010-08-27
[ 757 ]  
 
Proposal to clarify SIDE position in NGN and complete figure 3     ZTE Corporation   Q3/13   2010-08-27
[ 756 ]  
 
Proposal to clarify scope     ZTE Corporation   Q3/13   2010-08-27
[ 755 ]  
 
Proposal to clarify capability definition and mitigate its use in the draft Recommendation     ZTE Corporation   Q3/13   2010-08-27
[ 754 ]  
 
Proposal to clarify business model     ZTE Corporation   Q3/13   2010-08-27
[ 753 ]  
 
Proposal to analyze and handle appendix IV     ZTE Corporation   Q3/13   2010-08-27
[ 752 ]  
 
Proposal to align requirements in section 7 with text in clauses 6 and 8     ZTE Corporation   Q3/13   2010-08-27
[ 751 ]  
 
Proposal to add summary and keywords     ZTE Corporation   Q3/13   2010-08-27
[ 750 ]  
 
Proposal to add high level adaptor figure in section 8.2     ZTE Corporation   Q3/13   2010-08-27
[ 749 ]  
 
Proposal to add description of online offline design tools and charging capabilities of Y.NGN-SIDE-Req     ZTE Corporation   Q3/13   2010-08-27
[ 739 ]  
 
Proposed modification of Draft Recommendation Y.miptv-req     ETRI   Q3/13   2010-08-26
[ 716 ]  
 
A Proposal for Study on functional architecture of NGN service integration and delivery environment (Y.NGN-SIDE-Arch)     China Telecom , ZTE Corporation   Q5/13, Q3/13   2010-08-25
[ 715 ]  
 
A Proposal on initiating a new work item of Service requirements for Machine-oriented Communications     China Telecom   Q3/13   2010-08-25
[ 681 ]  
 
Comparisons of capabilities between NGN OSE and NGN SIDE     ETRI   Q5/13, Q3/13   2010-08-25
[ 573 ]  
 
Service enablers in SIDE     ZTE Corporation   Q3/13   2010-01-11
[ 572 ]  
 
Scenarios of XaaS and relationship with SIDE     ZTE Corporation   Q3/13   2010-01-11
[ 571 ]  
 
Scenarios concerning integration of web mechanisms in SIDE     ZTE Corporation   Q3/13   2010-01-11
[ 570 ]  
 
Service enablers in SIDE     ZTE Corporation   Q3/13   2010-01-11
[ 569 ]  
 
Service enablers in SIDE     ZTE Corporation   Q3/13   2010-01-11
[ 568 ]  
 
Proposed modifications to clause 8 of Y.NGN-MCC     ZTE Corporation , China Telecom   Q3/13   2010-01-11
[ 536 ]  
 
Study the interfaces requirement of Y.NGN-SIDE_req     ZTE Corporation   Q3/13   2010-01-11
[ 535 ]  
 
Study of service broker and clarification in Y.NGN-SIDE-Req     ZTE Corporation   Q3/13   2010-01-11
[ 534 ]  
 
Scenario of service integration in Y.NGN-SIDE-Req     ZTE Corporation   Q3/13   2010-01-11
[ 528 ]  
 
Proposed Modification of Functional Architecture in Y.2233Rev.1     ETRI , Korea Telecom   Q3/13   2010-01-11
[ 527 ]  
 
Proposed Changes and Comments on Editor's Notes in Y.2233Rev.1     ETRI , Korea Telecom   Q3/13   2010-01-11
[ 526 ]  
 
Proposed Changes in Y.2111Amd     ETRI , Korea Telecom   Q4/13, Q3/13   2010-01-11
[ 525 ]  
 
Proposed Modifications on the Accounting and Charging Scenarios in Y.2233Rev.1     ETRI , Korea Telecom   Q3/13   2010-01-11
[ 515 ]  
 
Initiation on Identification Framework for IPTV services     ETRI   Q3/13   2010-01-08
[ 472 ]  
 
Some proposal for the functional architecture of Y.NGN-SIDE-req     China Telecom   Q3/13   2010-01-08
[ 471 ]  
 
Proposal for modification of generic requirements of Y.NGN-SIDE-req     China Telecom   Q3/13   2010-01-08
[ 457 ]  
 
Proposed modifications to fix open issues and editor's notes in Y.NGN-MCC     China Telecom , ZTE   Q3/13   2010-01-08
[ 456 ]  
 
Proposed editorial modifications to Y.NGN-MCC draft Recommendation     China Telecom , ZTE   Q3/13   2010-01-08
[ 451 ]  
 
Possible solutions for the living list for Y.NGN-R2-Reqts     Softbank BB Corp   Q3/13   2010-01-08
Results:136 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-13