Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 109 ]
|
Contribution to DBSG3 Table II-1: Concurrent attenuation and rainfall rate statistics in Toulouse
|
France
|
|
2025-02-05 |
|
[ 108 ]
|
Contribution to Recommendation ITU-R P.2108 and Report ITU-R P.2402 - Measurement input to Earth-to-space interference modelling
|
Telefon AB - LM Ericsson
|
|
2025-02-05 |
|
[ 107 ]
|
Simulations and model proposal of LoS probabilities
|
Telefon AB - LM Ericsson
|
|
2025-02-05 |
|
[ 106 ]
|
Revision of Question ITU-R 236/3 - Use of machine learning methods for radio-wave propagation studies
|
Korea (Rep. of)
|
Q236/3
|
2025-02-05 |
|
[ 105 ]
|
Revision of preliminary draft new Question ITU-R [LUNAR_PROPAGATION]/3 - Propagation characteristics and prediction methods required for lunar radiocommunications on the lunar environment
|
Korea (Rep. of)
|
AI1.15
|
2025-02-05 |
|
[ 104 ]
|
Preliminary draft editorial amendment to Recommendation ITU-R P.1511-3 - Topography for Earth-space propagation modelling
|
United States
|
|
2025-02-04 |
|
[ 103 ]
|
Update to the Working Party 3J Chair's Report Document 3J/67 Annex 15 - Recommendation ITU-R P.834-6
|
United States
|
|
2025-02-04 |
|
[ 102 ]
|
Preliminary draft new Question ITU-R [LUNAR_PROPAGATION]/3 - Propagation characteristics and prediction methods required for lunar radiocommunications on the lunar environment
|
United States
|
|
2025-02-04 |
|
[ 101 ]
|
Working document towards a preliminary draft new Recommendation ITU-R P.[LUNAR] - Methods and models for predicting lunar radio-wave propagation characteristics
|
United States
|
|
2025-02-04 |
|
[ 100 ]
|
Working document towards a preliminary draft new revision to Recommendation ITU-R P.311 - Update to Recommendation ITU-R P.311 and associated formatted tables for Lunar propagation measurement data
|
United States
|
|
2025-02-04 |
|
[ 99 ]
|
Discussion document for human shielding loss model of Recommendation ITU-R P.1409-3 - Propagation data and prediction methods for systems using high altitude platform stations and other elevated stations in the stratosphere at frequencies greater than about 0.7 GHz
|
Japan
|
|
2025-02-04 |
|
[ 98 ]
|
Proposed revision to Recommendation ITU-R P.1409-3 - Propagation data and prediction methods for systems using high altitude platform stations and other elevated stations in the stratosphere at frequencies greater than about 0.7 GHz
|
Japan
|
|
2025-02-04 |
|
[ 97 ]
|
Modifications to the preliminary draft revision of Recommendation ITU-R P.526-15 - Propagation by diffraction
|
Russian Federation
|
|
2025-02-03 |
|
[ 96 ]
|
Activity Report of Correspondence Group 3J-3K-3L-3M-27 - Application of machine learning for propagation studies
|
Chair, CG 3J-3K-3L-3M-27
|
|
2025-01-29 |
|
[ 95 ]
|
Correspondence Group 3J-23 activity Report - General slant path terrain diffraction model
|
Chair, CG 3J-23
|
|
2025-01-28 |
|
[ 94 ]
|
Report on the activities of Correspondence Group 3J-3K-3M-14 - Issues relating to the HAPS propagation model
|
Chair, CG 3J-3K-3M-14
|
|
2025-01-27 |
|
[ 93 ]
|
Evaluate the impact of antenna radiation pattern and slant path clutter loss model update proposals based on latest working document 3K/77
|
China
|
|
2025-01-24 |
|
[ 92 ]
|
Performance comparison analysis of two slant path clutter loss models in working document 3K/77
|
China
|
|
2025-01-24 |
|
[ 91 ]
|
Ray-tracing-based modified Recommendation ITU-R P.2108 clutter loss model for urban scenarios below 10 GHz
|
China
|
|
2025-01-24 |
|
[ 90 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R P.2040-3 - Dielectric properties of building between 100 and 400 GHz
|
China
|
|
2025-01-23 |
|
[ 89 ]
|
Information document about hybrid path loss of clutter loss and building entry loss
|
China
|
|
2025-01-23 |
|
[ 88 ]
|
Proposed draft modification to Recommendation ITU-R P.1621-2 - Propagation data required for the design of Earth-space systems operating between 20 THz and 375 THz
|
China
|
|
2025-01-23 |
|
[ 87 ]
|
Proposed modification to Recommendation ITU-R P.835-7 - Reference atmospheres
|
China
|
|
2025-01-23 |
|
[ 86 ]
|
Proposed supplement of Recommendation ITU-R P.834-9 - Minimum trapping frequency of evaporation duct
|
China
|
|
2025-01-23 |
|
[ 85 ]
|
Proposed modifications to Recommendation ITU-R P.310-10 - Definition of evaporation duct
|
China
|
|
2025-01-23 |
|
[ 84 ]
|
Discussion about Figure 13 in Recommendation ITU-R P.527-6
|
China
|
|
2025-01-23 |
|
[ 83 ]
|
Proposed modification to Recommendation ITU-R P.525-5 - Calculation of free-space attenuation
|
China
|
|
2025-01-23 |
|
[ 82 ]
|
Preliminary draft new Question ITU-R [LUNAR_PROPAGATION]/3 - Propagation characteristics and prediction methods required for lunar radiocommunications on the lunar environment
|
CG 3J-26
|
|
2025-01-24 |
|
[ 81 ]
|
Report of the activities of the Correspondence Group on Modelling lunar radio-wave propagation - June 2024 to February 2025 - Modelling lunar radio-wave propagation
|
Chair, CG 3J-26
|
|
2025-01-24 |
|
[ 80 ]
|
Liaison statement to key SDOs on the publication of GR THz 003 and GR THz 004
|
ETSI ISG THz
|
|
2025-01-23 |
|
[ 79 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D) - WRC-27 agenda item 1.10
|
WP 6A
|
AI1.10
|
2024-11-19 |
|
[ 78 ]
|
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 5A, 5B, 5C, 5D, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1
|
WP 4A
|
AI1.1
|
2024-11-07 |
|
[ 77 ]
|
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Additional information on passive sensors in the EESS for WRC-27 agenda item 1.8
|
WP 7C
|
AI1.8
|
2024-10-01 |
|
[ 76 ]
|
Reply liaison statement to ITU-R Working Party 3J (copied for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 3J questions related to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2024-09-30 |
|
[ 75 ]
|
Liaison statement to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2024-09-30 |
|
[ 74 ]
|
Reply liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7C for information) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8
|
WP 7D
|
AI1.8
|
2024-09-27 |
|
[ 73 ]
|
Reply liaison statement to Working Parties 3J, 3K and 3M - Relevant technical information to support studies in preparation of WRC-27 agenda items
|
WP 7D
|
AI1.8, AI1.7, AI1.3, AI1.18, AI1.17, AI1.16, AI1.15, AI1.11, AI1.10, AI1.1
|
2024-09-27 |
|
[ 72 ]
|
Determination and mitigation of electromagnetic compatibility issues for IMT (5G) network under tropospheric duct effect
|
ATDI
|
|
2024-09-21 |
|
[ 71 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7C and 7D for information) - Information on the standard frequency and time signal service with regards to WRC-27 agenda item 1.15 on lunar communications
|
WP 7A
|
AI1.15
|
2024-09-23 |
|
[ 70 ]
|
Information on the preparation of texts for the draft CPM Report to WRC-27
|
Chair, CPM-27
|
|
2024-07-09 |
|
[ 69 ]
|
Reply liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3J, 3K and 3M) - Considerations on draft Recommendation ITU-T K.DMEI of ITU-T Study Group 5
|
WP 5D
|
|
2024-07-05 |
|
[ 68 ]
|
Liaison statement on draft Recommendation ITU-T K.DMEI -Determination and mitigation of electromagnetic compatibility issues for 5G TDD network under tropospheric duct effect
|
ITU-T SG5
|
|
2024-06-18 |
|
[ 67 ]
+Ann.1-40 |
Report on the meeting of Working Party 3J (Denver, Colorado, USA, 29 May - 7 June 2024)
|
Chair, WP 3J
|
|
2024-06-08 |
|
[ 66 ]
|
Final list of participants WP 3J (Denver, Colorado, USA, 29 May - 7 June 2024)
|
Director, BR
|
|
2024-06-08 |
|
[ 65 ]
|
List of documents issued (Documents 3J/1 - 3J/65)
|
BR, Study Groups Department
|
|
2024-06-01 |
|
[ 64 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15
|
WP 5C
|
AI1.15
|
2024-05-29 |
|
[ 63 ]
|
Reply liaison statement to Working Party 7C (copy to Working Parties 3J, 3M, 4A, 4C, 5A and 5B for information) - Relevant technical information to support studies under WRC-27 agenda item 1.18 and update on supporting materials
|
WP 5C
|
AI1.18
|
2024-05-29 |
|
[ 62 ]
|
Liaison statement to Working parties 4A, 4C, 5A, 5B, 3J and 3M (copy to Working Parties 1A, 4B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
|
WP 5C
|
AI1.10
|
2024-05-29 |
|
[ 61 ]
|
Contribution to DBSG3 Table IV-1: Rain rate statistics in Cochabamba
|
Spain
,
France
|
|
2024-05-17 |
|
[ 60 ]
|
Comparison between ERA5 cloud parameters and simultaneous experimental rainfall rate in Madrid
|
Spain
|
|
2024-05-17 |
Results:159 total items. Result page:
Previous -
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):