International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2006-02-06 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  D (2006-02-06) 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting  from 2006-02-06 to 2006-02-17

held in Switzerland [Geneva]

Other Meetings : 2008-12-01  2008-02-11  2007-06-04  2006-10-30  [ 2006-02-06 ]  2005-05-16  2004-11-29 

Results:217 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
Delayed Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 623 ]  
 
Limiting jitter & wander production - SyncEth Network Clock     BT   Q13/15   2006-01-27
[ 622 ]  
 
Enhancements to G.pactiming Appendix VIII     BT   Q13/15   2006-01-27
[ 621 ]  
 
Proposed New Draft Recommendation G.PBT     BT   Q12/15   2006-01-27
[ 620 ]  
 
Simulation and Test Configurations for Clock Synchronization over Packet Networks     Nortel Networks (Canada)   Q13/15   2006-01-27
[ 619 ]  
 
VDSL2: DPBO specifications of G.993.2 Annex C; the revised version of MG-031     NTT , SoftbankBB , NEC , Fujitsu , ACCA   Q4/15   2006-01-27
[ 618 ]  
 
Topics for a Liaison Statement to IEC on restart conditions after APR (G.664)     Deutsche Telekom   Q6/15   2006-01-27
[ 617 ]  
 
Unified Functional Model     Ciena   Q12/15   2006-01-27
[ 616 ]  
 
Comments on G.7718.1 UML     Ciena   Q14/15   2006-01-27
[ 615 ]  
 
Role of ITU-T work on Ethernet Equipment     Ciena   Q9/15   2006-01-27
[ 614 ]  
 
GFP MTU sizes for the GFP-F Payload     Deutsche Telekom   Q11/15   2006-01-27
[ 613 ]  
 
Incorporation of Provide Bridge issues in Recommendation G.8012     Deutsche Telekom   Q11/15   2006-01-27
[ 612 ]  
 
Deletion of length encapsulation from subclause 6.1.2/G.8012     Deutsche Telekom   Q11/15   2006-01-27
[ 611 ]  
 
Proposal for application codes using EDC for 80km 10 Gb/s applications in G.959.1 and supporting data     AMCC   Q6/15   2006-01-27
[ 610 ]  
 
Considerations on unified model     Siemens   Q12/15   2006-01-27
[ 609 ]  
 
Proposed extended definition of transport entity     Alcatel   Q12/15   2006-01-27
[ 608 ]  
 
Proposal for G.652 compliant G.smx fibres     Italy   Q5/15, Q10/15   2006-01-27
[ 607 ]  
 
Comments on the proposal for the new Recommendation G.650.3     Telecom Italia   Q5/15   2006-01-27
[ 606 ]  
 
Values of PXC transfer parameters for G.otf     Telecom Italia   Q7/15, Q6/15   2006-01-27
[ 605 ]  
 
Values of OADM transfer parameters for G.otf     Telecom Italia   Q7/15, Q6/15   2006-01-27
[ 604 ]  
 
Proposals for the new Recommendation G.dapp.2     Telecom Italia   Q6/15   2006-01-27
[ 603 ]  
(Rev.1) 
Support for consenting Transport MPLS Recommendations     Italy , France   Q12/15, Q11/15, Q9/15   2006-01-27
[ 602 ]  
 
Improvements proposals for the G.pactiming     Ericsson   Q13/15   2006-01-27
[ 601 ]  
 
Proposals for improvements of Figure 2 in G.pactiming     Ericsson   Q13/15   2006-01-27
[ 600 ]  
 
Proposals on Study Point 20 in G.pactiming Living List     Ericsson   Q13/15   2006-01-27
[ 599 ]  
 
Proposals on Network Limits (clause 7) in G.pactiming     Ericsson   Q13/15   2006-01-27
[ 598 ]  
 
Proposals on Measurement Guidelines Appendix in the G.pactiming (SP23)     Ericsson   Q13/15   2006-01-27
[ 597 ]  
 
Proposals for Clause 12, IWF Requirements in G.pactiming (SP25 and SP7)     Ericsson   Q13/15   2006-01-27
[ 596 ]  
 
Proposed Entity Definitions for the Unified Model     BT   Q12/15   2006-01-27
[ 595 ]  
 
Timing Diagrams for TDM transport over Packet Switched Networks     Israel   Q13/15   2006-01-27
[ 594 ]  
 
Proposal to define pseudowire over GFP encapsulation     Israel   Q11/15   2006-01-27
[ 593 ]  
 
Clarifications regarding Figures 4,5, and 7 of G.pactiming     Israel   Q13/15   2006-01-27
[ 592 ]  
 
Additional text for Appendix VI/G.pactiming     Israel   Q13/15   2006-01-27
[ 591 ]  
 
Proposed changes to clause 9/G.pactiming     Israel   Q13/15   2006-01-27
[ 590 ]  
 
Clarifications concerning Table 2/G.pactiming     Israel   Q13/15   2006-01-27
[ 589 ]  
 
Effect of packet loss/packet mis-order on timing recovery (High BW PLL)     Israel   Q13/15   2006-01-27
[ 588 ]  
 
Reference timing source noise model for simulation of the differential clock recovery method     Israel   Q13/15   2006-01-27
[ 587 ]  
 
Draft text proposal for clause 6 in new Rec. G.subcab     France Telecom   Q8/15   2006-01-26
[ 586 ]  
 
Proposal for G653/G655 fiber Ultra long-haul applications with FEC in G.959.1     Huawei   Q6/15   2006-01-26
[ 585 ]  
 
TTL process of the transport MPLS     Huawei   Q9/15, Q12/15   2006-01-26
[ 584 ]  
 
Summary of the issues on interlayer aspects in G.8080 draft     Huawei , China Mobile   Q14/15, Q12/15   2006-01-26
[ 583 ]  
 
Status migration between power shedding and normal status     Huawei   Q2/15   2006-01-27
[ 582 ]  
 
Several Comments of G.OTF     Huawei   Q6/15   2006-01-27
[ 581 ]  
 
Proposed Text Annex x. Automode     Huawei   Q4/15   2006-01-27
[ 580 ]  
 
Proposal to current G.hs carrier set designation     Huawei   Q4/15   2006-01-27
[ 579 ]  
 
Proposal to criteria of automode     Huawei   Q4/15   2006-01-27
[ 578 ]  
 
Proposal of GPON in support of 802.1ad     Huawei   Q2/15   2006-01-27
[ 577 ]  
 
Proposal for APS protocol phase in Y.1720     Huawei   Q9/15   2006-01-27
[ 576 ]  
 
Proactive advertisement of MAC address in MAC-in-MAC networks     Huawei   Q12/15   2006-01-27
[ 575 ]  
 
New requirement for Power Shed on ONT     Huawei   Q2/15   2006-01-27
[ 574 ]  
 
G.783 corrections intended for new revision     Huawei   Q11/15   2006-01-27
Results:217 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2006-02-02