Temporary Documents
(GEN)
 |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 32-GEN ]
|
Proposal for Signalling Security Requirements at PSTN Interconnection with VoIP networks
|
SG 17 (GVA, 10-19 Sept. 2003)
|
Q10/17, Q16/11, Q12/11, Q11/11, Q9/11, QN1/11, Q6/11
|
2003-10-07 |
|
[ 31-GEN ]
|
ITU-T SG 11 EDH Users Guide, v 1.6
|
SG 11 Vice Chairman (G. Ratta)
|
QALL/11
|
2004-02-23 |
|
[ 30-GEN ]
|
Discussion Summary of Virtual Meeting on IP-QoS Signalling (Draft)
|
WP 2/11 Chairperson (G. Ratta)
|
QALL/11, Q8/11
|
2004-02-23 |
|
[ 29-GEN ]
|
Recommended editorial changes to Supplement TBD to ITU-T Recommendation Q.TBD, "Signalling Support for IEPS and ETS" to delete ETS
|
Editor (J. Trakinat)
|
Q12/11, Q11/11
|
2004-02-18 |
|
[ 28-GEN ]
(Rev.1-2) |
Supplement TBD to ITU-T Recommendation Q.TBD, "Signalling Support for IEPS and ETS"
|
Editor (J. Trakinat)
|
Q12/11, Q11/11
|
2004-02-18 |
|
[ 27-GEN ]
|
Baseline text for a Technical Report on NGN Service Control Architectures
|
Editor (B. Chatras)
|
QN1/11, Q1/11
|
2004-02-18 |
|
[ 26-GEN ]
|
Baseline text for a Recommendation on SIP-based Service Triggering and Service Interactions
|
Editor (B. Chatras)
|
QN2/11, QN1/11, Q1/11
|
2004-02-18 |
|
[ 25-GEN ]
|
Draft Technical Report Q.ncap2 - Signalling Requirements for gate control interfaces
|
Editor (B. Chatras)
|
QN2/11, Q6/11, Q1/11
|
2004-02-18 |
|
[ 24-GEN ]
|
Draft Technical Report Q.ncap2 - Signalling Requirements for gate control interfaces (OUTPUT from the September 2003 meeting).
|
Editor (B. Chatras)
|
QN2/11, Q6/11, Q1/11
|
2004-02-18 |
|
[ 23-GEN ]
|
Liaison Statement on NGN studies
|
SG13 (GVA 3-12 February 2004)
|
QALL/13, Q9/11, Q8/11, Q7/11, QN3/11, QN2/11, QN1/11
|
2004-02-17 |
|
[ 22-GEN ]
|
Liaison Statement - Development of new Recommendation Y.1530
|
SG13 (GVA 3-12 February 2004)
|
Q9/13, Q9/11, Q8/11, Q7/11, QN1/11
|
2004-02-17 |
|
[ 21-GEN ]
|
Liaison Statement - New Appendix XI/Y.1541 on concatenating QoS values
|
SG13 (GVA 3-12 February 2004)
|
Q6/13, Q12/11, Q8/11
|
2004-02-17 |
|
[ 20-GEN ]
|
Reply to the Liaison on structured probable cause
|
SG13 (GVA 3-12 February 2004)
|
Q3/13, Q18/4, Q17/4, Q12/4, QALL/11
|
2004-02-17 |
|
[ 19-GEN ]
|
Reply to Liaison on removal of proposed Amendments (Level 3) from Rec. M.3100
|
SG13 (GVA 3-12 February 2004)
|
Q3/13, Q19/4, Q12/4, QALL/11
|
2004-02-17 |
|
[ 18-GEN ]
|
Liaison Statement - Updating of Work Plan related to satellite issues of ITU-T Study Groups
|
SG13 (GVA 3-12 February 2004)
|
Q13/13, QN4/11, QN3/11, QN2/11, QN1/11, QALL/11
|
2004-02-17 |
|
[ 17-GEN ]
|
Liaison Statement - TDM and Voice services interworking with MPLS
|
SG13 (GVA 3-12 February 2004)
|
Q5/13, Q12/11, Q8/11
|
2004-02-17 |
|
[ 16-GEN ]
|
Liaison Statement to ITU-T SGs, ITU-R WGs, IETF on the ITU-T IP Project
|
SG13 (GVA 3-12 February 2004)
|
Q12/13, QALL/11
|
2004-02-17 |
|
[ 15-GEN ]
|
Report of Global Standards Collaboration (GSC 8) meeting, Ottawa, 28 April - 1 May 2003
|
TSB
|
QALL/11
|
2004-02-11 |
|
[ 14-GEN ]
|
ITU-T Rec. Q.1761 "Principles and Requirements for Convergence of Fixed and Existing IMT-2000 Systems"
|
SSG (17-21 November 2003)
|
Q7/SSG, Q9/11, Q8/11, Q7/11, Q6/11, Q1/11
|
2004-01-16 |
|
[ 13-GEN ]
|
Liaison Statement - Supplement 47 to Series Q: "Emergency Services for IMT-2000 Networks - Requirements for Harmonization and Convergence"
|
SSG (17-21 November 2003)
|
Q7/SSG, Q11/11, Q9/11, Q6/11, Q12/11
|
2004-01-16 |
|
[ 12-GEN ]
|
Liaison Statement - Removal of Proposed Amendments (Level 3) from Rec. M.3100 Status Document
|
SG 4 (GVA 27.10-7.11.03)
|
Q19/4, Q12/4, QALL/11, Q9/11
|
2003-11-17 |
|
[ 11-GEN ]
|
Liaison Statement - Optical Transport Networks & Technologies Standardization Work Plan, Issue 4
|
SG15 9GVA 21-31 October 2003)
|
QALL/15, QALL/11, Q9/11
|
2003-11-06 |
|
[ 10-GEN ]
|
Liaison Statement to IETF CCAMP on RSVP-Te and CR-LDP
|
SG15 (GVA 21-31 October 2003)
|
Q11/11, Q8/11
|
2003-11-06 |
|
[ 9-GEN ]
|
Liaison Statement - Country Code Reservation for Telecommunication for Disaster Relief
|
SG 2 (Florianopolis, 25-31 Oct. 2003)
|
Q1/11, Q9/11
|
2003-11-05 |
|
[ 8-GEN ]
|
Liaison Statement - new QoS Handbook
|
SG 2 (Florianopolis 25-31 Oct. 2003)
|
QALL/11, Q8/11
|
2003-11-05 |
|
[ 7-GEN ]
|
Liaison Statement - Structured probable cause
|
SG 4 (GVA 27.10-7.11.03)
|
Q15/11, Q14/11, Q13/11, Q12/11, Q11/11
|
2003-12-03 |
|
[ 6-GEN ]
|
Liaison Statement - Amendment to the Generic Network Information Model (M.3100)
|
SG 4 (GVA 27.10-7.11.03)
|
QALL/11, Q9/11
|
2003-12-03 |
|
[ 5-GEN ]
|
Liaison Statement - TDM and Voice services interworking with MPLS
|
SG13 (Rapporteur Grp Q.5/13) GVA 17-21.11.03
|
Q12/11, Q8/11
|
2003-11-25 |
|
[ 4-GEN ]
|
Liaison Statement - ITU-T NGN Project
|
SSG (GVA 17-21 November 2003)
|
QALL/11, Q1/11
|
2003-12-04 |
|
[ 3-GEN ]
|
Liaison Statement - Review of Resolution 20
|
TSAG (GVA 10-14 November 2003)
|
Q12/11
|
2003-11-24 |
|
[ 2-GEN ]
|
Liaison Statement - ITU-T & IETF further collaboration - Ref.:TD/299 Rev.1 (Annex 1)
|
TSAG (GVA 10-14 November 2003)
|
QALL/11, Q6/11
|
2003-11-24 |
|
[ 1-GEN ]
(Rev.1) |
LIST OF CONTRIBUTIONS, DELAYED CONTRIBUTIONS AND GEN/11 SERIES TEMPORARY DOCUMENTS
R1 is the list of documents received up to 12:00 on 12.03.04
|
TSB
|
QALL/11
|
2004-01-20 |
Results:82 total items. Result page:
Previous -
1 -
2
|
Multiple Document Download: Formats and Languages to be included (when available):