International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Meeting 2003-07-21 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG13  D (2003-07-21) 

ITU-T SG13

WP 2/13 (Architectures and internetworking principles ) and WP 3/13 (Multi-protocol networks and mechanisms)

Study Period 2001

Meeting  from 2003-07-21 to 2003-08-01

held in Switzerland [Geneva]

Other Meetings : 2004-10-01  2004-06-22  2004-02-03  [ 2003-07-21 ]  2002-10-29  2002-07-08  2002-01-22  2001-05-14  2000-11-20 

Results:118 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
Delayed Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 392 ]  
 
Editorial additions to Y.vsmpls     RAD Data Communications   Q5/13   2003-07-09
[ 391 ]  
 
Proposal for AAL2 Trunking over IP     RAD Data Communications   Q5/13   2003-07-09
[ 390 ]  
 
TDM References for Y.tdmpls     RAD Data Communications   Q5/13   2003-07-09
[ 389 ]  
 
The Insufficiency of RTP for TDM Clock Recovery     RAD Data Communications   Q5/13   2003-07-09
[ 388 ]  
 
Discussion on Frame Locking for Y.tdmpls     RAD Data Communications   Q5/13   2003-07-09
[ 387 ]  
 
Proposal for use AAL1 as Y.tdmpls Payload Format     RAD Data Communications   Q5/13   2003-07-09
[ 386 ]  
 
Proposed New Appendix for Recommendation I.378     Siemens AG   Q4/13   2003-07-09
[ 385 ]  
 
User plane UNI/NNI requirements based on Y.1221     USA   Q4/13   2003-07-09
[ 384 ]  
 
Use of Y.1221 transfer capabilities to meet Y.1541 requirements     USA   Q6/13   2003-07-09
[ 383 ]  
 
OAM functions and protocol proposal for Y.17ethoam     PMC-Sierra Inc.   Q3/13   2003-07-09
[ 382 ]  
 
OAM domain concept     PMC-Sierra Inc.   Q3/13   2003-07-09
[ 381 ]  
 
Ethernet Service OAM and Infrastructure OAM     PMS-Sierra Inc.   Q3/13   2003-07-09
[ 380 ]  
 
Proposed Management Plane Aspects for Draft new Recommendation Y.vsmpls     Nortel Networks   Q5/13   2003-07-09
[ 379 ]  
 
Proposed text for Control Plane Aspects for Draft new Recommendation Y.vsmpls     Nortel Networks   Q5/13   2003-07-09
[ 378 ]  
 
Proposed user plane requirements for Draft new Recommendation Y.vsmpls     Nortel Networks   Q5/13   2003-07-09
[ 377 ]  
 
Service Provider Network Ethernet Traffic Parameters     Nortel Network   Q6/13, Q4/13   2003-07-09
[ 376 ]  
 
Y.1541 should become technology agnostic     Nortel Networks   Q6/13, Q4/13   2003-07-09
[ 375 ]  
 
Additional Defect Type Code Point for Y.17iw     Nortel Networks   Q5/13, Q3/13   2003-07-09
[ 374 ]  
 
Alternative mechanism to distinguish OAM PDUs     Nortel Networks   Q3/13   2003-07-09
[ 373 ]  
 
Modifications to Y.17fec-cv     Nortel Networks   Q3/13   2003-07-09
[ 372 ]  
 
De-encapsulation procedures for FR-MPLS network interworking     Nortel Networks   Q5/13   2003-07-09
[ 371 ]  
 
Proposed modifications to clauses 8 and 9 of item #2 of the living list on FR     Nortel Networks   Q5/13   2003-07-09
[ 370 ]  
 
User plane requirements for service interworking between ATM or FR with MPLS     Nortel Networks   Q5/13   2003-07-09
[ 369 ]  
 
Proposed addition of a new clause to draft Recommendation Y.atmplsF     Nortel Networks   Q5/13   2003-07-09
[ 368 ]  
 
Comments on clause 11 of draft Recommendation Y.atmplsF     Nortel Networks   Q5/13   2003-07-09
[ 367 ]  
 
Comments on clause 9 of draft Recommendation Y.atmplsF     Nortel Networks   Q5/13   2003-07-09
[ 366 ]  
 
Comments on clause 8 of draft Recommendation Y.atmplsF     Nortel Networks   Q5/13   2003-07-09
[ 365 ]  
 
Comments on clauses 1 to 6 of draft Recommendation Y.atmplsF     Nortel Networks   Q5/13   2003-07-09
[ 364 ]  
 
Inconsistencies between sections 5 and 8 of Y.17ethreq     Nortel Networks and PMC-Sierra Inc.   Q3/13   2003-07-09
[ 363 ]  
 
Correction of text in section 5 of Y.17ethreq     Nortel Networks and PMC-Sierra Inc.   Q3/13   2003-07-09
[ 362 ]  
 
Comments on user plane requirements for TDM over MPLS     USA   Q5/13   2003-07-09
[ 361 ]  
 
Load sharing and common internetworking indicators in ATM over MPLS - Y.atmplsF     USA   Q5/13   2003-07-09
[ 360 ]  
 
Comments on Y.atmplsF     USA   Q5/13   2003-07-09
[ 359 ]  
 
Proposed encapsulation format for TDM over MPLS interworking     USA   Q5/13   2003-07-09
[ 358 ]  
 
A study area on Network control architectures and protocols in the NGN-2004 Project     France Telecom   Q12/13   2003-07-09
[ 357 ]  
 
Some outcome of the NGN definition contained in the NGN-2004 project description     France Telecom   Q12/13   2003-07-09
[ 356 ]  
 
Draft Recommendation of a general description of vidioconferencing services networks     China Telecom and Huawei Technologies   Q1/13   2003-07-08
[ 355 ]  
 
A proposed Interworking Architecture Model of NGN     Huawei Technologies Co. Ltd   Q12/13, Q5/13, Q1/13   2003-07-08
[ 354 ]  
 
A proposal for launching a study on Customer Premises Access Device Management in NGN network     Huawei Technologies Co. Ltd   Q1/13, Q12/13   2003-07-08
[ 353 ]  
 
A proposal for launching research on videoconferencing services network     Huawei Technologies and China Telecom   Q1/13   2003-07-08
[ 352 ]  
 
A proposal for customer premises access device management in NGN network     Huawei Technologies Co. Ltd   Q1/13, Q12/13   2003-07-08
[ 351 ]  
 
A carrier-class QoS solution framework for IP-based backbone networks     Huawei Technologies and China Telecom   Q11/13, Q4/13, Q16/13   2003-07-08
[ 350 ]  
 
A carrier-class QoS solution framework for IP-based access network     Huawei Technologies and China Telecom   Q11/13, Q4/13, Q16/13   2003-07-08
[ 349 ]  
 
Availability objectives in G.827     France Telecom   Q8/13   2003-07-08
[ 348 ]  
 
Fast failure detection in MPLS networks     USA   Q3/13   2003-07-08
[ 347 ]  
 
Analysis of Packet 1+1 Protection Scheme     USA   Q3/13   2003-07-08
[ 346 ]  
 
Ethernet Trace Route Mechanism for Y.17ethoam     Cisco Systems   Q3/13   2003-07-08
[ 345 ]  
 
Ethernet Loopback Mechanism for Y.17ethoam     Cisco Systems   Q3/13   2003-07-08
[ 344 ]  
 
Ethernet Connectivity Check Mechanism for Y.17ethoam     Cisco Systems   Q3/13   2003-07-08
[ 343 ]  
 
Ethernet Fault Management OAM Messages for Y.17ethoam     Cisco Systems   Q3/13   2003-07-08
Results:118 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2003-10-14