Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 119 ]
|
Working document towards a preliminary draft new Report ITU-R M.[SAT IOT] - Technical and operational aspects of satellite Internet of Things (IoT) applications
|
United States
|
|
2025-04-15 |
|
[ 118 ]
|
Working document towards a preliminary draft new report on development and technology trends for the satellite component of IMT towards 2030 and beyond
|
United States
|
|
2025-04-15 |
|
[ 117 ]
|
Preliminary draft new Recommendation ITU-R M.[IMT 2020-SAT.SPECS] - Detailed specifications of the satellite radio interfaces of International Mobile Telecommunications-2020 (IMT-2020)
|
United States
|
|
2025-04-15 |
|
[ 116 ]
|
Liaison statement on satellite to satellite free space optical communication
|
ITU-T SG15
|
|
2025-04-15 |
|
[ 115 ]
|
Elements for the Handbook on satellite communications and technologies
|
Japan
|
|
2025-04-11 |
|
[ 114 ]
|
Proposals on working document towards a preliminary draft new Report ITU-R M.[SAT IOT] - Technical and operational aspects of satellite Internet of Things (IoT) applications
|
Russian Federation
|
|
2025-04-10 |
|
[ 113 ]
|
Liaison statement on initiation of new work item ITU-T Y.FMSC-LN - Fixed, mobile and satellite convergence - Lightweight network for IMT-2020 networks and beyond
|
ITU-T SG13
|
|
2025-04-04 |
|
[ 112 ]
|
Liaison statement on initiation of new technical Report ITU-T TR.FMSC-IMT2030 - Fixed, mobile and satellite convergence - Considerations on enhancements to support IMT-2030 networks
|
ITU-T SG13
|
|
2025-04-04 |
|
[ 111 ]
|
Liaison statement on initiation of new work item ITU-T Y.FMSC-LMDC - Fixed, mobile and satellite convergence - Location management for supporting discontinuous coverage in IMT-2020 networks and beyond
|
ITU-T SG13
|
|
2025-04-04 |
|
[ 110 ]
|
Liaison statement on consent of draft new Recommendation ITU-T Y.3220 (EX Y.FMSC-LCS) - Fixed, mobile and satellite convergence - Location service enhancement for IMT-2020 networks and beyond
|
ITU-T SG13
|
|
2025-04-04 |
|
[ 109 ]
|
Liaison statement on consent of draft new Recommendation ITU-T Y.3219 (EX Y.FMSC-DET) - Fixed, mobile and satellite convergence - Deterministic networking for IMT-2020 networks and beyond
|
ITU-T SG13
|
|
2025-04-04 |
|
[ 108 ]
|
Liaison statement on consent of draft new Recommendation ITU-T Y.3218 (EX Y.FMSC-SS) - Fixed, mobile and satellite convergence - Service scheduling for IMT-2020 networks and beyond
|
ITU-T SG13
|
|
2025-04-04 |
|
[ 107 ]
|
Correspondence received regarding the new Recommendation ITU-R M.[IMT-2020-SAT.SPECS] - ("Certification C")
|
Director, BR
|
|
2025-04-04 |
|
[ 106 ]
|
Correspondence received regarding the new Recommendation ITU-R M.[IMT-2020-SAT.SPECS] - ("Certification B")
|
Director, BR
|
|
2025-04-04 |
|
[ 105 ]
|
Liaison statement on consent of draft new Recommendation ITU-T Y.3217 (EX Y.FMSC-P2P) - Fixed, mobile and satellite convergence - Peer-to-peer services for IMT-2020 networks and beyond
|
ITU-T SG13
|
|
2025-04-04 |
|
[ 104 ]
|
Liaison statement on progress on technical Report ITU-T TR.SQKDN - Standardization consideration of satellite-based QKDN
|
ITU-T SG13
|
|
2025-04-02 |
|
[ 103 ]
(Rev.1) |
Liaison statement from Alliance for Telecommunications Industry Solutions (ATIS) to ITU-R Working Party 4B (for information to ITU-R Working Party 5D) - 3GPP "5G-NTN" material for Recommendation ITU-R M.[IMT-2020-SAT.SPECS] - SRIT
|
Alliance for Telecommunications Industry Solutions (ATIS)
|
|
2025-03-24 |
|
[ 102 ]
(Rev.1) |
Liaison statement from Alliance for Telecommunications Industry Solutions (ATIS) to ITU-R Working Party 4B (for information to ITU-R Working Party 5D) - 3GPP "5G-NTN" material for Recommendation ITU-R M.[IMT-2020-SAT.SPECS] - RIT
|
Alliance for Telecommunications Industry Solutions (ATIS)
|
|
2025-03-24 |
|
[ 101 ]
|
Liaison statement on the use of ITU-T E.164 shared global country code +881 for Global Mobile Satellite System (GMSS) operators
|
ITU-T SG2
|
|
2025-02-21 |
|
[ 100 ]
|
Reply liaison statement to ITU-R Working Party 5D (copy to RAG, TSAG, TDAG, ITU-T Study Groups 17 and 13 and ITU-R Working Party 4B) - Terms and definitions related to IMT-2020 (5G) technology
|
CCT
|
|
2024-12-20 |
|
[ 99 ]
|
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI - ITU-D Study Group 1 Question 3/1 - The use of telecommunications/ICTs for disaster risk reduction and management
|
ITU-D SG1 - Q3/1
|
|
2024-11-27 |
|
[ 98 ]
|
Reply liaison statement to Working Party 4B (copy to Working Party 6B for information) - Revision of Recommendation BO/BT.1774-2 - Use of satellite and terrestrial broadcast infrastructures for public warning, disaster mitigation and relief
|
WP 6A
|
|
2024-11-18 |
|
[ 97 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.6
|
WP 6A
|
AI1.6
|
2024-11-18 |
|
[ 96 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D) - WRC-27 agenda item 1.10
|
WP 6A
|
AI1.10
|
2024-11-18 |
|
[ 95 ]
|
Liaison statement to Working Parties 4B, 4C, 5A and 7B - Handbook on satellite communications and technologies
|
WP 4A
|
|
2024-11-14 |
|
[ 94 ]
|
Reply liaison statement to Working Party 5C (copy to Working Parties 4A, 4B, 5A, 5B, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
|
WP 4C
|
AI1.10
|
2024-11-12 |
|
[ 93 ]
|
Liaison statement to Working Party 1C, 4B, 4C and 5A - Draft table of contents (ToC) of Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services
|
WP 4A
|
|
2024-11-07 |
|
[ 92 ]
+Ann.1-16 |
Report on the fifty-fifth meeting of Working Party 4B (Geneva, 16 - 22 October 2024)
|
Chair, WP 4B
|
|
2024-10-22 |
|
[ 91 ]
|
Final list of participants Working Party 4B (Geneva, 16 - 22 October 2024)
|
Director, BR
|
|
2024-10-22 |
|
[ 90 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7C and 7D) - WRC-27 agenda item 1.11
|
WP 4C
|
AI1.11
|
2024-10-22 |
|
[ 89 ]
|
Reply liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy to Working Party 5D) - WRC-27 agenda item 1.13
|
WP 4C
|
AI1.13
|
2024-10-22 |
|
[ 88 ]
|
Draft reply liaison statement to Working Party 4B - Relevant technical information to support studies under WRC-27 agenda item 1.12
|
WP 4C
|
AI1.12
|
2024-10-18 |
|
[ 87 ]
|
Liaison statement to Coordination Committee for Terminology (Copy to RAG, TSAG, TDAG, ITU-T Study Groups 17 and 13 and ITU-R Working Party 4B) - Terms and definitions related to IMT-2020 (5G) technology
|
WP 5D
|
|
2024-10-17 |
|
[ 86 ]
|
List of documents issued (Documents 4B/31 - 4B/86)
|
BR, Study Groups Department
|
|
2024-10-15 |
|
[ 85 ]
|
Working document towards a preliminary draft new report on development and technology trends for the satellite component of IMT towards 2030 and beyond
|
United States
|
|
2024-10-04 |
|
[ 84 ]
|
[Elements towards a working document towards a preliminary draft new Report ITU-R M.[MSS_OBP]] - [EXAMPLE] network architectures and their impacts on performance objectives for mobile-satellite service systems with on-board processing
|
United States
|
|
2024-10-04 |
|
[ 83 ]
|
Working document towards a preliminary draft new Report ITU-R M.[SAT IOT] - Technical and operational aspects of satellite Internet of Things (IoT) applications
|
United States
|
|
2024-10-04 |
|
[ 82 ]
|
Working Party 4B's activity related to the satellite component of IMT
|
United States
|
|
2024-10-04 |
|
[ 81 ]
|
Proposed additions to working document towards a preliminary draft new report on development and technology trends for the satellite component of IMT towards 2030 and beyond
|
Thales SA
|
|
2024-10-04 |
|
[ 80 ]
|
Proposed revision to Recommendations ITU-R BO.789-2 and ITU-R BO.1130-4
|
European Broadcasting Union
,
Broadcast Networks Europe
|
|
2024-10-04 |
|
[ 79 ]
|
Proposed timeline and updates to the workplan for the future development of the IMT-2030 satellite component
|
Telefon AB - LM Ericsson
|
|
2024-10-04 |
|
[ 78 ]
|
Final evaluation report on the proposed candidate IMT-2020 satellite radio interface technology in document IMT-2020-SAT/4
|
ETSI
|
|
2024-10-04 |
|
[ 77 ]
|
Final evaluation report by 5GIF towards the 3GPP candidate technology for satellite component of IMT-2020
|
Director, BR
|
|
2024-10-04 |
|
[ 76 ]
|
Proposal to include IMT terrestrial and satellite radio interfaces in WRC-27 agenda item 1.13
|
Qualcomm, Inc.
|
AI1.13
|
2024-10-04 |
|
[ 75 ]
|
Evaluation report on the proposed candidate IMT-2020 satellite radio interface technology in document IMT-2020-SAT/4
|
Director, BR
|
|
2024-10-03 |
|
[ 74 ]
|
Proposed reply liaison statement to Working Party 4C on WRC-27 agenda item 1.12 - Information for studies on WRC-27 agenda item 1.12
|
Canada
,
Norway
|
AI1.12
|
2024-10-01 |
|
[ 73 ]
|
Considerations on the possible future development of low data rate MSS systems related to WRC-27 agenda item 1.12
|
Canada
,
Norway
|
AI1.12
|
2024-10-01 |
|
[ 72 ]
|
Proposed preliminary draft new Recommendation ITU-R M.[IMT-2020-SAT.SPECS]
|
France
|
|
2024-10-01 |
|
[ 71 ]
|
Proposed modifications to the preliminary draft new Report ITU-R M.[SAT-IMT-2020-EVAL]
|
France
|
|
2024-10-01 |
|
[ 70 ]
|
Proposed liaison statement to independent evaluation groups (IEGs)
|
France
|
|
2024-10-01 |
Results:169 total items. Result page:
Previous -
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):