Delayed Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 39 ]
|
Proposed intersignal delay timer for SigList
|
Nortel Networks (USA)
|
Q3/16
|
2004-11-05 |
|
[ 38 ]
|
Reaffirmation of Q.3 consensus on "call finished" signal in H.248.STIMAL
|
United States of America
|
Q3/16
|
2004-11-05 |
|
[ 37 ]
|
Proposed text for the Generation of Share Secret Key in Selective Routed Call Scenarios
|
ZTE Corporation
|
Q25/16
|
2004-11-05 |
|
[ 36 ]
|
Proposed Method of Generating a Share Secret Key between the Caller and the Callee in Multiple Administration Domains
|
ZTE Corporation
|
Q25/16
|
2004-11-05 |
|
[ 35 ]
|
Proposed text for the negotiation of security protocols to protect H.225.0 Call Signalling Messages
|
ZTE Corporation, CATR of MII
|
Q25/16
|
2004-11-05 |
|
[ 34 ]
|
The Requirements for Network Address Translator Traverse of H.323 Multimedia Systems
|
CATR of MII, Huawei Technologies Co. Ltd, ZTE, SBE
|
Q5/16
|
2004-11-05 |
|
[ 33 ]
|
Corrections to G.729 Annex B
|
Alcatel France
|
Q10/16
|
2004-11-03 |
|
[ 32 ]
|
Fast session setup extensions to H.324
|
Dilithium Networks, USA
|
Q2/16, Q3/16, Q1/16
|
2004-11-03 |
|
[ 31 ]
|
Location Number for H.323
|
France Telecom
|
Q3/16, Q2/16
|
2004-11-03 |
|
[ 30 ]
|
Approach for EV Codec Development
|
Texas Instruments, Incorporated
|
Q9/16
|
2004-11-03 |
|
[ 29 ]
|
EV Codec Bandwidth and Sampling-Rate Configurations
|
Texas Instruments, Incorporated
|
Q9/16
|
2004-11-03 |
|
[ 28 ]
|
H.235 smoothed NAT/ALG/SBC traversal
|
Siemens AG
|
Q25/16, Q5/16, Q2/16
|
2004-11-03 |
|
[ 27 ]
|
Documentation of the H.235 Annex F Gatekeeper Security Processor in H.235 Appendix I
|
Siemens AG
|
Q25/16, Q5/16, Q2/16
|
2004-11-03 |
|
[ 26 ]
|
WNSRP Comparison information
|
MOC Israel
|
Q2/16, Q3/16, Q1/16
|
2004-11-03 |
|
[ 25 ]
(Rev.1) |
Proposal for a draft new Recommendation H.460.x for using H.225.0 as transport for H.323 RAS messages
|
MOC Israel
|
Q2/16
|
2004-11-03 |
|
[ 24 ]
|
H.460.6 Extended Fast Connect Clarification
|
MOC Israel
|
Q2/16
|
2004-11-03 |
|
[ 23 ]
|
A feasibility analysis for a public network-located proxy solution
|
Huawei Technologies Co., Ltd.
|
Q5/16
|
2004-11-03 |
|
[ 22 ]
|
H.248 Package used to detect termination's long-time occupation status
|
Huawei Technologies Co., Ltd., China Academy of Te
|
Q3/16
|
2004-11-03 |
|
[ 21 ]
|
An enhanced mechanism for status monitoring based on Inactivity Timer package
|
Huawei Technologies Co., Ltd. China Academy of Tel
|
Q2/16, Q3/16
|
2004-11-03 |
|
[ 20 ]
|
A rule-based method for higher H.248 EventBuffer processing efficiency
|
Huawei Technologies Co., Ltd., China Academy of Te
|
Q3/16
|
2004-11-03 |
|
[ 19 ]
|
A proposal to introduce an efficient mechanism for EventBuffer processing
|
Huawei Technologies Co., Ltd. China Academy of Tel
|
Q3/16
|
2004-11-03 |
|
[ 18 ]
|
An acquisition of media stream QoS information by means of periodic auditing
|
Huawei Technologies Co., Ltd. China Academy of Tel
|
Q3/16
|
2004-11-03 |
|
[ 17 ]
|
An acquisition of media stream QoS information by means of periodic reporting
|
Huawei Technologies Co., Ltd. China Academy of Tel
|
Q3/16
|
2004-11-03 |
|
[ 16 ]
|
A proposal to launch a study for NGN-based QoS monitoring and control
|
Huawei Technologies Co., Ltd. China Academy of Tel
|
Q3/16
|
2004-11-03 |
|
[ 15 ]
|
Provisional Terms of Reference (ToR) for the super-wideband extension to the embedded VBR codec standard
|
Matsushita Electric Industrial Co., Ltd.
|
Q9/16
|
2004-11-03 |
|
[ 14 ]
|
Proposal for deciding the development approach and finalizing Terms of Reference (ToR) of the embedded VBR standardization
|
Matsushita Electric Industrial Co., Ltd.
|
Q9/16
|
2004-11-03 |
|
[ 13 ]
|
Proposed process and time schedule for the development of the embedded VBR
|
Matsushita Electric Industrial Co., Ltd.
|
Q9/16
|
2004-11-03 |
|
[ 12 ]
|
A fast profile of H.264
|
Tandberg
|
Q6/16
|
2004-11-02 |
|
[ 11 ]
|
Modification to G.168, Test 13
|
Ditech Communications Corp.
|
Q16/16
|
2004-11-02 |
|
[ 10 ]
|
Interoperability Problems of Recorded Sounds and Voice Enhancement Devices (VED's)
|
Ditech Communications Corp.
|
Q18/16, Q16/16
|
2004-11-02 |
|
[ 9 ]
|
Proposed additions to draft new Recommendation H.460.mmrs - "Message Flows"
|
Cisco Systems
|
Q2/16
|
2004-10-29 |
|
[ 8 ]
|
Problems of G.729 Annex B in VOIP application
|
Texas Instruments Incorporated
|
Q10/16
|
2004-10-27 |
|
[ 7 ]
|
Reduced Resolution Update for Computational Efficiency
|
Polycom, Inc.
|
Q6/16
|
2004-10-27 |
|
[ 6 ]
|
"Dark" Macroblocks for Improved Computational Efficiency
|
Polycom, Inc.
|
Q6/16, Q1/16
|
2004-10-27 |
|
[ 5 ]
|
Discussion of the ToR of G.729EV
|
Mindspeed Technologies
|
Q10/16
|
2004-10-27 |
|
[ 4 ]
|
Proposal of Vendor Information in T.38 SIP/SDP Call-Setup
|
Ricoh Co., Ltd
|
Q14/16
|
2004-10-27 |
|
[ 3 ]
|
Clarification of handling in ECM mode in T.38
|
Ricoh Co., Ltd
|
Q14/16
|
2004-10-27 |
|
[ 2 ]
|
Deletion of spaces in T.38 SIP call-setup sequence examples
|
Ricoh Co., Ltd
|
Q14/16
|
2004-10-27 |
|
[ 1 ]
|
Clarification of T.38 parameters in SIP and MGCP call-setup
|
Ricoh Co., Ltd
|
Q14/16
|
2004-10-27 |
Results:89 total items. Result page:
Previous -
1 -
2
|
Multiple Document Download: Formats and Languages to be included (when available):