Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 145 ]
|
List of documents issued
|
BRSGD
|
|
2001-10-11 |
|
[ 144 ]
|
Draft text for the CPM Report dealing with future agenda items
|
WP 9C
|
|
2001-10-11 |
|
[ 143 ]
|
Executive Summary of the meeting of Working Party 9D
|
Chairman, WP 9D
|
|
2001-10-11 |
|
[ 142 ]
+Add.1 |
Executive Summary of the meeting of Working Party 9C
|
Chairman, WP 9C
|
|
2001-10-11 |
|
[ 141 ]
(Rev.1) |
Proposed draft CPM text for WRC-03 agenda item 1.13 Resolution 734
|
WP 9B
|
|
2001-10-11 |
|
[ 140 ]
|
Status of Questions assigned to WP 9C
|
WP 9C
|
|
2001-10-11 |
|
[ 139 ]
|
Draft revision of Question ITU-R 133/9 - Sharing criteria between the fixed and land mobile services in the frequency bands above about 0.5 GHz
|
WP 9D
|
|
2001-10-11 |
|
[ 138 ]
|
Draft new Question ITU-R [Doc. 9/138]/9 - Criteria for sharing between stations in the fixed service and stations in the aeronautical mobile service in bands between about 37 GHz and 50 GHz
|
WP 9D
|
|
2001-10-11 |
|
[ 137 ]
|
Draft revision of Question ITU-R 125-5/9 - Point-to-multipoint fixed wireless systems used in access or back-haul networks
|
WP 9B
|
|
2001-10-11 |
|
[ 136 ]
|
Draft revision of Question ITU-R 136-1/9 - Radio-frequency channel arrangements for digital fixed wireless systems operating in frequency bands below about 17 GHz
|
WP 9B
|
|
2001-10-11 |
|
[ 135 ]
|
Draft revision of Question ITU-R 127-3/9 - Maximum allowable performance and availability degradations of fixed wireless systems due to various sources of interference
|
WP 9A
|
|
2001-10-11 |
|
[ 134 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.1110-2 - Adaptive radio systems for frequencies below about 30 MHz
|
SG 9
|
|
2001-10-11 |
|
[ 133 ]
(Rev.1-2) |
Draft new Recommendation [9C/HF-Adaptive] Predition methods for adaptive HF system planning and operation
|
SG 9
|
147/9, 205/9
|
2002-10-08 |
|
[ 132 ]
(Rev.1) |
Draft new Recommendation ITU-R F.[HF-Engineering] - Planning, design and implementation of HF fixed service radio systems
|
SG 9
|
|
2001-10-11 |
|
[ 131 ]
(Rev.1) |
Draft modification of Recommendation ITU-R F.758-2 - Considerations in the development of criteria for sharing between the terrestrial fixed service and other services
|
SG 9
|
|
2001-10-11 |
|
[ 130 ]
(Rev.1) |
Draft new Recommendation ITU-R F.[FWA4GHz-EESS] - Operational and deployment requirements for fixed wireless access (FWA) systems in the fixed service in Region 3 to ensure the protection of systems in the Earth exploration-satellite service ...
|
SG 9
|
|
2001-10-11 |
|
[ 129 ]
|
Report of the April 2002 meeting
|
Chairman, WP 9B
|
|
2001-10-11 |
|
[ 128 ]
+Add.1 |
Executive summary - Working Party 9A - held in Geneva (3-10 April 2002)
|
Chairman, WP 9A
|
|
2001-10-11 |
|
[ 127 ]
|
Summary of draft Recommendations
|
WP 9B
|
|
2001-10-11 |
|
[ 126 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.1401 - Methodology for the identification of frequency bands for fixed wireless access systems
|
SG 9
|
|
2001-10-11 |
|
[ 125 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.746-5 - Radio-frequency arrangements for fixed service systems
|
SG 9
|
|
2001-10-11 |
|
[ 124 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.757-2 - Basic system requirements and performance objectives for fixed wireless access using mobile-derived technologies offering telephony and data communication services
|
SG 9
|
|
2001-10-11 |
|
[ 123 ]
(Rev.1) |
Draft new Recommendation ITU-R F.[9B/HAPS-FWA] - Interference evaluation from fixed service systems using high altitude platform stations to conventional fixed service systems in the bands 27.5-28.35 and 31.0-31.3 GHz
|
SG 9
|
|
2001-10-11 |
|
[ 122 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.595-7 - Radio-frequency channel arrangements for fixed wireless systems operating in the 18 GHz frequency band
|
SG 9
|
|
2001-10-11 |
|
[ 121 ]
(Rev.1) |
Draft new Recommendation ITU-R F.[9A/NGSO-3] Interference criteria to protect fixed wireless systems from time varying aggregate interference produced by non-GSO satellites from other services sharing the 37-40 GHz and 40.5-43.5 GHz bands on ..
|
SG 9
|
|
2001-10-11 |
|
[ 120 ]
(Rev.1) |
Draft new Recommendation ITU-R F.[9B/HAPS1] - Frequency sharing between systems in the fixed service using high altitude platform stations and conventional systems in the fixed service in the bands 47.2-47.5 and 47.9-48.2 GHz
|
SG 9
|
|
2001-10-11 |
|
[ 119 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.1520-1 - Radio-frequency arrangements for systems in the fixed service operating in the band 31.8-33.4 GHz
|
SG 9
|
|
2001-10-11 |
|
[ 118 ]
(Rev.1) |
Draft new Recommendation ITU-R F.[FS-BSS 2.6 GHz] - Power flux-density threshold levels between systems in the broadcasting-satellite service (sound) in the geostationary and non-geostationary satellite orbits for space-to-Earth ......
|
SG 9
|
|
2001-10-11 |
|
[ 117 ]
(Rev.1) |
Draft new Recommendation ITU-R F.[HAPS-RAS] - Interference evaluation of the fixed service using High Altitude Platform Stations (HAPs) to protect the radio astronomy service (RAS) from uplink transmission in HAPS systems in the 31.3-31.8 GHz...
|
SG 9
|
|
2001-10-11 |
|
[ 116 ]
(Rev.1) |
Draft revision of new Recommendation ITU-R F.[Doc. 9/BL/26] - Impact of uplink transmission in the fixed service using high altitude platform stations (HAPs) in the Earth exploration-satellite service (passive) in the 31.3-31.8 GHz band
|
SG 9
|
|
2001-10-11 |
|
[ 115 ]
(Rev.1) |
Draft new Recommendation ITU-R F.[9B/HAPS-MT] - Interference mitigation techniques for use by high altitude platform stations (HAPS) in the 27.5-28.35 GHz and 31.0-31.3 GHz bands
|
SG 9
|
|
2001-10-11 |
|
[ 114 ]
|
Updating of certain maintained Recommendations
|
WP 9B
|
|
2001-10-11 |
|
[ 113 ]
(Rev.1) |
Preliminary draft new Recommendation ITU-R F.[9A/EPAB] - Error performance and availability estimation for synchronous digital hierarchy terrestrial fixed wireless systems
|
SG 9
|
|
2001-10-11 |
|
[ 112 ]
|
Report from special Rapporteur representing SG 9 of the first meeting and activities of Task Group 6/8
|
Israel (State of)
|
|
2001-10-11 |
|
[ 111 ]
|
Report to the meeting of ITU-R Study Group 9 (Geneva, 15-16 April 2002)
|
Chairman, SG 9
|
|
2001-10-11 |
|
[ 110 ]
|
Preliminary status of SF-series Recommendations on frequency sharing and coordination between systems in the fixed-satellite service and fixed service systems
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 109 ]
|
Preliminary status of texts
|
SG 9
|
|
2001-10-11 |
|
[ 108 ]
|
DNR ITU-R SF.[4/85-9/108]-Example approach for determination of the composite area within which interference to fixed service stations form earth stations on board vessels when operating in motion near a coastline whould need to be evaluated
|
WP 4-9S
|
|
2001-10-11 |
|
[ 107 ]
|
Summary Record for the Joint Meeting of ITU-R Study Groups 4 and 9 (Geneva, 24 October 2001)
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 106 ]
|
Summary record of the second plenary meeting (Geneva, 12 October 2001)
|
SG 9
|
|
2001-10-11 |
|
[ 105 ]
|
Summary record of the first Plenary Meeting (Geneva, 11 October 2001)
|
SG 9
|
|
2001-10-11 |
|
[ 104 ]
|
List of participants
|
BRDMU
|
|
2001-10-11 |
|
[ 103 ]
|
Summary of Draft Recommendations
|
WP 4-9S
|
|
2001-10-11 |
|
[ 102 ]
|
Executive Report of the meetings of WP 4-9S
|
WP 4-9S
|
|
2001-10-11 |
|
[ 101 ]
(Rev.1) |
Draft new Recommendation ITU-R SF.[Doc.4/80-9/101] - Methodology to evaluate the impact of space-to-Earth interference from the fixed-satellite service to the fixed service in frequency bands where precipitation is the predominant fade ....
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 100 ]
|
Draft revision of Question ITU-R 240/4 - Criteria for frequency sharing between the fixed-satellite service
|
WP 4-9S
|
|
2001-10-11 |
|
[ 99 ]
|
Draft revision of Question ITU-R 209/9 - Criteria for frequency sharing between the fixed service and the fixed-satellite service using highly elliptical orbits as it affects the fixed service
|
WP 4-9S
|
|
2001-10-11 |
|
[ 98 ]
(Rev.1) |
Draft Revision of Recommendation ITU-R SF.674-1 - Determination of impact on the fixed service operating in the 11.7-12.2 GHz band when GSO fixed-satellite service networks in Region 2 exceed power flux-density thresholds in Res. 77 (WRC-2000)
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 97 ]
(Rev.1) |
Draft revision to Rec. ITU-R SF.1484 - Maximum allowable values of power flux-density at the surface of the Earth produced by non-geostationary satellite in the fixed-satellite service operating in the 37.5-42.5 GHz bands to protect the ...
|
WP 4-9S
|
|
2001-10-11 |
|
[ 96 ]
(Rev.1) |
DNR ITU-R SF.[Doc. 4/75-9/96] - Maximum allowable values of power flux-density at the surface of the Earth by geostationary satellites in the fixed-satellite service operating in the 37.5-42.5 GHz band to protect the fixed service
|
SGs 4 and 9
|
|
2001-10-11 |
Results:195 total items. Result page:
Previous -
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):