Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 574 ]
|
Information on alternative modulation formats for revision of sup.39
|
Alcatel-Lucent
|
Q6/15
|
2007-05-25 |
|
[ 573 ]
|
Proposal for 43Gb/s application at G.dapp2 considering PSBT (ODB) modulation format for 100GHz and for 50 GHz channel spacing.
|
Alcatel-Lucent
|
Q6/15
|
2007-05-25 |
|
[ 572 ]
|
Proposal for revision of G.671 to extend the wavelength range of chromatic dispersion compensating components
|
Alcatel-Lucent
|
Q7/15
|
2007-05-25 |
|
[ 571 ]
|
G.paclock document structure
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 570 ]
|
G.paclock - editorial/clarifications
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 569 ]
|
G.paclock - Clause 5.7.4.1 - Phase discontinuity for EEC-Option 1
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 568 ]
|
G.paclock - Clause 5.7.3 - Phase response to input signal interruptions
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 567 ]
|
G.paclock - Figure 14
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 566 ]
|
Synchronous Ethernet - jitter requirements
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 565 ]
|
G.paclock - Clause 5.4.3 Jitter
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 564 ]
|
G.paclock - Clause 5.5.2 Jitter Tolerance
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 563 ]
|
Line timing in Synchronous Ethernet
|
Zarlink
|
Q13/15
|
2007-05-25 |
|
[ 562 ]
|
G.7713, SP34 - interlayer description
|
Nortel Networks (Canada)
|
Q14/15
|
2007-05-25 |
|
[ 561 ]
|
ASON Call Routing
|
Nortel Networks (Canada)
|
Q14/15, Q12/15
|
2007-05-25 |
|
[ 560 ]
|
Link Aggregation
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 559 ]
|
RPR for G.8021
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 558 ]
|
G.8261 Appendix IX Use Cases Transport Requirements
|
Nortel Networks (Canada)
|
Q13/15
|
2007-05-25 |
|
[ 557 ]
|
G.8261 Appendix IX clarifications
|
Nortel Networks (Canada)
|
Q13/15
|
2007-05-25 |
|
[ 556 ]
|
ERP Interactions with Layer 2 Network Control Protocols
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 555 ]
|
Ethernet - Shared Protection Ring (E-SPRing)
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 554 ]
|
E-SPRing Handling of Multiple Failures
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 553 ]
|
E-SPRing Failure Propagation
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 552 ]
|
Specification of point to multipoint in G.8121 amendment 1
|
Nortel Networks (Canada)
|
Q9/15
|
2007-05-25 |
|
[ 551 ]
|
Updates to G.8080 LRM and TAP components to support packet switching
|
Nortel Networks (Canada)
|
Q12/15
|
2007-05-25 |
|
[ 550 ]
|
Ethernet services
|
Nortel Networks (Canada)
|
Q9/15, Q11/15
|
2007-05-25 |
|
[ 549 ]
|
WITHDRAWN - See C397
|
N/A
|
|
N/A |
|
[ 548 ]
|
G.vdsl: Comparison between improved Logging and Histograms
|
Alcatel-Lucent Bell
|
Q4/15
|
2007-05-25 |
|
[ 547 ]
|
G.VDSL, G.ploam: Improved Impulse Noise Logging: Proposed Working Text
|
Alcatel-Lucent Bell
|
Q4/15
|
2007-05-25 |
|
[ 546 ]
|
G.vdsl: Calculations and impact of non-consecutive impulse noise
|
Alcatel-Lucent Bell
|
Q4/15
|
2007-05-25 |
|
[ 545 ]
|
G.ploam: Full Proposed Text for Equalized FEXT UPBO method in VDSL2
|
Alcatel-Lucent Bell
|
Q4/15
|
2007-05-25 |
|
[ 544 ]
|
G.vdsl: Single Method for FEXT Cancellation
|
Alcatel-Lucent Bell
|
Q4/15
|
2007-05-25 |
|
[ 543 ]
|
G.vdsl: Information required for decision on FEXT cancellation
|
Alcatel-Lucent Bell,
,
Ericsson
,
Nokia Siemens Networks,
|
Q4/15
|
2007-05-25 |
|
[ 542 ]
|
G.vdsl: Impact of a disorderly leaving event on a precoded VDSL2 system
|
Alcatel-Lucent Bell
|
Q4/15
|
2007-05-25 |
|
[ 541 ]
|
G.vdsl: Need for backward compatibility with respect to FEXT cancellation methods
|
Alcatel-Lucent Bell
|
Q4/15
|
2007-05-25 |
|
[ 540 ]
|
G.vdsl: On the tracking speed required for changing crosstalk channels
|
Alcatel-Lucent Bell
|
Q4/15
|
2007-05-25 |
|
[ 539 ]
|
G.vdsl: Information required for decision on FEXT cancellation : method based on reporting of Hchannel(f)
|
Alcatel-Lucent Bell
|
Q4/15
|
2007-05-25 |
|
[ 538 ]
|
G.vdsl: Information required for decision on FEXT cancellation : method based on reporting of Error(f)
|
Alcatel-Lucent Bell
|
Q4/15
|
2007-05-25 |
|
[ 537 ]
|
Considerations of FEC using 32 byte interleaved RS(255,239) codecs for OTU4 in G.709
|
ETRI
|
Q11/15
|
2007-05-26 |
|
[ 536 ]
|
G.VDSL: Improved Impulse Noise Logging: Overview
|
Alcatel-Lucent Bell
|
Q4/15
|
2007-05-25 |
|
[ 535 ]
|
Proposal on state transition tables for T-MPLS linear protection switching
|
ETRI,
,
Huawei Technologies
|
Q9/15
|
2007-05-25 |
|
[ 534 ]
|
Proposal to study Ethernet transparency over OTN
|
NTT
|
Q11/15
|
2007-05-25 |
|
[ 533 ]
|
Items under study in Q12
|
BT
|
Q12/15
|
2007-05-25 |
|
[ 532 ]
|
Proposed clarification of GFP mapping for OSI protocols
|
Tellabs Oy
|
Q11/15
|
2007-05-25 |
|
[ 531 ]
|
Support of 1 Gbps and 10Gbps Ethernet remote failures via GFP CMF/CSF
|
Tellabs Oy
|
Q11/15, Q9/15
|
2007-05-25 |
|
[ 530 ]
|
Proposal to continue consideration of OTU4 bit rate
|
NTT
|
Q6/15, Q11/15
|
2007-05-25 |
|
[ 529 ]
|
Proposal to clarify the characteristics of Ethernet transport over OTN
|
NTT
,
NEC
,
Mitsubishi
,
NICT
,
KDDI
|
Q11/15
|
2007-05-25 |
|
[ 528 ]
|
WITHDRAWN - See C527
|
N/A
|
|
N/A |
|
[ 527 ]
|
Spectral excursion measurements with NRZ-DPSK modulation format
|
Alcatel-Lucent, Germany
|
Q6/15
|
2007-05-25 |
|
[ 526 ]
|
Comments on G.SUP42
|
Mitsubishi electric Corp.
|
Q1/15
|
2007-05-25 |
|
[ 525 ]
|
Proposal for Ethernet Rings Protection Switching Mechanisms
|
NTT
,
Nokia Siemens Networks GmbH & Co. KG
|
Q9/15
|
2007-05-25 |
Results:332 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):