Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 88 ]
|
Brazilian next-generation digital terrestrial television - (Information document)
|
Brazil
|
|
2025-02-14 |
|
[ 87 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R BS.1770-5 - Algorithms to measure audio programme loudness and true-peak audio level
|
Brazil
|
Q135-2/6
|
2025-02-14 |
|
[ 86 ]
|
Progress report on high dynamic range television
|
RG on HDR-TV (RG-24)
|
Q142-3/6
|
2025-02-14 |
|
[ 85 ]
|
Liaison statement response from SC 29/WG 6 to ITU-R Working Party 6B and Working Party 6C on requirements for 6DoF audio service - MPEG 3D audio coding
|
ISO/IEC JTC 1/SC 29/WG6
|
|
2025-02-10 |
|
[ 84 ]
|
Liaison statement on invitation to provide inputs to the "Machine learning standardization roadmap"
|
JCA-ML
|
|
2025-01-08 |
|
[ 83 ]
|
Liaison statement to ISO/IEC JTC1/SC29 WG 6 - Requirements for 6DoF audio services
|
WP 6B
|
|
2024-12-17 |
|
[ 82 ]
|
Liaison statement on invitation to nominate the representative to the ITU-T JCA-ML
|
JCA-ML
|
|
2024-12-16 |
|
[ 81 ]
|
Liaison statement on invitation to provide inputs to the "Glossary of terms and definitions for machine learning"
|
JCA-ML
|
|
2024-12-16 |
|
[ 80 ]
|
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI - ITU-D Study Group 1 Question 3/1 - The use of telecommunications/ICTs for disaster risk reduction and management
|
ITU-D SG1 - Q3/1
|
|
2024-11-27 |
|
[ 79 ]
|
Liaison statement to Working Party 6C - Updated workplan for advanced sound systems
|
WP 6B
|
|
2024-11-20 |
|
[ 78 ]
|
Survey on sustainability in media
|
Society of Motion Picture and Television Engineers
|
|
2024-11-15 |
|
[ 77 ]
+Ch.4Ann.4.01 |
Report of the meeting of Working Party 6C (Geneva, 4-8 November 2024)
|
Acting Chair, WP 6C
|
|
2024-11-08 |
|
[ 76 ]
|
Final list of participants - Working Party 6C (Geneva, 4-8 November 2024)
|
Director, BR
|
|
2024-11-08 |
|
[ 75 ]
|
Liaison statement to Working Party 6C - HDR related text in draft revision to Report ITU-R BT.2485-2 - Advanced network planning and transmission methods for enhancements of digital terrestrial television broadcasting
|
WP 6A
|
|
2024-11-08 |
|
[ 74 ]
(Rev.1) |
List of documents issued (Documents 6C/37 - 6C/75)
|
BR, Study Groups Department
|
|
2024-11-01 |
|
[ 73 ]
|
Rapporteur Group - Future of Broadcasting Progress Report - March - October 2024
|
RG-FOB
|
|
2024-10-25 |
|
[ 72 ]
|
IRG-AVQA meeting Report (online)
|
Co-Chairs, IRG-AVQA
|
|
2024-10-25 |
|
[ 71 ]
|
Progress report of Rapporteur Group on the Audio
|
RG-Audio
|
|
2024-10-24 |
|
[ 70 ]
|
Examples of single-master HDR production with SDR-focused workflow
|
British Broadcasting Corporation (BBC)
|
Q142-3/6
|
2024-10-23 |
|
[ 69 ]
|
Deployment in the U.S.A. of ATSC 3.0 HDR-TV with SDR Compatibility using single-layer HDR (SL-HDR)
|
InterDigital Communications, Inc.
,
Philips International B.V.
|
Q142-3/6
|
2024-10-23 |
|
[ 68 ]
|
Proposal to add a new Annex to Report ITU-R BT.2408 - Single-master HDR production with dual-focused workflow
|
United Kingdom
|
|
2024-10-23 |
|
[ 67 ]
|
Progress report on high dynamic range television
|
RG on HDR-TV (RG-24)
|
Q142-3/6
|
2024-10-22 |
|
[ 66 ]
|
Proposed draft revision of Report ITU-R BT.2420-6 - Collection of usage scenarios of advanced immersive sensory media systems
|
Japan
|
Q143-2/6
|
2024-10-22 |
|
[ 65 ]
|
Proposed revision of Recommendation ITU-R BT.2123-0 - Video parameter values for advanced immersive audio-visual systems for production and international programme exchange in broadcasting
|
Japan
|
|
2024-10-22 |
|
[ 64 ]
|
Requirements for 6DoF audio services
|
Japan
|
|
2024-10-22 |
|
[ 63 ]
|
Proposed preliminary draft revision of Report ITU-R BT.2408-7 - Guidance for operational practices in HDR television production
|
RG on HDR-TV (RG-24)
|
|
2024-10-22 |
|
[ 62 ]
|
RG-EAB progress report - March 2024 to November 2024
|
RG-EAB
|
|
2024-10-22 |
|
[ 61 ]
|
This document has been withdrawn
|
N/A
|
|
2024-10-22 |
|
[ 60 ]
|
Performance comparison of NR video quality measurement methods for UHD programs
|
Korea (Rep. of)
|
Q44-4/6
|
2024-10-22 |
|
[ 59 ]
|
Proposed modification to preliminary draft new Recommendation ITU-R BT.[MON] - Recommended viewing conditions for HDR and SDR monitoring in close proximity within a single-master HDR production environment
|
United States
|
|
2024-10-21 |
|
[ 58 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R BS.1770-5 - Algorithms to measure audio programme loudness and true-peak audio level
|
United States
|
Q135-2/6
|
2024-10-22 |
|
[ 57 ]
|
[Working document towards a] Preliminary draft revision of Report ITU-R BT.2408-7 - Application of HDR vivid format
|
China
|
|
2024-10-21 |
|
[ 56 ]
|
[Working document towards a] Preliminary draft revision of Recommendation ITU-R BT.1729-0 - Common 16:9 aspect ratio HDR television reference test patterns
|
China
|
|
2024-10-21 |
|
[ 55 ]
|
[Preliminary] Draft revision of Report ITU-R BS.2493-0 - Practical implementation of broadcast systems using audio codecs for ITU advanced sound systems (copy to ITU-R Working Party 6C for information)
|
China
|
|
2024-10-21 |
|
[ 54 ]
|
Information document - NABA supporting document for RG24 Working Group efforts towards final ratification of Recommendation ITU-R BT.[MON]
|
North American Broadcasters Association (NABA)
|
|
2024-10-17 |
|
[ 53 ]
|
Proposed modification to preliminary draft new Recommendation ITU-R BT.[MON] - Recommended viewing conditions for HDR and SDR monitoring in close proximity within a single-master HDR/SDR production environment
|
RG on HDR-TV (RG-24)
|
|
2024-10-08 |
|
[ 52 ]
|
[Working document towards] Preliminary draft Report - Yxy coding for-full colour gamut display and capture
|
Baylor University
|
|
2024-10-09 |
|
[ 51 ]
|
Brazilian next-generation Digital Terrestrial Television (Information document)
|
Brazil
|
|
2024-10-04 |
|
[ 50 ]
|
ITU Handbook on Spectrum Monitoring - Review the ongoing revision to Chapter 5, section 5.2 - Broadcast monitoring
|
ATDI
|
|
2024-08-18 |
|
[ 49 ]
|
Liaison statement on results of the seventh and final meeting of the FG-MV
|
ITU-T FG-MV
|
|
2024-06-24 |
|
[ 48 ]
|
Liaison statement on glossary for metaverse
|
ITU Focus Group on Metaverse (FG-MV)
|
|
2024-06-21 |
|
[ 47 ]
|
Liaison statement on creation of new work item on draft Recommendation ITU-T J.CLE-ARVR - Terminology, metrics and functional requirements for cognitive load estimation for augmented and virtual reality (AR/VR) services
|
ITU-T SG9
|
|
|
|
[ 46 ]
|
Reply liaison statement on F.IPTV-VRSREQeqs - Requirements of enabling VR service based on IPTV architecture
|
ITU-T SG16
|
|
2024-05-09 |
|
[ 45 ]
|
Liaison statement on results of the sixth meeting of the FG-MV
|
ITU-T FG-MV
|
|
2024-05-06 |
|
[ 44 ]
|
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
|
Chair, CCV
|
|
2024-04-22 |
|
[ 43 ]
|
Liaison statement on definition of CitiVerse
|
ITU-T FG-MV
|
|
2024-04-18 |
|
[ 42 ]
|
Liaison statement on vocabulary for metaverse
|
IRG-AVA
|
|
2024-04-17 |
|
[ 41 ]
|
Liaison statement on results of the fifth meeting of the FG-MV
|
ITU-T FG-MV
|
|
2024-04-02 |
|
[ 40 ]
|
Liaison statement on Vocabulary for metaverse
|
ITU-T FG-MV
|
|
2024-03-27 |
|
[ 39 ]
|
Reply liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 6A and 6C)
|
WP 6B
|
|
2024-03-25 |
Results:138 total items. Result page:
Previous -
1 -
2 -
3
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):