Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 42 ]
|
Reply to liaison statement to WP 3L - Ionospheric parameters in connection with modelling approaches in support of adaptive HF communication systems in the fixed service
|
WP 6E
|
|
2004-11-23 |
|
[ 41 ]
+Ann.1-18 |
Report on the meeting of Working Party 3L (Geneva, 25-27 October 2004)
|
Chairman, WP 3L
|
|
2004-10-29 |
|
[ 40 ]
|
Final list of Participants
|
Director, BR
|
|
2004-10-26 |
|
[ 39 ]
|
List of documents issued
|
BR Study Group Department
|
|
2004-10-22 |
|
[ 38 ]
|
Liaison statement to WPs 3L, 6E, 7A, 7D, 8A, 8B and 9C - Impact of cable and power line telecommunications systems on radiocommunications systems operating in the LF, MF, HF and VHF bands below 80 MHz
|
WP 1A
|
|
2004-10-20 |
|
[ 37 ]
|
Progress towards the revision of the Recommendation ITU-R P.313-9 and the provision of information relating to short-term prediction
|
United Kingdom of Great Britain and Northern Ireland
|
213-1/3
|
2004-10-12 |
|
[ 36 ]
|
Improvements in the modelling of day to day variability of ionospheric characteristics
|
United Kingdom of Great Britain and Northern Ireland
|
229/3
|
2004-10-12 |
|
[ 35 ]
|
Progress towards the revision of the maps for FOF2
|
United Kingdom of Great Britain and Northern Ireland
|
212-1/3
|
2004-10-12 |
|
[ 34 ]
|
Draft response to the liaison statement from Working Party 9C (Doc. 3L/18) - Ionospheric parameters in connection with modelling approaches in support of adaptive HF communication systems in the fixed service
|
United Kingdom of Great Britain and Northern Ireland
|
|
2004-10-12 |
|
[ 33 ]
|
Measurements of the Doppler and multipath spread of HF signals received over a path oriented along the mid-latitude trough
|
United Kingdom of Great Britain and Northern Ireland
|
229/3, 227-1/3
|
2004-10-12 |
|
[ 32 ]
|
Modelling the ionospheric trough
|
United Kingdom of Great Britain and Northern Ireland
|
229/3, 212/3
|
2004-10-12 |
|
[ 31 ]
|
The concept of HF nomaly domain
|
Brazil (Federative Republic of)
|
229/3
|
2004-10-11 |
|
[ 30 ]
|
Selection of the path's reference points in LF/MF skywave prediction
|
LS telcom AG
|
225/3
|
2004-10-11 |
|
[ 29 ]
|
Propagation at frequencies below about 2 MHz - Chairman's Report for the period of November 2003 to October 2004
|
Chairman, Rapporteur Group 3L-RG2
|
|
2004-10-11 |
|
[ 28 ]
|
Proposed revision of Recommendation ITU-R P.684-3 - Prediction of field strength at frequencies below about 150 kHz
|
Japan
|
225/3
|
2004-10-07 |
|
[ 27 ]
|
Nation-wide survey for measuring LF wave field strengths in winter
|
Japan
|
225/3
|
2004-10-07 |
|
[ 26 ]
(Rev.1) |
Liaison statement to WPs 3L, 6E, 7D, 8A and 8B - Draft CPM text for WRC-07 Agenda item 1.13
|
WP 9C
|
|
2004-10-06 |
|
[ 25 ]
+Add.1 |
Measurements and Data Banks
|
Rapporteur Group 3L-RG4, Chairman's Report
|
225/3
|
2004-09-30 |
|
[ 24 ]
|
Working document toward a preliminary draft new Recommendation - Radiation and propagation of emissions from access PLT systems using overhead power lines
|
United States of America
|
228/3
|
2004-10-05 |
|
[ 23 ]
|
Boundaries for Europe in LF/MF software
|
LS Telcom AG
|
|
2004-09-30 |
|
[ 22 ]
|
Correction in summation of nuissance field in Recommendation ITU-R P.842-2
|
LS Telcom AG
|
|
2004-09-29 |
|
[ 21 ]
|
Prediction of propagation parameters for HF digital systems
|
Australia
|
229/3
|
2004-09-27 |
|
[ 20 ]
|
Liaison statement to WP 9C (Copy to WP 6E for information) - Ionospheric parameters in connection with modelling approaches in support of adaptive HF communication systems in the fixed service
|
Chairman WP 3L
|
|
2004-09-16 |
|
[ 19 ]
|
Liaison statement to WPs 3L, 8A and 9C - Establishment of a Rapporteur for the preparation of CPM-06 text on Agenda item 1.13, Resolution 544
|
WP 6E
|
|
2004-05-18 |
|
[ 18 ]
|
Liaison statement to WP 3L (copy to WP 6E for information) - Discussion of ionospheric parameters for consideration by WP 3L in connection with modelling approaches supporting adaptive HF communication systems in the fixed service
|
WP 9C
|
|
2004-02-27 |
|
[ 17 ]
|
Liaison statement to Working Parties 3J and 3L - Signal intensity measurements in the MF band
|
WP 9C
|
|
2004-02-27 |
|
[ 16 ]
+Ann.1-16 |
Report on the meeting of Working Party 3L, Fortaleza, 26-28 November 2003
|
Chairman, WP 3L
|
|
2003-12-10 |
|
[ 15 ]
|
Final list of participants
|
WP 3L
|
|
2003-12-01 |
|
[ 14 ]
|
List of documents issued
|
BR, Study Group Department
|
|
2003-11-13 |
|
[ 13 ]
|
Information document on status of ionospheric scintillation model in Recommendation ITU-R P.531
|
European Space Agency (ESA)
|
|
2003-11-13 |
|
[ 12 ]
|
Measurements and data banks
|
Chairman, Rapporteur Group 3L-RG4
|
225/3
|
2003-11-13 |
|
[ 11 ]
|
A road map for the development of an HF propagation prediction procedure suitable for digitally modulated systems
|
Convener, Correspondence Group on Prediction of ..
|
|
2003-11-13 |
|
[ 10 ]
|
Propagation at frequencies below about 2 MHz - Chairman's Report for the period of July 2002 to November 2003
|
Chairman, Rapporteur Group 3L-RG2
|
|
2003-11-12 |
|
[ 9 ]
|
Progress report of activities
|
Convenor, Correspondence Group on Prediction of ..
|
|
2003-11-12 |
|
[ 8 ]
|
Liaison statement to Working Parties 3K, 3L and 3M - Compatibility between radiocommunication systems and high data rate telecommunication systems using electricity power supply or telephone distribution wiring
|
WP 1A
|
|
2003-11-11 |
|
[ 7 ]
|
WRC-07 Agenda items and allocation of preparatory work by the CPM06-1 to responsible, contributing and interested groups involving Study Group 3
|
BR, SGD
|
|
2003-11-11 |
|
[ 6 ]
|
Liaison statement to Working Party 3L - Prediction methods for adaptive HF system operation
|
Chairman, WP 9C
|
|
2003-11-11 |
|
[ 5 ]
|
HF signal intensity anomaly in Equatorial zone
|
Brazil (Federative Republic of)
|
229/3
|
2003-11-10 |
|
[ 4 ]
|
Proposed revision of Recommendation ITU-R P.684-3 - Prediction of field strength at frequencies below about 150 kHz
|
Japan
|
225/3
|
2003-11-04 |
|
[ 3 ]
|
A correction of a typographical error about ionospheric scintillation (Rec. ITU-R P.531-7)
|
China (People's Republic of)
|
|
2003-10-28 |
|
[ 2 ]
|
Proposed modification to Question ITU-R 225-3/3
|
Vatican City State
|
225/3
|
2003-09-26 |
|
[ 1 ]
|
Documents to be carried over from the 2000-2003 study period
|
WP 3L
|
|
2003-07-21 |
Results:92 total items. Result page:
Previous -
1 -
2
|
Multiple Document Download: Formats and Languages to be included (when available):