International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP4A : Meeting 2025-10-27 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP4A  TD (2025-10-27) 

ITU-R R23-WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Meeting  from 2025-10-27 to 2025-11-06

held in Switzerland [Geneva]

Results:74 total items.
Result page:  Previous -  1 - 2
Temporary Documents  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 201 ]  
 
Working document on ACM performance objectives     WG 4A1     2025-11-06
[ 200 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELLING]     WG 4A1     2025-11-06
[ 199 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[INTERFERENCE-NGSO-NGSO/GSO]     WG 4A1     2025-11-06
[ 198 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R S.1526-1     WG 4A1     2025-11-06
[ 197 ]  
 
Detailed work plan for a revision to Recommendation ITU-R S.1503     WG 4A1     2025-11-06
[ 196 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R BO.1443-3 - Reference BSS earth station antenna patterns for use in interference assessment involving non-GSO satellites in frequency bands covered by RR Appendix 30     WG 4A1     2025-11-06
[ 195 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R S.1428-1 - Reference FSS earth-station radiation patterns for use in interference assessment involving non-GSO satellites in frequency bands between 10.7 GHz and 30 GHz     WG 4A1     2025-11-06
[ 194 ]  
 
Working document containing Supporting Material in relation to possible revision of ITU-R Recommendations S.1428 and BO.1443, where appropriate and applicable     WG 4A1     2025-11-06
[ 193 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in RR Article 22 of the Radio Regulations     WG 4A1     2025-11-06
[ 192 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R S.1325 - Simulation methodologies for determining statistics of short term interference between co frequency, codirectional non-geostationary-satellite orbit fixed-satellite service systems in circular orbits and other non-geostationary fixed satellite service systems...     WG 4A1     2025-11-06
[ 191 ]  
 
Consultation Meeting Draft Terms of Reference - Text elements for the Chair's Report on the development of Terms of Reference for the first Consultation Meeting as required under Resolution 76 (Rev.WRC-23)     WG 4A1     2025-11-06
[ 190 ]  
 
Stage 2 Process (Resolution 76 (Rev.WRC-23)) - Text elements for the Chair's Report on the development of the Stage 2 Process (Detailed Analysis at Consultation Meeting Based on Operational Parameters) as required under Resolution 76 (Rev.WRC-23)     WG 4A1     2025-11-06
[ 189 ]  
 
Stage 1 Process (Resolution 76 (Rev.WRC-23)) - Text elements for the Chair's Report on the development of the Stage 1 Process (Consultation Meeting Trigger) as required under Resolution 76     WG 4A1     2025-11-06
[ 188 ]  
 
Technical studies in response to WRC-23 minutes on Article 22 epfd limits [without any regulatory consequences [for information]]     WG 4A1     2025-11-05
[ 187 ]  
 
Revisions to working document towards draft CPM text for WRC-27 agenda item 1.3     WG 4A1     2025-11-05
[ 186 ]  
 
Working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)     WG 4A1     2025-11-05
[ 185 ]  
 
Work plan of the Working Group of the Plenary on Resolution ITU-R 74     WG PL     2025-11-05
[ 184 ]  
 
Working document towards a preliminary draft ITU-R Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services     WG PL     2025-11-05
[ 183 ]  
 
[Elements of the]working document towards a preliminary draft [new Recommendation ITU-R S.[NGSO DEORBITING]] - [Guidance] on safe and efficient deorbit and/or disposal strategies and methodologies for non-GSO [space stations/systems] involved in radiocommunication services after the end of their life     WG PL     2025-11-05
[ 182 ]  
 
Working document towards a draft new Handbook on Satellite Communications and Technologies     AHG Satellite Communications and Technologies Handbook     2025-11-05
[ 181 ]  
 
Draft work plan for the Handbook on Satellite Communications and Technologies     AHG Satellite Communications and Technologies Handbook     2025-11-05
[ 180 ]  
 
Draft reply liaison statement to Working Parties 4B and 4C (copy for information to working parties 5A and 5B)     AHG Satellite Communications and Technologies Handbook     2025-11-05
[ 179 ]  
 
Proposed elements for the implementation of Resolution 86 (Rev.WRC-07)     Chair, WP 4A     2025-10-31
[ 178 ]  
 
Terms of Reference of Sub-Working Group 4A1B - Technical studies on the EPFD limits in Article 22     WP 4A     2025-10-28
Results:74 total items.
Result page:  Previous -  1 - 2  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-11-06