International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP4A  C 

ITU-R R23-WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:837 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 787 ]  
 
Proposed revisions to working document on WRC-27 agenda item 1.2 - Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     United States   AI1.2   2025-10-15
[ 786 ]  
 
Proposed revision to Resolution 170     United States     2025-10-15
[ 785 ]  
 
Candidate topic under WRC-27 agenda item 7 assessing the potential advantage to define coordination arc for some frequency bands above 3.4 GHz and services currently not subject to the application of the coordination arc concept, and to review the existing coordination arc thresholds     United States   AI7   2025-10-15
[ 784 ]  
 
Possible measures to enhance long-term protection and sustainable development of BSS in the plan band against severe misaligned FSS in other regions     United States     2025-10-15
[ 783 ]  
 
Sharing and compatibility study of FSS systems with SRS operating in the 13.75-14 GHz frequency range     United States   AI1.2   2025-10-15
[ 782 ]  
 
Sharing and compatibility study of FSS systems with maritime RLS operating in the 13.75-14 GHz frequency range     United States   AI1.2   2025-10-15
[ 781 ]  
 
Working document towards draft CPM text for WRC-27 agenda item 1.2     United States   AI1.2   2025-10-15
[ 780 ]  
 
Working document on WRC-27 agenda item 1.2 (Part 3) - operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     United States   AI1.2   2025-10-15
[ 779 ]  
 
Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     United States   AI1.2   2025-10-15
[ 778 ]  
 
Revisions to working document towards draft CPM text for WRC-27 agenda item 1.3     United States   AI1.3   2025-10-15
[ 777 ]  
 
Working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)     United States   AI1.3   2025-10-15
[ 776 ]  
 
Proposal for the non-GSO spacecraft identification section - Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services     Germany     2025-10-15
[ 775 ]  
 
Preliminary draft new Recommendation ITU-R S.[RES 770] - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks in Q/V band with criteria contained in No. 22.5L of the Radio Regulations     France     2025-10-15
[ 774 ]  
 
[Working document towards a] preliminary draft new Recommendation ITU-R S.[AGGREGATE_EPFD_SIMPLIFIED_METHODOLOGY] - Simplified methodology for estimating the aggregate equivalent power flux-density levels into geostationary satellite networks which may be produced by multiple non-geostationary fixed-satellite service systems in frequency bands subject to Resolution 76 (Rev.WRC-23)     France     2025-10-14
[ 773 ]  
 
Proposals towards a preliminary draft new revision of Recommendation ITU-R S.2157 - Procedures for the evaluation of interference from any non-geostationary-satellite system into a global set of the generic geostationary-satellite reference links in the frequency bands 37.5-39.5 GHz (space-to-Earth), 39.5-42.5 GHz (space-to-Earth), 47.2-50.2 GHz (Earth-to-space) and 50.4-51.4 GHz (Earth-to-space)     France     2025-10-14
[ 772 ]  
 
Example application of a simplified methodology for estimating, based exclusively on publicly available data, the equivalent power flux-density levels into geostationary satellite networks which may be produced by one non-geostationary fixed-satellite service system in frequency bands subject to Resolution 76 (Rev.WRC-23)     France     2025-10-14
[ 771 ]  
 
Elements of working document towards draft CPM text for WRC-27 agenda item 1.5     France   AI1.5   2025-10-14
[ 770 ]  
 
Proposals towards the working document relating to WRC-27 agenda item 1.3     France   AI1.3   2025-10-14
[ 769 ]  
 
Scope of epfd studies     Angola , Botswana , Dem. Rep. of the Congo , Eswatini , Lesotho , Malawi , Mauritius , Mozambique , Namibia , South Africa , Tanzania , Zambia , Zimbabwe     2025-10-15
[ 768 ]  
 
Study on the protection of GSO systems in 18.8-19.7 GHz and 28.6-29.5 GHz frequency bands     China Satellite Network Group Co., Ltd     2025-10-15
[ 767 ]  
 
Proposed updates to working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Considerations for accounting all sidelobe contributions of non-GSO FSS satellites in Recommendation ITU-R S.1503     China Satellite Network Group Co., Ltd     2025-10-15
[ 766 ]  
 
Proposed topic under WRC-27 agenda item 7 - Possible measures to enhance long-term protection and sustainable development of broadcasting-satellite service in Regions 1 and 3 Plan band against severe misaligned FSS in Region 2, and vice versa     Iran (Islamic Republic of)   AI7   2025-10-15
[ 765 ]  
 
Elements for the working document towards draft CPM text for WRC-27 agenda item 1.5 - Considerations on the development of regulatory measures, and implementability thereof, to limit the unauthorized operations of non-GSO earth stations in the FSS and MSS and associated issues related to the service area of non-GSO FSS and MSS satellite systems     Tonga   AI1.5   2025-10-15
[ 764 ]  
 
Proposed edits to the working document on studies and CPM text on WRC-27 agenda item 1.3     Tonga   AI1.3   2025-10-15
[ 763 ]  
 
Proposed overview process for evaluating compliance with aggregate epfd limits in Resolution 76 (Rev.WRC-23)     SES     2025-10-16
[ 762 ]  
 
Adaptive coding and modulation performance objectives     SES     2025-10-15
[ 761 ]  
 
Absolute increase in unavailability     SES     2025-10-15
[ 760 ]  
 
Update to technical parameters for WRC-27 agenda item 1.3     SES   AI1.3   2025-10-15
[ 759 ]  
 
Update to technical parameters for WRC-27 agenda item 1.1     SES   AI1.1   2025-10-15
[ 758 ]  
 
Working document towards a preliminary draft ITU-R Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services     France     2025-10-15
[ 757 ]  
 
Use of the facsimile in the Radio Regulations     France , Montenegro   AI9.2   2025-10-15
[ 756 ]  
 
Views on candidate topics under WRC-27 agenda item 7     Global Satellite Operators' Association GSOA   AI7   2025-10-15
[ 755 ]  
 
Views on WRC-27 agenda item 1.6     Global Satellite Operators' Association GSOA   AI1.6   2025-10-15
[ 754 ]  
 
Elements towards a working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)     France   AI1.2   2025-10-15
[ 753 ]  
 
Proposed updates on working document on WRC-27 agenda item 1.2     France   AI1.2   2025-10-15
[ 752 ]  
 
Working document towards a preliminary draft new ITU-R Report WRC-27 agenda item 1.1 - Use of frequency bands 47.2-50.2 GHz and 50.4-51.4 GHz (Earth-to-space) by aeronautical and maritime earth stations in motion in the fixed-satellite service     Luxembourg   AI1.1   2025-10-15
[ 751 ]  
 
Satellite selection methodology and non-worst case geometry epfd assessments     Indonesia     2025-10-15
[ 750 ]  
 
Epfd framework for coexistence between GSO networks and non-GSO systems under agenda item 1.3     Indonesia   AI1.3   2025-10-15
[ 749 ]  
 
Proposed elements of working document towards draft CPM text for WRC-27     Indonesia   AI1.5   2025-10-15
[ 748 ]  
 
Proposed draft CPM text for WRC-27 agenda item 1.2     Indonesia   AI1.2   2025-10-15
[ 747 ]  
 
Studies for inclusion in the working document on WRC-27 agenda item 1.2     Papua New Guinea , Singapore   AI1.2   2025-10-15
[ 746 ]  
 
Update to working document towards draft CPM text on WRC-27 agenda item 1.2     Papua New Guinea , Singapore   AI1.2   2025-10-15
[ 745 ]  
 
Update to aggregate GSO study in Part 3 Annex 3 of 4A/567 for inclusion in the working document on WRC-27 agenda item 1.2     Papua New Guinea , China , India , Indonesia , Singapore , Thailand   AI1.2   2025-10-15
[ 744 ]  
 
Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)     Netherlands (Kingdom of the)   AI1.3   2025-10-15
[ 743 ]  
 
Compatibility studies and proposals for WRC-27 agenda item 1.4     SES   AI1.4   2025-10-14
[ 742 ]  
 
Elements of the working document towards a preliminary draft [new Recommendation ITU-R S.[NGSO DEORBITING]]/ [New Recommendation providing guidance on safe and efficient deorbit and/or disposal strategies and methodologies for non-GSO space stations]     Canada     2025-10-14
[ 741 ]  
 
Elements relating to working document towards a preliminary draft revision of Recommendation ITU-R S.1526-1 - Methodology to assess the interference environment in relation to Nos. 9.12, 9.12A and 9.13 of the Radio Regulations when non-geostationary-satellite orbit fixed-satellite service systems are involved     Canada     2025-10-14
[ 740 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations     Canada     2025-10-14
[ 739 ]  
 
Epfd technical studies approach, and establishing a set of validated GSO reference links     Canada     2025-10-14
[ 738 ]  
 
Next steps on RR Article 22 epfd limits studies     Canada     2025-10-14
Results:837 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-12-19