Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 112 ]
|
Report from special Rapporteur representing SG 9 of the first meeting and activities of Task Group 6/8
|
Israel (State of)
|
|
2001-10-11 |
|
[ 111 ]
|
Report to the meeting of ITU-R Study Group 9 (Geneva, 15-16 April 2002)
|
Chairman, SG 9
|
|
2001-10-11 |
|
[ 110 ]
|
Preliminary status of SF-series Recommendations on frequency sharing and coordination between systems in the fixed-satellite service and fixed service systems
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 109 ]
|
Preliminary status of texts
|
SG 9
|
|
2001-10-11 |
|
[ 108 ]
|
DNR ITU-R SF.[4/85-9/108]-Example approach for determination of the composite area within which interference to fixed service stations form earth stations on board vessels when operating in motion near a coastline whould need to be evaluated
|
WP 4-9S
|
|
2001-10-11 |
|
[ 107 ]
|
Summary Record for the Joint Meeting of ITU-R Study Groups 4 and 9 (Geneva, 24 October 2001)
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 106 ]
|
Summary record of the second plenary meeting (Geneva, 12 October 2001)
|
SG 9
|
|
2001-10-11 |
|
[ 105 ]
|
Summary record of the first Plenary Meeting (Geneva, 11 October 2001)
|
SG 9
|
|
2001-10-11 |
|
[ 104 ]
|
List of participants
|
BRDMU
|
|
2001-10-11 |
|
[ 103 ]
|
Summary of Draft Recommendations
|
WP 4-9S
|
|
2001-10-11 |
|
[ 102 ]
|
Executive Report of the meetings of WP 4-9S
|
WP 4-9S
|
|
2001-10-11 |
|
[ 101 ]
(Rev.1) |
Draft new Recommendation ITU-R SF.[Doc.4/80-9/101] - Methodology to evaluate the impact of space-to-Earth interference from the fixed-satellite service to the fixed service in frequency bands where precipitation is the predominant fade ....
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 100 ]
|
Draft revision of Question ITU-R 240/4 - Criteria for frequency sharing between the fixed-satellite service
|
WP 4-9S
|
|
2001-10-11 |
|
[ 99 ]
|
Draft revision of Question ITU-R 209/9 - Criteria for frequency sharing between the fixed service and the fixed-satellite service using highly elliptical orbits as it affects the fixed service
|
WP 4-9S
|
|
2001-10-11 |
|
[ 98 ]
(Rev.1) |
Draft Revision of Recommendation ITU-R SF.674-1 - Determination of impact on the fixed service operating in the 11.7-12.2 GHz band when GSO fixed-satellite service networks in Region 2 exceed power flux-density thresholds in Res. 77 (WRC-2000)
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 97 ]
(Rev.1) |
Draft revision to Rec. ITU-R SF.1484 - Maximum allowable values of power flux-density at the surface of the Earth produced by non-geostationary satellite in the fixed-satellite service operating in the 37.5-42.5 GHz bands to protect the ...
|
WP 4-9S
|
|
2001-10-11 |
|
[ 96 ]
(Rev.1) |
DNR ITU-R SF.[Doc. 4/75-9/96] - Maximum allowable values of power flux-density at the surface of the Earth by geostationary satellites in the fixed-satellite service operating in the 37.5-42.5 GHz band to protect the fixed service
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 95 ]
(Rev.1) |
This document has been withdrawn
|
SG 9
|
|
2001-10-11 |
|
[ 94 ]
(Rev.1) |
This document has been withdrawn
|
SG 9
|
|
2001-10-11 |
|
[ 93 ]
|
List of participants
|
BRDMU
|
|
2001-10-11 |
|
[ 92 ]
|
Proposed deletion of Question ITU-R 163/9
|
WP 9D
|
|
2001-10-11 |
|
[ 91 ]
|
Draft liaison statement from Study Group 9 to Task group 6/8 - Information relevant to frequency sharing between the broadcasting service and the fixed service in the bands 174-230 MHz and 470-862 MHz
|
WP 9D
|
|
2001-10-11 |
|
[ 90 ]
|
Draft revision of Question ITU-R 118-3/9 - Sharing criteria between the mobile-satellite services and the fixed service
|
WP 9D
|
|
2001-10-11 |
|
[ 89 ]
|
Draft new Question ITU-R [FWA-RL 3.5 GHz] - Assessment of sharing and mitigation options to facilitate the use of the band 3 400-3 700 MHz by certain FWA and radiolocation systems
|
WP 9D
|
|
2001-10-11 |
|
[ 88 ]
(Rev.1) |
Draft revision to Recommendation ITU-R F.1107 - Probabilistic analysis for calculating interference into the fixed service from satellites occupying the geostationary orbit
|
SG 9
|
|
2001-10-11 |
|
[ 87 ]
|
List of documents issued
|
BRSGD
|
|
2001-10-11 |
|
[ 86 ]
(Rev.1) |
Draft new Recommendation ITU-R F.[9D/FS-RN 32 GHz] - Mitigation techniques for use in reducing the potential for interference between airborne stations in the radionavigation service and stations in the fixed service in the band 31.8-33.4 GHz
|
SG 9
|
|
2001-10-11 |
|
[ 85 ]
(Rev.1) |
Executive summary of the meeting of Working Party 9D (Geneva, 13-21 March and 2-10 October 2001)
|
Chairman, WP 9D
|
|
2001-10-11 |
|
[ 84 ]
(Rev.1) |
Draft new Recommendation ITU-R F.[HAPS-EESS] - Impact of uplink transmission in the fixed service using high altitude platform stations (HAPS) on the Earth exploration-satellite service (passive) in the 31.3-31.8 GHz band
|
SG 9
|
|
2001-10-11 |
|
[ 83 ]
+Add.1 |
Executive summary of the meeting of Working Party 9A
|
Acting Chairman, WP 9A
|
|
2001-10-11 |
|
[ 82 ]
|
Chairman's Report on the Working Party 9B meeting
|
Chairman, WP 9B
|
|
2001-10-11 |
|
[ 81 ]
|
Summaries of draft Recommendations
|
WP 9B
|
|
2001-10-11 |
|
[ 80 ]
|
Draft Revision of Question ITU-R 108-1/9 - Radio-frequency channel arrangements for fixed wireless systems operating in frequency bands above about 17 GHz
|
WP 9B
|
|
2001-10-11 |
|
[ 79 ]
|
Draft Revision of Question ITU-R 107-1/9 - Characteristics of fixed wireless systems operating in frequency bands above about 17 GHz
|
WP 9B
|
|
2001-10-11 |
|
[ 78 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.1498 - Deployment characteristics of fixed service in the band 37-40 GHz for use in sharing studies
|
SG 9
|
|
2001-10-11 |
|
[ 77 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.746-5 - Radio-frequency channel arrangements for fixed service systems
|
SG 9
|
|
2001-10-11 |
|
[ 76 ]
|
Report of Working Party 9C meeting (Geneva, 8-10 October 2001)
|
Chairman, WP 9C
|
|
2001-10-11 |
|
[ 75 ]
(Rev.1) |
Draft new Recommendation ITU-R F.[KA-HAPS] - Technical and operational characteristics for the fixed service using high platform stations in the bands 27.5-28.35 GHz and 31.0-31.3 GHz
|
SG 9
|
|
2001-10-11 |
|
[ 74 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.1491 - Error performance objectives for real digital radio links used in the national portion of a 27 500 km hypothetical reference path at or above the primary rate
|
SG 9
|
|
2001-10-11 |
|
[ 73 ]
(Rev.1) |
Proposal of amendments of Recommendation ITU-R F.1397-1
|
SG 9
|
|
2001-10-11 |
|
[ 72 ]
|
Proposal for deletion of Recommendations ITU-R F.1092-1 and ITU-R F.1189-1
|
WP 9A
|
|
2001-10-11 |
|
[ 71 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.387-8 - Radio-frequency channel arrangement for radio-relay system operating in the 11 GHz band
|
SG 9
|
|
2001-10-11 |
|
[ 70 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.1404 - Minimum propagation attenuation due to atmospheric gases for use in frequency sharing studies between systems in the fixed service and systems in the broadcasting-satellite, mobile-satellite and ...
|
SG 9
|
|
2001-10-11 |
|
[ 69 ]
|
Editorial updating of Recommendation ITU-R F.1405 - Guidance to facilitate coordination and use of frequency bands shared between the fixed service and mobile-satellite service in the frequency range 1-3 GHz
|
WP 9D
|
|
2001-10-11 |
|
[ 68 ]
(Rev.1) +Add.1 |
Draft new Recommendation ITU-R F.[Maintenance] - Performance limits for maintenance of digital fixed wireless systems operating in PDH- and SDH-based international paths and sections
|
SG 9
|
|
2001-10-11 |
|
[ 67 ]
|
Questions assigned to Working Party 9B
|
WP 9B
|
|
2001-10-11 |
|
[ 66 ]
|
Liaison statement to Study Groupes, 1, 3, 7. 8, 9 and Special Committee - First session of the Regional Radiocommunication Conference for the revision of the European Broadcasting Agreement, Stockholm, 1991..
|
SG 6
|
|
2001-10-11 |
|
[ 65 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.1105 - Transportable fixed radiocommunications equipment for relief operations
|
SG 9
|
|
2001-10-11 |
|
[ 64 ]
|
Draft new Question ITU-R [Coordination-FWS/9] - Technical and operational aspects of coordination for area-licensed fixed wireless systems
|
WP 9B
|
|
2001-10-11 |
|
[ 63 ]
|
Report to the meeting of ITU-R Study Group 9
|
Chairman, SG 9
|
|
2001-10-11 |
Results:162 total items. Result page:
Previous -
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):